The Norfolk Boreas Offshore Wind Farm Order 2021 in England
S.I. 2021/1414 · Made 10 December 2021 · Extends to England and Wales
Infrastructure Planning
Made 10th December 2021
Coming into force - - 1st January 2022
The application was examined by the Examining Authority appointed by the Secretary of State pursuant to sections 61f3 and 65f4 of Part 6 of the 2008 Act and carried out in accordance with Chapter 4 of that Act and with the Infrastructure Planning (Examination Procedure) Rules 2010f5. The Examining Authority has submitted a report to the Secretary of State under section 74(2)f6 of the 2008 Act.
The Secretary of State has considered the report and recommendation of the Examining Authority, has taken into account the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f7 and, as a national policy statement has effect in relation to the proposed development, has had regard to the documents and matters referred to in section 104(2)f8 of the 2008 Act.
The Secretary of State, having decided the application, has determined to make an Order granting development consent for the development described in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.
The Secretary of State is satisfied that open space comprised within the Order land, when burdened with the new rights authorised for compulsory acquisition under the terms of this Order, will be no less advantageous than it was before such acquisition, to the persons in whom it is vested, other persons, if any, entitled to rights of common or other rights, and the public and that, accordingly, section 132(3)f9 of the 2008 Act applies.
The Secretary of State in exercise of the powers conferred by sections 114, 115, 120f10, 140 and 149A of the 2008 Act makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Section 37 was amended by Chapter 6 of Part 6 of, and Schedule 13 to, the Localism Act 2011 c. 20.
- f2
- f3
-
Section 61 was amended by section 128(2) and Schedule 13, paragraph 18 to the Localism Act 2011 c. 20 and by section 26 of the Infrastructure Act 2015 c. 7.
- f4
-
Section 65 was amended by Schedule 13 paragraph 22(2) and Schedule 25, paragraph 1 to the Localism Act 2011 c. 20 and by section 27(1) of the Infrastructure Act 2015 c. 7.
- f5
-
S.I. 2010/103, amended by S.I. 2012/635.
- f6
-
Section 74 was amended by sections 128(2) and 237 and by Schedule 13, paragraph 29 and Schedule 25, paragraph 1, to the Localism Act 2011 c. 20.
- f7
- f8
-
Section 104 was amended by section 58(5) of the Marine and Coastal Access Act 2009 (c. 23) and by section 128(2) and Schedule 13, paragraphs 1 and 49(1) to (6) of the Localism Act 2011 c. 20.
- f9
-
Section 132 was amended by section 24(3) of the Growth and Infrastructure Act 2013 c. 27.
- f10
-
Sections 114, 115 and 120 were amended by sections 128(2) and 140 and Schedule 13, paragraphs 1, 55(1), (2) and 60(1) and (3) of the Localism Act 2011 c. 20. Relevant amendments were made to section 115 by section 160(1) to (6) of the Housing and Planning Act 2016 c. 22.
Contents
- Part 1: Preliminary
- 1Citation and commencement
- 2Interpretation
- Part 2: Principal Powers
- 3Development consent etc. granted by the Order
- 4Limits of deviation
- 5Power to maintain authorised project
- 6Benefit of the Order
- 7Application and modification of legislative provisions
- 8Defence to proceedings in respect of statutory nuisance
- Part 3: Streets
- 9Street works
- 10Public rights of way
- 11Stopping up of streets
- 12Access to works
- 13Agreements with street authorities
- 14Application of the 1991 Act
- Part 4: Supplemental Powers
- 15Discharge of water and works to watercourses
- 16Authority to survey and investigate the land onshore
- 17Removal of human remains
- Part 5: Powers of Acquisition
- 18Compulsory acquisition of land
- 19Time limit for exercise of authority to acquire land compulsorily
- 20Compulsory acquisition of rights and the imposition of restrictive covenants
- 21Private rights
- 22Application of the 1981 Act
- 23Application of Part 1 of the 1965 Act
- 24Acquisition of subsoil or airspace only
- 25Rights under or over streets
- 26Temporary use of land for carrying out the authorised project
- 27Temporary use of land for maintaining authorised project
