The Hornsea Two Offshore Wind Farm Order 2016

S.I. 2016/844 · Made 16 August 2016 · Extends to England, Wales and Scotland

Up to date with all changes known to legislation.gov.uk, revised to 8 May 2018.

Infrastructure Planning

Made 16th August 2016

Coming into force 7th September 2016

An application under section 37 of the Planning Act 2008f1 (the “2008 Act”) has been made to the Secretary of State for an order granting development consent.

The application has been examined by a Panel, which has made a report to the Secretary of State under section 74(2) of the 2008 Act. After receiving the report, the Secretary of State requested further information from various persons.

The Secretary of State has considered the report and recommendation of the Panel, has taken into account the environmental information in accordance with regulation 3 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009f2 and has had regard to the documents and matters referred to in section 104(2) of the 2008 Act.

The Secretary of State, having decided the application, has determined to make an order giving effect to the proposals comprised in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.

Accordingly, the Secretary of State, in exercise of the powers conferred by sections 114 and 120 of the 2008 Act, makes the following Order:

Annotations to the whole text

Footnotes

f1

2008 c.29. Section 37 was amended by section 137(5) of, and paragraph 5 of Schedule 13 to, the Localism Act 2011 (c.20). Section 74(2) was amended by paragraph 29(2) of that Schedule. Section 104(2) was amended by paragraph 49 of that Schedule and section 58 of the Marine and Coastal Access Act 2009 (c.23). Section 114 was amended by paragraph 55 of Schedule 13 to the Localism Act 2011. Section 120 was amended by section 140 of, and paragraph 60 of Schedule 13 to, that Act.

f2

S.I. 2009/2263. Regulation 3 was amended by S.I. 2012/635 and 2012/787.

