| Mallard Pass Solar Farm (Correction) 2024 |
S.I. 2024/1088 |
31 Oct 2024 |
— |
| HyNet Carbon Dioxide Pipeline (Correction) 2024 |
S.I. 2024/1031 |
15 Oct 2024 |
— |
| M3 Junction 9 Development Consent (Correction) 2024 |
S.I. 2024/1020 |
9 Oct 2024 |
Section 119, Schedule 4 paragraph 1 |
| Associated British Ports (Immingham Eastern Ro-Ro Terminal) Development Consent 2024 |
S.I. 2024/1014 |
4 Oct 2024 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 24, Schedule 5 paragraph 26, Schedule 5 paragraph 30A, Schedule 5 paragraph 30B, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Thurrock Flexible Generation Plant Consent 2024 |
S.I. 2024/955 |
12 Sep 2024 |
Schedule 6 paragraph 2 |
| National Grid (Bramford to Twinstead Reinforcement) 2024 |
S.I. 2024/958 |
12 Sep 2024 |
— |
| Cottam Solar Project 2024 |
S.I. 2024/943 |
5 Sep 2024 |
— |
| Hornsea Four Offshore Wind Farm 2024 |
S.I. 2024/800 |
17 Jul 2024 |
Schedule 6 paragraph 2 |
| Awel y Môr Offshore Wind Farm (Correction) 2024 |
S.I. 2024/799 |
16 Jul 2024 |
Section 119, Schedule 4 paragraph 1 |
| Mallard Pass Solar Farm 2024 |
S.I. 2024/796 |
12 Jul 2024 |
— |
| Sunnica Energy Farm 2024 |
S.I. 2024/802 |
12 Jul 2024 |
— |
| Gate Burton Energy Park 2024 |
S.I. 2024/807 |
12 Jul 2024 |
— |
| National Grid (Yorkshire Green Energy Enablement Project) (Corrections) 2024 |
S.I. 2024/811 |
11 Jun 2024 |
— |
| M3 Junction 9 Development Consent 2024 |
S.I. 2024/752 |
16 May 2024 |
— |
| Keuper Underground Gas Storage Facility 2024 |
S.I. 2024/674 |
15 May 2024 |
— |
| Hornsea Three Offshore Wind Farm 2024 |
S.I. 2024/627 |
9 May 2024 |
Schedule 6 paragraph 2 |
| Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm 2024 |
S.I. 2024/564 |
17 Apr 2024 |
— |
| Planning Act 2008 (Commencement No. 8) and Levelling-up and Regeneration Act 2023 (Commencement No. 4) 2024 |
S.I. 2024/452 |
2 Apr 2024 |
Section 241 |
| Immingham Open Cycle Gas Turbine 2024 |
S.I. 2024/446 |
27 Mar 2024 |
Schedule 6 paragraph 2 |
| HyNet Carbon Dioxide Pipeline 2024 |
S.I. 2024/436 |
20 Mar 2024 |
Section 114, Section 115, Section 120, Section 122, Section 123, Section 131, Section 132 |
| National Grid (Yorkshire Green Energy Enablement Project) Development Consent 2024 |
S.I. 2024/393 |
14 Mar 2024 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123 |
| A66 Northern Trans-Pennine Development Consent 2024 |
S.I. 2024/360 |
7 Mar 2024 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123, Section 131, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 4, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Infrastructure Planning (Examination Procedure) 2024 |
S.I. 2024/317 |
6 Mar 2024 |
Section 88, Section 90, Section 97, Section 232 |
| Infrastructure Planning (Miscellaneous Provisions) 2024 |
S.I. 2024/332 |
6 Mar 2024 |
Section 42, Section 51, Section 56, Section 102, Section 232 |
| Infrastructure Planning (Fees) 2024 |
S.I. 2024/333 |
6 Mar 2024 |
Section 4, Section 54A |
| Medworth Energy from Waste Combined Heat and Power Facility 2024 |
S.I. 2024/230 |
20 Feb 2024 |
— |
| Net Zero Teesside 2024 |
S.I. 2024/174 |
16 Feb 2024 |
— |
| M25 Junction 28 Development Consent (Correction) 2024 |
S.I. 2024/129 |
6 Feb 2024 |
Section 119, Schedule 4 paragraph 1 |
| A57 Link Roads Development Consent (Correction) 2024 |
S.I. 2024/116 |
1 Feb 2024 |
— |
| Glyn Rhonwy Pumped Storage Generating Station 2024 |
W.S.I. 2024/112 |
31 Jan 2024 |
Schedule 6 paragraph 2 |
| Hornsea Four Offshore Wind Farm (Correction) 2024 |
S.I. 2024/117 |
30 Jan 2024 |
— |
| Drax Power Station Bioenergy with Carbon Capture and Storage Extension 2024 |
S.I. 2024/70 |
16 Jan 2024 |
Section 114, Section 115, Section 120, Section 122, Section 123 |
| A12 Chelmsford to A120 Widening Development Consent 2024 |