- 28Extinguishment of private rights and restrictive covenants relating to apparatus removed from land subject to temporary possession
- 29Statutory undertakers
- 30Recovery of costs of new connections
- Part 6: Operations
- 31Operation of generating station
- 32Deemed marine licences under the 2009 Act
- Part 7: Miscellaneous and General
- 33Application of landlord and tenant law
- 34Operational land for purposes of the 1990 Act
- 35Felling or lopping of trees and removal of hedgerows
- 36Trees subject to tree preservation orders
- 37Certification of plans etc
- 38Arbitration
- 39Procedure in relation to certain approvals etc
- 40Abatement of works abandoned or decayed
- 41Saving provisions for Trinity House
- 42Crown rights
- 43Service of Notices
- 44Protective provisions
- 45Compensation to protect the coherence of the national site network
- Signature
- Schedule 1: Authorised Project
- 1Authorised Development
- 1Paragraph 1
- Part 2: Ancillary Works
- 1Paragraph 1
- Part 3: Requirements
- 1Time limits
- 2Detailed offshore design parameters
- 3Detailed offshore design parameters
- 4Detailed offshore design parameters
- 5Detailed offshore design parameters
- 6Detailed offshore design parameters
- 7Detailed offshore design parameters
- 8Detailed offshore design parameters
- 9Detailed offshore design parameters
- 10Detailed offshore design parameters
- 11Detailed offshore design parameters
- 12Aviation safety
- 13Ministry of Defence surveillance operations
- 14Offshore decommissioning
- 15Scenarios, stages, and phases of authorised development onshore
- 16Detailed design parameters onshore
- 17Landfall method statement
- 18Provision of landscaping
- 19Implementation and maintenance of landscaping
- 20Code of construction practice
- 21Traffic
- 22Highway accesses
- 23Archaeological written scheme of investigation
- 24Ecological management plan
- 25Watercourse crossings
- 26Construction hours
- 27Control of noise during operational phase and during maintenance
- 28European protected species onshore
- 29Onshore decommissioning
- 30Requirement for written approval
- 31Amendments to approved details
- 32Operational drainage plan
- 33Skills and employment strategy
- 34Cromer Primary Surveillance Radar
- 35Reuse of temporary works in the event of scenario 1
- 36Base port(s) travel plans
- Schedule 2: Streets subject to Street Works
- 1Scenario 1
- 2Scenario 2
- Schedule 3: Public Rights of Way to be temporarily stopped up
- 1Scenario 1
- 2Scenario 2
- Schedule 4: Streets to be stopped up
- 1Streets to be temporarily stopped up (Scenario 1)
- 2Streets to be temporarily stopped up (Scenario 2)
- 3Permanent stopping up of private means of access for which a substitute is to be provided – Scenario 1
- Schedule 5: Access to Works
- 1Scenario 1
- 2Scenario 2
- Schedule 6: Land in which only New Rights etc., may be acquired
- 1Scenario 1
- 2Scenario 2
- Schedule 7: Modification of compensation and compulsory purchase enactments for creation of new rights
- 1Compensation Enactments
- 2Compensation Enactments
- 3Compensation Enactments
- 4Application of the 1965 Act
- 5Application of the 1965 Act
- 6Application of the 1965 Act
- 7Application of the 1965 Act
- 8Application of the 1965 Act
- 9Application of the 1965 Act
- 10Application of the 1965 Act
- Schedule 8: Land of which temporary possession may be taken
- 1Scenario 1
- 2Scenario 2
- Schedule 9: Deemed Licence under the 2009 Act – Generation Assets (Licence 1 – Phase 1)
- Part 1: Interpretation
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Part 2: Licensed Marine Activities – General
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Part 3: Details of Licensed Marine Activities
- 1Paragraph 1
- 2Paragraph 2
- Part 4: Conditions
- 1Design parameters
- 2Design parameters
- 3Design parameters
- 4Design parameters
- 5Design parameters
- 6Design parameters
- 7Design parameters
- 8Phasing of the authorised scheme and scenarios
- 9Notifications and inspections
- 10Aids to navigation
- 11Colouring of structures
- 12Chemicals, drilling and debris
- 13Force majeure
- 14Pre-construction plans and documentation
- 15Pre-construction plans and documentation
- 16Post-construction plans and documents
- 17Reporting of engaged agents, contractors and vessels
