OpenLegislation

Paragraph 4 I1I2

England and Wales

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

(1)

Outside Greater London there is a parking contravention in relation to a vehicle if it is stationary in circumstances in which any of the offences listed below is committed.

(2)

The offences are—

(a)

an offence under section 64(3) of the Local Government (Miscellaneous Provisions) Act 1976 (c. 57) of causing a vehicle to stop on part of a road appointed, or deemed to have been appointed, as a hackney carriage stand;

(b)

an offence under section 5, 11, 16(1) or 16C of the Road Traffic Regulation Act 1984 (c. 27) (contravention of certain traffic orders) of contravening a prohibition or restriction on waiting, or loading or unloading, of vehicles;

F1(ba)

an offence committed in England under section 25(5) of the Road Traffic Regulation Act 1984 of contravening paragraph 1 or 3 of Part 5 of Schedule 14 to the Traffic Signs Regulations and General Directions 2016 (S.I. 2016/362);

(c)

an offence F2committed in Wales under section 25(5) of the Road Traffic Regulation Act 1984 of contravening regulation 18 or 20 of the Zebra, Pelican and Puffin Pedestrian Crossings Regulations and General Directions 1997 (S.I. 1997/2400) (prohibition on stopping vehicles on or near pedestrian crossings);

(d)

an offence under section 35A(1), 47(1) or 53(5) or (6) of the Road Traffic Regulation Act 1984 (offences in connection with parking places);

(e)

an offence under section 61(5) of the Road Traffic Regulation Act 1984 (parking in loading areas);

F3(ea)

an offence under section 30(1) of the Exeter City Council Act 1987 (c. xi) (prohibition of parking vehicles on verges, central reservations and footways).

(f)

an offence under section 6(6) of the Essex Act 1987 (c. xx) of leaving a vehicle on any land in contravention of a prohibition under that section (prohibitions relating to verges and certain other land adjoining or accessible from highway);

(g)

an offence under section 19 of the Road Traffic Act 1988 (c. 52) (parking of HGVs on verges, central reservations or footways);

(h)

an offence under section 21 of the Road Traffic Act 1988 (offences relating to cycle tracks) of parking a vehicle wholly or partly on a cycle track;

F4(ha)

an offence committed in England under section 36(1) of the Road Traffic Act 1988 (failure to comply with traffic sign) of failing to comply with a sign of the type referred to in—

(i)

item 51 or 53 in the table in Part 2 of Schedule 14 to the Traffic Signs Regulations and General Directions 2016, where that sign is placed for the purposes of a signal-controlled crossing facility or a parallel crossing as defined by Schedule 1 to that Instrument; or

(ii)

paragraph 1 of Part 6 of Schedule 7 to that Instrument (bus stop or bus stand clearway markings);

(i)

an offence F5committed in Wales under section 36(1) of the Road Traffic Act 1988 (failure to comply with traffic sign) of failing to comply with a sign of a type referred to in—

(i)

regulation 10(1)(b) of the Traffic Signs Regulations and General Directions 2002 (S.I. 2002/3113) (zig-zag lines relating to certain crossings), or

(ii)

regulation 29(1) of those regulations (bus stop or bus stand markings).

F6(3)

Outside Greater London there is a parking contravention in relation to a vehicle if it is parked in contravention of a prohibition imposed by an English local transport authority in accordance with regulations made under Schedule (Prohibition of parking on footways and verges) to the English Devolution and Community Empowerment Act 2026 (parking on footways and verges).