S.I. 2024/60 |
12 Jan 2024 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Norfolk Vanguard Offshore Wind Farm 2023 |
S.I. 2023/1390 |
13 Dec 2023 |
Schedule 6 paragraph 2 |
| Slough Multifuel Extension 2023 |
S.I. 2023/1278 |
28 Nov 2023 |
Section 114, Section 115, Section 120, Section 140 |
| Longfield Solar Farm (Correction) 2023 |
S.I. 2023/1241 |
20 Nov 2023 |
— |
| West Midlands Rail Freight Interchange 2023 |
S.I. 2023/1132 |
25 Oct 2023 |
Schedule 6 paragraph 2 |
| A47 North Tuddenham to Easton Development Consent (Correction) 2023 |
S.I. 2023/1076 |
10 Oct 2023 |
— |
| Manston Airport Development Consent 2023 |
S.I. 2023/1038 |
22 Sep 2023 |
Schedule 6 paragraph 2 |
| Awel y Môr Offshore Wind Farm 2023 |
S.I. 2023/1033 |
19 Sep 2023 |
— |
| A38 Derby Junctions Development Consent 2023 |
S.I. 2023/923 |
17 Aug 2023 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| A47 Blofield to North Burlingham Development Consent (Correction) 2023 |
S.I. 2023/885 |
28 Jul 2023 |
— |
| A47/A11 Thickthorn Junction Development Consent (Correction) 2023 |
S.I. 2023/886 |
28 Jul 2023 |
— |
| Hornsea Four Offshore Wind Farm 2023 |
S.I. 2023/800 |
12 Jul 2023 |
— |
| Boston Alternative Energy Facility 2023 |
S.I. 2023/778 |
5 Jul 2023 |
— |
| Longfield Solar Farm 2023 |
S.I. 2023/734 |
26 Jun 2023 |
— |
| A47 Wansford to Sutton (Corrections) 2023 |
S.I. 2023/667 |
16 Jun 2023 |
— |
| Little Crow Solar Park 2023 |
S.I. 2023/660 |
14 Jun 2023 |
— |
| Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) (Correction) 2023 |
S.I. 2023/442 |
18 Apr 2023 |
Section 119, Schedule 4 paragraph 1 |
| Hornsea Three Offshore Wind Farm 2023 |
S.I. 2023/459 |
17 Apr 2023 |
Schedule 6 paragraph 2 |
| Northampton Gateway Rail Freight Interchange 2023 |
S.I. 2023/418 |
6 Apr 2023 |
Schedule 6 paragraph 2 |
| Little Crow Solar Park (Correction) 2023 |
S.I. 2023/311 |
9 Mar 2023 |
Section 119, Schedule 4 paragraph 1 |
| Thurrock Flexible Generation Plant Consent 2023 |
S.I. 2023/289 |
7 Mar 2023 |
Schedule 6 paragraph 2 |
| Riverside Energy Park 2023 |
S.I. 2023/165 |
16 Feb 2023 |
Schedule 6 paragraph 2 |
| Immingham Open Cycle Gas Turbine 2023 |
S.I. 2023/119 |
31 Jan 2023 |
— |
| East Northamptonshire Resource Management Facility 2023 |
S.I. 2023/110 |
23 Jan 2023 |
Section 114, Section 115, Section 120 |
| M25 Junction 10/A3 Wisley Interchange Development Consent (Correction) 2023 |
S.I. 2023/46 |
18 Jan 2023 |
— |
| A428 Black Cat to Caxton Gibbet (Correction) 2023 |
S.I. 2023/40 |
16 Jan 2023 |
— |
| East Anglia ONE North Offshore Wind Farm (Correction) 2022 |
S.I. 2022/1398 |
21 Dec 2022 |
— |
| East Anglia TWO Offshore Wind Farm (Correction) 2022 |
S.I. 2022/1399 |
21 Dec 2022 |
— |
| Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) 2022 |
S.I. 2022/1396 |
7 Dec 2022 |
Section 114, Section 115, Section 120, Section 149A |
| Thames Water Utilities Limited (Thames Tideway Tunnel) 2022 |
S.I. 2022/1242 |
23 Nov 2022 |
Schedule 6 paragraph 2 |
| East Anglia THREE Offshore Wind Farm 2022 |
S.I. 2022/1195 |
16 Nov 2022 |
Schedule 6 paragraph 2 |
| A57 Link Roads Development Consent 2022 |
S.I. 2022/1206 |
16 Nov 2022 |
— |
| A417 Missing Link Development Consent 2022 |
S.I. 2022/1248 |
16 Nov 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 4, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Portishead Branch Line (MetroWest Phase 1) 2022 |
S.I. 2022/1194 |
14 Nov 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 20, Schedule 5 paragraph 23, Schedule 5 paragraph 24, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 34, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| A47/A11 Thickthorn Junction Development Consent 2022 |
S.I. 2022/1070 |