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Reporting of impact pile driving
- 22Reporting of scour and cable protection
- 23Completion of construction
- Schedule 10: Deemed Licence under the 2009 Act – Generation Assets (Licence 2 – Phase 2)
- Part 1: Interpretation
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Part 2: Licensed Marine Activities – General
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Part 3: Details of Licensed Marine Activities
- 1Paragraph 1
- 2Paragraph 2
- Part 4: Conditions
- 1Design parameters
- 2Design parameters
- 3Design parameters
- 4Design parameters
- 5Design parameters
- 6Design parameters
- 7Design parameters
- 8Phasing of the authorised scheme
- 9Notifications and inspections
- 10Aids to navigation
- 11Colouring of structures
- 12Chemicals, drilling and debris
- 13Force majeure
- 14Pre-construction plans and documentation
- 15Pre-construction plans and documentation
- 16Post-construction plans and documents
- 17Reporting of engaged agents, contractors and vessels
- 18Pre-construction monitoring and surveys
- 19Construction monitoring
- 20Post construction
- 21Reporting of impact pile driving
- 22Reporting of scour and cable protection
- 23Completion of construction
- Schedule 11: Deemed Licence under the 2009 Act – Transmission Assets (Licence 1 – Phase 1)
- Part 1: Interpretation
- 1Paragraph 1
- Part 2: Licensed Marine Activities – General
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Part 3: Details of Licensed Marine Activities
- 1Paragraph 1
- 2Paragraph 2
- Part 4: Conditions
- 1Design parameters
- 2Design parameters
- 3Phasing of the authorised scheme and scenarios
- 4Notifications and inspections
- 5Aids to navigation
- 6Colouring of structures
- 7Chemicals, drilling and debris
- 8Force majeure
- 9Pre-construction plans and documentation
- 10Pre-construction plans and documentation
- 11Post-construction plans and documents
- 12Reporting of engaged agents, contractors and vessels
- 13Pre-construction monitoring and surveys
- 14Construction monitoring
- 15Post construction
- 16Reporting of impact pile driving
- 17Reporting of scour and cable protection
- 18Coordination with Norfolk Vanguard Offshore Wind Farm
- 19Restriction on cable installation construction works
- Schedule 12: Deemed Licence under the 2009 Act – Transmission Assets (Licence 2 – Phase 2)
- Part 1: Interpretation
- 1Paragraph 1
- Part 2: Licensed Marine Activities – General
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Part 3: Details of Licensed Marine Activities
- 1Paragraph 1
- 2Paragraph 2
- Part 4: Conditions
- 1Design parameters
- 2Design parameters
- 3Phasing of the authorised scheme
- 4Notifications and inspections
- 5Aids to navigation
- 6Colouring of structures
- 7Chemicals, drilling and debris
- 8Force majeure
- 9Pre-construction plans and documentation
- 10Pre-construction plans and documentation
- 11Post-construction plans and documents
- 12Reporting of engaged agents, contractors and vessels
- 13Pre-construction monitoring and surveys
- 14Construction monitoring
- 15Post construction
- 16Reporting of impact pile driving
- 17Reporting of scour and cable protection
- 18Coordination with Norfolk Vanguard Offshore Wind Farm
- 19Restriction on cable installation construction works
- Schedule 13: Deemed Licence under the 2009 Act –Project Interconnector assets (Scenario 1)
- Part 1: Interpretation
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Part 2: Licensed Marine Activities – General
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Part 3: Details of Licensed Marine Activities
- 1Paragraph 1
- 2Paragraph 2
- Part 4: Conditions
- 1Effect of this licence
- 2Design parameters
- 3Notifications and inspections
- 4Aids to navigation
- 5Chemicals, drilling and debris
- 6Force majeure
- 7Pre-construction plans and documentation
- 8Pre-construction plans and documentation
- 9Post-construction plans and documents
- 10Reporting of engaged agents, contractors and vessels
- 11Pre-construction monitoring and surveys
- 12Construction monitoring
- 13Post construction
- 14Reporting of cable protection
- 15Coordination with Norfolk Vanguard Offshore Wind Farm
- Schedule 14: Hedgerows
- 1Scenario 1 - Removal of Important Hedgerows
- 2Scenario 1 - Removal of Hedgerows