Annotations

Textual amendments

F1

Sch. 7 para. 4(2)(ba) inserted (18.5.2018) by The Civil Enforcement of Traffic Contraventions (Consequential Amendments) (England) Regulations 2018 (S.I. 2018/488), regs. 1, 2(3)(a)

F2

Words in Sch. 7 para. 4(2)(c) inserted (18.5.2018) by The Civil Enforcement of Traffic Contraventions (Consequential Amendments) (England) Regulations 2018 (S.I. 2018/488), regs. 1, 2(3)(b)

F3

Sch. 7 para. 4(2)(ea) inserted (30.1.2012) by The Traffic Management Act 2004 (Amendment of Schedule 7) (City of Exeter) Regulations 2012 (S.I. 2012/12), regs. 1, 2

F4

Sch. 7 para. 4(2)(ha) inserted (18.5.2018) by The Civil Enforcement of Traffic Contraventions (Consequential Amendments) (England) Regulations 2018 (S.I. 2018/488), regs. 1, 2(3)(c)

F5

Words in Sch. 7 para. 4(2)(i) inserted (18.5.2018) by The Civil Enforcement of Traffic Contraventions (Consequential Amendments) (England) Regulations 2018 (S.I. 2018/488), regs. 1, 2(3)(d)

F6

Sch. 7 para. 4(3) inserted (29.4.2026 for specified purposes) by English Devolution and Community Empowerment Act 2026 (c. 23), s. 108(1)(6), Sch. 32 para. 8(2)

Commencement

I1

Sch. 7 para. 4 in force at 23.7.2007 for E. by S.I. 2007/2053, arts. 1(2), 2(1)(2)(b) (with art. 4) (as amended (17.3.2008) by S.I. 2008/757, art. 3)

I2

Sch. 7 para. 4 in force at 31.3.2008 for W. by S.I. 2007/3174, art. 2, Sch.

Notes on Schedule 7

Modifications

C1

Sch. 7 modified (9.6.2009) by Nottingham Express Transit System Order 2009 (S.I. 2009/1300), arts. 1, 50(6)(b) (with Sch. 13 para. 14(2), Sch. 14 para. 19)

C2

Sch. 7 modified (21.4.2011) by The Network Rail (Hitchin (Cambridge Junction)) Order 2011 (S.I. 2011/1072), arts. 1, 37(4)(b)

C3

Sch. 7 modified (6.11.2013) by The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013 (S.I. 2013/2587), arts. 1, 41(6) (with arts. 42, 43)

C4

Sch. 7 applied (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 1, 37(6)(b)

C5

Sch. 7 modified (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 18(4)(b)

C6

Sch. 7 modified (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 47(6)(b) (with arts. 4, 37)

C7

Sch. 7 modified (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 16(6)(b) (with arts. 3(3), 5)

C8

Sch. 7 modified (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 15(3)

C9

Sch. 7 modified (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 15(3)

C10

Sch. 7 modified (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 12(8)

C11

Sch. 7 modified (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 19(6)(b) (with art. 3(1))

C12

Sch. 7 modified (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 16(6)(b) (with art. 5)

C13

Sch. 7 modified (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 16(4)(b) (with art. 32, Sch. 9 para. 36)

C14

Sch. 7 modified (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 15(7)(b) (with Sch. 8 Pt. 6 para. 19)

C15

Sch. 7 modified (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 24(5) (with arts. 62, 76, 87)

C16

Sch. 7 modified (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 51(6)(b) (with arts. 23, 53, Sch. 9 para. 65)

C17

Sch. 7 modified (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 49(6)(b) (with art. 46(2), Sch. 19 para. 61)

C18

Sch. 7 modified (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 20(6)(b) (with arts. 4, 37, 52, Sch. 9 para. 82)

C19

Sch. 7 modified (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 19(6)(b) (with art. 4)

C20

Sch. 7 modified (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 20(6)(b) (with arts. 4, 50)

C21

Sch. 7 modified (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 14(7)(c)

C22

Sch. 7 modified (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 18(3) (with arts. 5, 53, Sch. 8 paras. 6, 64)

C23

Sch. 7 modified (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 48(9)(b) (with arts. 6(2), 18, Sch. 11 paras. 5, 30)

C24

Sch. 7 modified (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 19(6) (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))

C25

Sch. 7 modified (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 23(6) (with arts. 4, 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)

C26

Sch. 7 modified (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 13(8), 16(3)(b) (with arts. 42, 43, Sch. 12 paras. 4, 5, 20, 35, 50, 51, 74, 91, 129, 135, 136, 177(3), 234, 345, 355, 356)