Contents

  1. Part 1: Preliminary
  2. 1Citation and commencement
  3. 2Interpretation
  4. 3Disapplication of legislative provisions
  5. 4Guarantees in respect of payment of compensation
  6. 5Defence to proceedings in respect of statutory nuisance
  7. Part 2: Principal powers
  8. 6Development consent, etc. granted by Order
  9. 7Maintenance of authorised project
  10. 8Operation of generating stations
  11. Part 3: Streets
  12. 9Street works
  13. 10Application of New Roads and Street Works Act 1991
  14. 11Temporary stopping up of streets
  15. 12Access to works
  16. 13Agreements with street authorities
  17. 14Highway improvements
  18. Part 4: Supplemental powers
  19. 15Discharge of water
  20. 16Protective work to buildings
  21. 17Authority to survey and investigate land
  22. Part 5: Powers of acquisition, etc.
  23. 18Compulsory acquisition of land
  24. 19Compulsory acquisition of rights
  25. 20Time limit for exercise of authority to acquire land compulsorily
  26. 21Private rights
  27. 22Application of Compulsory Purchase (Vesting Declarations) Act 1981
  28. 23Acquisition of subsoil or airspace only
  29. 24Acquisition of part of certain properties
  30. 25Rights under or over streets
  31. 26Temporary use of land for carrying out authorised project
  32. 27Temporary use of land for maintaining authorised project
  33. 28Statutory undertakers
  34. 29Recovery of costs of new connections
  35. Part 6: Operations
  36. 30Felling or lopping of trees and removal of hedgerows
  37. 31Trees subject to tree preservation orders
  38. Part 7: Miscellaneous and general
  39. 32Operational land for purposes of 1990 Act
  40. 33Procedure in relation to approvals, etc. under requirements
  41. 34Offshore works: abandonment or decay
  42. 35Transfer of benefit of Order
  43. 36Deemed marine licences under Marine and Coastal Access Act 2009
  44. 37Saving for Trinity House
  45. 38Crown rights
  46. 39Protective provisions
  47. 40Certification of plans, etc.
  48. 41Arbitration
  49. Signature
  50. Schedule 1: Authorised project
  51. Part 1: Authorised development
  52. 1Paragraph 1
  53. 2Paragraph 2
  54. 3Paragraph 3
  55. 4Paragraph 4
  56. 2Ancillary works
  57. Part 3: Requirements
  58. 1Time limits
  59. 2Detailed design parameters
  60. 3Colour and lighting
  61. 4Foundation methods
  62. 5Archaeology landward of mean low water springs
  63. 6Ecological management plan landward of mean low water springs
  64. 7Code of construction practice
  65. 8Landscape scheme
  66. 9Implementation and maintenance of landscaping
  67. 10Offshore decommissioning
  68. 11Highway accesses
  69. 12Contaminated land and groundwater scheme
  70. 13Surface water drainage scheme
  71. 14Colour and detailed design approval: electrical transmission stations
  72. 15Access road within plots 45 to 49
  73. 16Port traffic management plan
  74. 17Employment and skills plan
  75. 18Offshore co-operation
  76. 19Compensation compounds
  77. 20Onshore decommissioning plan
  78. 21North Coates airfield
  79. 22Control of noise during operational phase
  80. 23Onshore co-operation
  81. 24Intertidal access management plan
  82. 25Navigational safety at Saturn, Mimas and Tethys offshore platforms
  83. 26Requirement for written approval
  84. 27Amendments to approved plans, etc.
  85. Schedule 2Streets subject to street works
  86. Schedule 3Streets to be temporarily stopped up
  87. Schedule 4Access to works
  88. Schedule 5Land in which only new rights, etc. may be acquired
  89. Schedule 6: Modification of compensation and compulsory purchase enactments for creation of new rights, etc.
  90. 1Compensation enactments modified
  91. 2Land Compensation Act 1973 modified
  92. 3Compulsory Purchase Act 1965 modified
  93. 4Compulsory Purchase Act 1965 modified
  94. 5Compulsory Purchase Act 1965 modified
  95. 6Compulsory Purchase Act 1965 modified
  96. 7Compulsory Purchase Act 1965 modified
  97. 8Compulsory Purchase Act 1965 modified
  98. 9Compulsory Purchase Act 1965 modified
  99. Schedule 7: Land of which temporary possession may be taken
  100. 1Authorised project