- 3Scenario 2 - Removal of Important Hedgerows
- 4Scenario 2 - Removal of Potentially Important Hedgerows
- 5Scenario 2 - Removal of Hedgerows
- Schedule 15: Arbitration Rules
- 1Primary objective
- 2Time periods
- 3Timetable
- 4Procedure
- 5Arbitrator’s powers
- 6Costs
- 7Confidentiality
- Schedule 16: Procedure for discharge of Requirements
- 1Applications made under requirement
- 2Further information
- 3Appeals
- 4Interpretation of this Schedule
- Schedule 17: Protective Provisions
- Part 1: Protection of electricity, gas, water and sewerage undertakers
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- Part 2: For the Protection of National Grid
- 12Application
- 13Interpretation
- 14Interpretation
- 15Apparatus of Undertakers in stopped up streets
- 16Acquisition of land
- 17Removal of apparatus
- 18Facilities and rights for alternative apparatus
- 19Retained apparatus: protection Gas Undertakers
- 20Retained apparatus: protection Electricity Undertakers
- 21Expenses
- 22Compensation
- 23Enactments and agreements
- 24Co-operation
- 25Access
- 26Arbitration
- 27Notices
- Part 3: For the Protection of Cadent Gas Limited as Gas Undertaker
- 28Application
- 29Interpretation
- 30On Street Apparatus
- 31Apparatus of Undertakers in stopped up streets
- 32Acquisition of land
- 33Removal of apparatus
- 34Facilities and rights for alternative apparatus
- 35Retained apparatus: protection Gas Undertakers
- 36Expenses
- 37Compensation
- 38Enactments and agreements
- 39Co-operation
- 40Access
- 41Arbitration
- 42Notices
- Part 4: Protection for Operators of Electronic Communications Code Networks
- 43Paragraph 43
- 44Paragraph 44
- 45Paragraph 45
- 46Paragraph 46
- 47Paragraph 47
- Part 5: Protection of Network Rail Infrastructure Limited
- 48Paragraph 48
- 49Paragraph 49
- 50Paragraph 50
- 51Paragraph 51
- 52Paragraph 52
- 53Paragraph 53
- 54Paragraph 54
- 55Paragraph 55
- 56Paragraph 56
- 57Paragraph 57
- 58Paragraph 58
- 59Paragraph 59
- 60Paragraph 60
- 61Paragraph 61
- 62Paragraph 62
- 63Paragraph 63
- 64Paragraph 64
- 65Paragraph 65
- 66Paragraph 66
- 67Paragraph 67
- 68Paragraph 68
- 69Paragraph 69
- Part 6: For the Protection of Anglian Water Services Limited
- 70Paragraph 70
- Part 7: For the protection of the Environment Agency and drainage authorities
- 71Paragraph 71
- 72Paragraph 72
- 73Paragraph 73
- 74Paragraph 74
- 75Paragraph 75
- 76Paragraph 76
- 77Paragraph 77
- 78Paragraph 78
- 79Paragraph 79
- 80Paragraph 80
- 81Paragraph 81
- Part 8: For the protection of Ørsted Hornsea Project Three (UK) Ltd
- 82Paragraph 82
- 83Paragraph 83
- 84Paragraph 84
- 85Paragraph 85
- 86Paragraph 86
- 87Paragraph 87
- 88Paragraph 88
- 89Paragraph 89
- 90Paragraph 90
- 91Paragraph 91
- 92Paragraph 92
- 93Paragraph 93
- 94Paragraph 94
- 95Paragraph 95
- 96Paragraph 96
- 97Paragraph 97
- Part 9: For the protection of Norfolk Vanguard Limited
- 98Application
- 99Interpretation
- 100Acquisition of land
- 101Removal of apparatus
- 102Facilities and rights for alternative apparatus
- 103Retained apparatus: protection: electricity undertakers
- 104Expenses
- 105Compensation
- 106Enactments and agreements
- 107Co-operation
- 108Access
- 109Arbitration
- Schedule 18: Documents to be Certified
- 1Documents forming the environmental statement to be certified
- 2Other documents to be certified
- Schedule 19: Compensation to protect the coherence of the national site network
- Part 1: Flamborough and Filey Coast Special Protection Area: Delivery of measures to compensate for kittiwake loss
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- Part 2: Alde-Ore Estuary Special Protection Area: Delivery of measures to compensate for the loss of lesser black-backed gull
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- 22Paragraph 22
- Part 3: Haisborough, Hammond and Winterton Special Area of Conservation: Delivery of measures to compensate for cable installation and protection
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- 26Paragraph 26
- 27Paragraph 27
- 28Paragraph 28
- 29Paragraph 29
- 30Paragraph 30
- 31Paragraph 31
- 32Paragraph 32
- 33Paragraph 33
- 34Paragraph 34
- 35Paragraph 35
- 36Paragraph 36
- 37Paragraph 37
- 38Paragraph 38
- 39Paragraph 39
- 40Paragraph 40
- Explanatory note