The North Killingholme (Generating Station) Order 2014
S.I. 2014/2434 · Made 11 September 2014 · Extends to England, Wales and Scotland
Infrastructure Planning
Made 11th September 2014
Coming into force 2nd October 2014
The undertaker has applied to the Secretary of State for an order granting development consent in accordance with the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009f1;
The Examining authority, having considered the application with the documents that accompanied it, and the representations made and not withdrawn, has, in accordance with section 74 of the 2008 Act made a report and recommendation to the Secretary of State;
The Secretary of State, having considered the report and recommendation of the Examining authority, and decided the application, has determined to make an Order giving effect to the proposals comprised in the application with modifications which in his opinion do not make substantial change to the proposals;
The Secretary of State has decided to grant development consent and, under sections 114, 115, 120 and 149A of the 2008 Act, to make the following Order—
Annotations to the whole text
Footnotes
- f1
-
S.I. 2009/2264 as amended by the Localism Act 2011 (Infrastructure Planning) (Consequential Amendments) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Prescribed Consultees and Interested Parties etc) (Amendment) Regulations 2013 (S.I. 2013/522). There are other amendments to the Regulations which are not relevant to this Order.
- f2
-
2008 c.29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of, and Schedule 13 to, the Localism Act 2011 (c.20), and by sections 22 to 27 of the Growth and Infrastructure Act 2013 (c.27), see S.I. 2013/1124 for transitional provisions. Section 149A was inserted by section 112(1) of, and paragraph 4 of Part 1 of Schedule 8 to, the Marine and Coastal Access Act 2009 (c.33).
- f3
-
S.I. 2010/103, as amended by S.I. 2012/635.
Contents
- 1Citation and commencement
- 2Interpretation
- 3Development consent etc. granted by the Order
- 4Maintenance, decommissioning and demolition of authorised development
- 5Operation of generating station
- 6Benefit of the Order
- 7Guarantees in respect of payment of compensation
- 8Defence to proceedings in respect of statutory nuisance
- 9Street works
- 10Temporary stopping up of streets
- 11Access to works
- 12Agreements with street authority
- 13Crown rights
- 14Discharge of water
- 15Authority to survey and investigate the land
- 16Compulsory acquisition of land
- 17Power to override easements and other rights
- 18Private rights of way
- 19Time limit for exercise of authority to acquire land compulsorily
- 20Compulsory acquisition of rights
- 21Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 22Acquisition of subsoil only
- 23Acquisition of part of certain properties
- 24Rights under or over streets
- 25Temporary use of land for carrying out the authorised development
- 26Temporary use of land for maintaining authorised development
- 27Statutory undertakers
- 28Railway undertakings
- 29Application of landlord and tenant law
- 30Operational land for purposes of the 1990 Act
- 31Felling or lopping of trees
- 32Protective work to buildings
- 33Procedure in relation to certain approvals etc.
- 34Certification of plans, etc.
- 35Arbitration
- 36Deemed marine licence
- 37Protection of interests
- Signature
- Schedule 1: Authorised development
- 1Authorised development
- 2Building heights
- Part 3: Requirements
- 1Interpretation
- 2Time limits etc.
- 3Development masterplan
- 4Detailed design
- 5Paragraph 5
- 6Site road
- 7Provision of landscaping
- 8Implementation and maintenance of landscaping
- 9Highway works
- 10Fencing and other means of site perimeter enclosure
- 11Construction surface water drainage
- 12Operational surface and foul water drainage
- 13Contamination and groundwater
- 14Archaeology
- 15CEMP
- 16Storage of liquids on site
- 17Control of noise during construction
- 18Paragraph 18
- 19Paragraph 19
- 20Control of noise during operation
- 21Paragraph 21
- 22Paragraph 22
- 23Paragraph 23
- 24Construction hours
- 25Piling
- 26Construction of Work Nos. 6a and 6b
- 27Combined heat and power
- 28Paragraph 28
- 29Control of dust emissions during operation
- 30Construction and security lighting scheme
- 31Permanent lighting scheme
- 32Bat mitigation strategy
- 33Water vole mitigation strategy
- 34Other ecological matters
- 35Paragraph 35
- 36CCS
- 37Paragraph 37
- 38Paragraph 38
- 39Fire water
- 40Drainage pond
- 41Site waste management plan
- 42Biomass fuel sustainability
- 43Decommissioning
- 44Requirements for written approval, etc.
- 45Amendments to approved details
- 46Flood warning and evacuation plan
- 47Aerodrome safeguarding
- 48Train speed at North Killingholme Haven Pits
- 49Acoustic hoarding
- 50Visual attenuation of train movements
- 51Control of construction noise at North Killingholme Haven Pits
- 52Changes approved by the relevant planning authority
- 53Work No. 1
- Schedule 2Streets subject to street works
- Schedule 3Street to be temporarily stopped up
- Schedule 4Access to works
- Schedule 5Land of which temporary possession may be taken
- Schedule 6: Procedure for discharge of requirements
- 1Interpretation of Schedule
- 2Applications made under requirement
- 3Further information
- 4Fees
- 5Appeals
- Schedule 7: Deemed marine licence
- Part 1: Introductory
- 1Interpretation
- 2Addresses
- Part 2: Licensed activities
- 3Paragraph 3
- Part 3: Conditions
- 4General conditions
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Cooling water intake conditions
- 20Piling conditions
- 21Paragraph 21
- 22Paragraph 22
- 23Paragraph 23
- 24Detailed design
- Schedule 8: Protective provisions
- Part 1: For the protection of Anglian Water
- 1Application
- 2Interpretation
- 3Apparatus within standard protection strips
- 4Alteration, extension, removal or relocation of apparatus
- 5Contingency arrangements
- 6Creation of rights for Anglian Water
- 7Alternative means of access to apparatus
- 8Unmapped sewers, lateral drains or other apparatus
- 9Damage or interruption caused by construction
- 10Paragraph 10
- Part 2: For the protection of the Environment Agency
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- Part 3: For the protection of Network Rail
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- Part 4: For the protection of National Grid
- 1Application
- 2Interpretation
- 3Paragraph 3
- 4Apparatus of protected persons in stopped up streets
- 5Protective works to buildings
- 6Acquisition of land
- 7Removal of apparatus
- 8Facilities and rights for alternative apparatus
- 9Retained apparatus: protection: electricity undertakers
- 10Retained apparatus: protection: gas undertakers
- 11Expenses
- 12Indemnity
- 13Ground subsidence monitoring scheme in respect of protected person’s apparatus
- 14Enactments and agreements
- 15Co-operation
- 16Access
- 17Arbitration
- Part 5: For the protection of Centrica plc
- 1Application
- 2Interpretation
- 3Creation of rights for Centrica
- 4Apparatus
- 5Removal of apparatus
- 6Facilities and rights for alternative apparatus
- 7Costs
- 8Access to power station
- 9Requirement for agreement
- Explanatory note