  101. 2Compensation compounds
  102. 3Authorised project: access
  103. 4Compensation compounds: access
  104. Schedule 8: Marine Licence A1: Project A – Generation Assets
  105. Part 1: Licensed activities
  106. 1Interpretation
  107. 2Details of licensed activities
  108. 3Maintenance of authorised project
  109. 4Duration
  110. Part 2: Licence conditions
  111. 1Design parameters
  112. 2Design parameters
  113. 3Navigational practice, safety and emergency response
  114. 4Aids to navigation
  115. 5Notifications and inspections
  116. 6Chemicals, drilling and debris
  117. 7Force majeure
  118. 8Pre-construction plans and documentation
  119. 9Pre-construction plans and documentation
  120. 10Pre-construction plans and documentation
  121. 11Reporting of engaged agents, contractors and vessels
  122. 12Equipment and operation of vessels engaged in licensed activities
  123. 13Pre-construction monitoring and surveys
  124. 14Construction monitoring
  125. 15Post-construction
  126. 16Offshore decommissioning
  127. 17Amendments to approved plans, etc.
  128. Schedule 9: Marine Licence A2: Project A – Transmission Assets
  129. Part 1: Licensed activities
  130. 1Interpretation
  131. 2Details of licensed activities
  132. 3Maintenance of authorised project
  133. 4Duration
  134. Part 2: Licence conditions
  135. 1Design parameters
  136. 2Design parameters
  137. 3Navigational practice, safety and emergency response
  138. 4Aids to navigation
  139. 5Notifications and inspections
  140. 6Chemicals, drilling and debris
  141. 7Force majeure
  142. 8Pre-construction plans and documentation
  143. 9Pre-construction plans and documentation
  144. 10Pre-construction plans and documentation
  145. 11Reporting of engaged agents, contractors and vessels
  146. 12Equipment and operation of vessels engaged in licensed activities
  147. 13Pre-construction monitoring and surveys
  148. 14Construction monitoring
  149. 15Post-construction
  150. 16Offshore decommissioning
  151. 17Amendments to approved plans, etc.
  152. 18Restrictions in intertidal area and Humber Estuary Special Area of Conservation
  153. Schedule 10: Marine Licence B1: Project B – Generation Assets
  154. Part 1: Licensed activities
  155. 1Interpretation
  156. 2Details of licensed activities
  157. 3Maintenance of authorised project
  158. 4Duration
  159. Part 2: Licence conditions
  160. 1Design parameters
  161. 2Design parameters
  162. 3Navigational practice, safety and emergency response
  163. 4Aids to navigation
  164. 5Notifications and inspections
  165. 6Chemicals, drilling and debris
  166. 7Force majeure
  167. 8Pre-construction plans and documentation
  168. 9Pre-construction plans and documentation
  169. 10Pre-construction plans and documentation
  170. 11Reporting of engaged agents, contractors and vessels
  171. 12Equipment and operation of vessels engaged in licensed activities
  172. 13Pre-construction monitoring and surveys
  173. 14Construction monitoring
  174. 15Post-construction
  175. 16Offshore decommissioning
  176. 17Amendments to approved plans, etc.
  177. Schedule 11: Marine Licence B2: Project B – Transmission Assets
  178. Part 1: Licensed activities
  179. 1Interpretation
  180. 2Details of licensed activities
  181. 3Maintenance of authorised project
  182. 4Duration
  183. Part 2: Licence conditions
  184. 1Design parameters
  185. 2Design parameters
  186. 3Navigational practice, safety and emergency response
  187. 4Aids to navigation
  188. 5Notifications and inspections
  189. 6Chemicals, drilling and debris
  190. 7Force majeure
  191. 8Pre-construction plans and documentation
  192. 9Pre-construction plans and documentation
  193. 10Pre-construction plans and documentation
  194. 11Reporting of engaged agents, contractors and vessels
  195. 12Equipment and operation of vessels engaged in licensed activities
  196. 13Pre-construction monitoring and surveys
  197. 14Construction monitoring
  198. 15Post-construction
  199. 16Offshore decommissioning
  200. 17Amendments to approved plans, etc.
  201. 18Restrictions in intertidal area and Humber Estuary Special Area of Conservation