14 Oct 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| East Anglia THREE Offshore Wind Farm 2022 |
S.I. 2022/1015 |
30 Sep 2022 |
Schedule 6 paragraph 2 |
| Norfolk Vanguard Offshore Wind Farm 2022 |
S.I. 2022/1004 |
28 Sep 2022 |
Schedule 6 paragraph 2 |
| Norfolk Boreas Offshore Wind Farm 2022 |
S.I. 2022/968 |
20 Sep 2022 |
Schedule 6 paragraph 2 |
| Norfolk Vanguard Offshore Wind Farm (Corrections) 2022 |
S.I. 2022/944 |
6 Sep 2022 |
— |
| York Potash Harbour Facilities 2022 |
S.I. 2022/919 |
25 Aug 2022 |
Schedule 6 paragraph 2 |
| Manston Airport Development Consent 2022 |
S.I. 2022/922 |
18 Aug 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 4, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 17, Schedule 5 paragraph 20, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| A428 Black Cat to Caxton Gibbet Development Consent 2022 |
S.I. 2022/934 |
18 Aug 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| A47 North Tuddenham to Easton Development Consent 2022 |
S.I. 2022/911 |
12 Aug 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Norfolk Boreas Offshore Wind Farm (Corrections) 2022 |
S.I. 2022/901 |
11 Aug 2022 |
— |
| Sizewell C (Nuclear Generating Station) 2022 |
S.I. 2022/853 |
20 Jul 2022 |
— |
| Able Marine Energy Park Development Consent 2022 |
S.I. 2022/881 |
16 Jul 2022 |
Schedule 6 paragraph 3 |
| A47 Blofield to North Burlingham Development Consent 2022 |
S.I. 2022/738 |
22 Jun 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Dogger Bank Creyke Beck Offshore Wind Farm 2022 |
S.I. 2022/681 |
17 Jun 2022 |
Schedule 6 paragraph 2 |
| M25 Junction 28 Development Consent 2022 |
S.I. 2022/573 |
16 May 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| M25 Junction 10/A3 Wisley Interchange Development Consent 2022 |
S.I. 2022/549 |
12 May 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| M54 to M6 Link Road Development Consent 2022 |
S.I. 2022/475 |
21 Apr 2022 |
Section 114, Section 115, Section 117, Section 120, Section 122, Section 123, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Little Crow Solar Park 2022 |
S.I. 2022/436 |
5 Apr 2022 |
Section 114, Section 115, Section 120 |
| South Humber Bank Energy Centre (Correction) 2022 |
S.I. 2022/421 |
4 Apr 2022 |
— |
| East Anglia ONE North Offshore Wind Farm 2022 |
S.I. 2022/432 |
31 Mar 2022 |
— |
| East Anglia TWO Offshore Wind Farm 2022 |
S.I. 2022/433 |
31 Mar 2022 |
— |
| Thurrock Flexible Generation Plant Development Consent 2022 |
S.I. 2022/157 |
16 Feb 2022 |
Section 114, Section 115, Section 120, Schedule 5 |
| Norfolk Vanguard Offshore Wind Farm 2022 |
S.I. 2022/138 |
11 Feb 2022 |
— |
| Hinkley Point C (Nuclear Generating Station) 2021 |
S.I. 2021/1474 |
16 Dec 2021 |
— |
| Norfolk Boreas Offshore Wind Farm 2021 |
S.I. 2021/1414 |
10 Dec 2021 |
— |
| Glyn Rhonwy Pumped Storage Generating Station 2021 |
W.S.I. 2021/1284 |
17 Nov 2021 |
Schedule 6 paragraph 2 |
| South Humber Bank Energy Centre 2021 |
S.I. 2021/1259 |
10 Nov 2021 |
— |
| East Anglia ONE Offshore Wind Farm 2021 |
S.I. 2021/1086 |
24 Sep 2021 |
Schedule 6 paragraph 2 |
| North Killingholme (Generating Station) 2021 |
S.I. 2021/1055 |
16 Sep 2021 |
— |
| Infrastructure Planning (Prescribed Consultees and Interested Parties etc.) 2021 |
S.I. 2021/978 |
2 Sep 2021 |
Section 42, Section 56, Section 88, Section 114, Section 123, Schedule 6 paragraph 4 |
| Cleve Hill Solar Park (Correction) 2021 |
S.I. 2021/934 |
10 Aug 2021 |
— |
| Great Yarmouth Third River Crossing Development Consent (Correction) 2021 |
S.I. 2021/692 |
9 Jun 2021 |
— |
| Hornsea Three Offshore Wind Farm (Correction) 2021 |
S.I. 2021/599 |
20 May 2021 |
— |
| A303 Sparkford to Ilchester Dualling Development Consent (Correction) 2021 |
S.I. 2021/607 |
20 May 2021 |
— |