  202. Schedule 12: Protective provisions
  203. Part 1: Protection for Environment Agency and drainage authorities
  204. 1Paragraph 1
  205. 2Paragraph 2
  206. 3Paragraph 3
  207. 4Paragraph 4
  208. 5Paragraph 5
  209. 6Paragraph 6
  210. 7Paragraph 7
  211. 8Paragraph 8
  212. 9Paragraph 9
  213. 10Paragraph 10
  214. 11Paragraph 11
  215. Part 2: Protection for Network Rail Infrastructure Limited, etc.
  216. 1Paragraph 1
  217. 2Paragraph 2
  218. 3Paragraph 3
  219. 4Paragraph 4
  220. 5Paragraph 5
  221. 6Paragraph 6
  222. 7Paragraph 7
  223. 8Paragraph 8
  224. 9Paragraph 9
  225. 10Paragraph 10
  226. 11Paragraph 11
  227. 12Paragraph 12
  228. 13Paragraph 13
  229. 14Paragraph 14
  230. 15Paragraph 15
  231. 16Paragraph 16
  232. 17Paragraph 17
  233. 18Paragraph 18
  234. 19Paragraph 19
  235. 20Paragraph 20
  236. Part 3: Protection for operators of electronic communications code networks
  237. 1Paragraph 1
  238. 2Paragraph 2
  239. 3Paragraph 3
  240. 4Paragraph 4
  241. 5Paragraph 5
  242. Part 4: Protection for utility undertakers
  243. 1Paragraph 1
  244. 2Paragraph 2
  245. 3Paragraph 3
  246. 4Paragraph 4
  247. 5Paragraph 5
  248. 6Paragraph 6
  249. 7Paragraph 7
  250. 8Paragraph 8
  251. 9Paragraph 9
  252. 10Paragraph 10
  253. Part 5: Protection for Associated British Ports
  254. 1Paragraph 1
  255. 2Paragraph 2
  256. 3Paragraph 3
  257. 4Paragraph 4
  258. 5Paragraph 5
  259. 6Paragraph 6
  260. 7Paragraph 7
  261. 8Paragraph 8
  262. 9Paragraph 9
  263. 10Paragraph 10
  264. 11Paragraph 11
  265. 12Paragraph 12
  266. 13Paragraph 13
  267. Part 6: Protection for Anglian Water Services Limited
  268. 1Paragraph 1
  269. 2Paragraph 2
  270. 3Paragraph 3
  271. 4Paragraph 4
  272. 5Paragraph 5
  273. 6Paragraph 6
  274. 7Paragraph 7
  275. 8Paragraph 8
  276. 9Paragraph 9
  277. 10Paragraph 10
  278. 11Paragraph 11
  279. 12Paragraph 12
  280. 13Paragraph 13
  281. 14Paragraph 14
  282. 15Paragraph 15
  283. Part 7: Protection for Centrica plc
  284. 1Paragraph 1
  285. 2Paragraph 2
  286. 3Paragraph 3
  287. 4Paragraph 4
  288. 5Paragraph 5
  289. 6Paragraph 6
  290. 7Paragraph 7
  291. 8Paragraph 8
  292. 9Paragraph 9
  293. 10Paragraph 10
  294. Part 8: Protection for VPI Immingham LLP
  295. 1Paragraph 1
  296. 2Paragraph 2
  297. 3Paragraph 3
  298. 4Paragraph 4
  299. 5Paragraph 5
  300. 6Paragraph 6
  301. 7Paragraph 7
  302. Part 9: Protection for Phillips 66 Limited
  303. 1Paragraph 1
  304. 2Paragraph 2
  305. 3Paragraph 3
  306. 4Paragraph 4
  307. 5Paragraph 5
  308. 6Paragraph 6
  309. 7Paragraph 7
  310. Part 10: Protection for ConocoPhillips (U.K.) Limited
  311. 1Paragraph 1
  312. 2Paragraph 2
  313. 3Paragraph 3
  314. 4Paragraph 4
  315. 5Paragraph 5
  316. 6Paragraph 6
  317. 7Paragraph 7
  318. Part 11: Protection for C.GEN Killingholme Limited
  319. 1Paragraph 1
  320. 2Paragraph 2
  321. 3Paragraph 3
  322. 4Paragraph 4
  323. 5Paragraph 5
  324. 6Paragraph 6
  325. 7Paragraph 7
  326. 8Paragraph 8
  327. 9Paragraph 9
  328. 10Paragraph 10
  329. 11Paragraph 11
  330. 12Paragraph 12
  331. 13Paragraph 13
  332. 14Paragraph 14
  333. 15Paragraph 15
  334. 16Paragraph 16
  335. 17Paragraph 17
  336. 18Paragraph 18
  337. 19Paragraph 19
  338. 20Paragraph 20
  339. 21Paragraph 21
  340. 22Paragraph 22
  341. Part 12: Protection for Hornsea One companies
  342. 1Paragraph 1
  343. 2Paragraph 2
  344. 3Paragraph 3
  345. 4Paragraph 4
  346. 5Paragraph 5
  347. 6Paragraph 6
  348. 7Paragraph 7
  349. 8Paragraph 8
  350. 9Paragraph 9
  351. 10Paragraph 10
  352. 11Paragraph 11
  353. 12Paragraph 12
  354. 13Paragraph 13
  355. 14Paragraph 14
  356. 15Paragraph 15
  357. 16Paragraph 16
  358. 17Paragraph 17
  359. 18Paragraph 18
  360. Schedule 13: Documents to be certified
  361. 1Paragraph 1
  362. 2Paragraph 2
  363. 3Paragraph 3
  364. 4Paragraph 4
  365. 5Paragraph 5
  366. 6Paragraph 6
  367. 7Paragraph 7
  368. 8Paragraph 8
  369. 9Paragraph 9
  370. 10Paragraph 10
  371. 11Paragraph 11
  372. 12Paragraph 12
  373. 13Paragraph 13
  374. 14Paragraph 14
  375. Explanatory note