C27

Sch. 7 modified (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 17(5) (with Sch. 11 paras. 5, 22, 37, 47, 82, 110)

C28

Sch. 7 modified (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 42(7) (with arts. 18, 35, Sch. 9)

C29

Sch. 7 modified (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 45(4) (with art. 44, Sch. 15)

C30

Sch. 7 modified (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 19(4)(b) (with arts. 21, 41, Sch. 10)

C31

Sch. 7 modified (25.4.2024) by The Network Rail (Church Fenton Level Crossing Reduction) Order 2024 (S.I. 2024/526), arts. 1, 32(7)

C32

Sch. 7 modified (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 22(6) (with art. 6, Sch. 10)

C33

Sch. 7 modified (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 14(7)(c) (with art. 45, Sch. 14)

C34

Sch. 7 modified (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 43(9)(c) (with art. 44, Sch. 12)

C35

Sch. 7 modified (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 15(7) (with Sch. 15)

C36

Sch. 7 modified (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 15(7) (with art. 48, Sch. 15)

C37

Sch. 7 modified (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 46(4)(b) (with art. 40, Sch. 14)

C38

Sch. 7 modified (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), arts. 1, 20(6) (with art. 4, Sch. 10) (as amended by S.I. 2024/1020, Sch.)

Sch. 7 modified (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 41(6)(b) (with Sch. 15)

C39

Sch. 7 modified (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), arts. 1, 15(7) (with art. 47, Sch. 15)

C40

Sch. 7 modified (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 56(6) (with arts. 48, 59, Sch. 14)

C41

Sch. 7 modified (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 21(3)(b) (with Sch. 14)

C42

Sch. 7 modified (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 17(6) (with arts. 5, 43, 53(7), Sch. 14)

C43

Sch. 7 modified (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 17(4)(b) (with art. 41, Sch. 9)

C44

Sch. 7 modified (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), arts. 1, 15(7) (with art. 49, Sch. 14)

C45

Sch. 7 modified (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), arts. 1, 13(2) (with Sch. 10)

C46

Sch. 7 modified (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), arts. 1, 17(6)(c) (with art. 43, Sch. 11)

C47

Sch. 7 modified (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), arts. 1, 17(6) (with arts. 5, 34, Sch. 9)

C48

Sch. 7 modified (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 18(7) (with arts. 5, 9(6), 43, Sch. 9)

C49

Sch. 7 modified (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), arts. 1, 22(6) (with arts. 4, 9, 51, Sch. 9)

C50

Sch. 7 modified (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 17(7)(c) (with art. 49, Sch. 15)

C51

Sch. 7 modified (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), arts. 1, 16(7) (with art. 40, Sch. 13)

C52

Sch. 7 modified (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 20(7) (with Sch. 12)

C53

Sch. 7 modified (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), arts. 1, 16(6) (with Sch. 9)

C54

Sch. 7 modified (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 16(10) (with arts. 39, 40, Sch. 9)

C55

Sch. 7 modified (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 20(6) (with arts. 40, 45, Sch. 9) (which affecting provisions were superseded by S.I. 2026/537, arts. 1, 20(6) (with arts. 40, 45, Sch. 9))

C56

Sch. 7 modified (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), arts. 1(2), 15(4) (with arts. 42, 43, Sch. 18)

C57

Sch. 7 modified (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), arts. 1, 17(7) (with Sch. 14)

C58

Sch. 7 modified (30.4.2026) by The Springwell Solar Farm Order 2026 (S.I. 2026/419), arts. 1, 17(8) (with art. 48)

C59

Sch. 7 modified (5.6.2026) by The North Falls Offshore Wind Farm Order 2026 (S.I. 2026/567), arts. 1, 14(10) (with arts. 44, 45, Sch. 14)

C60

Sch. 7 modified (23.7.2026) by The Peartree Hill Solar Farm Order 2026 (S.I. 2026/869), arts. 1, 17(7) (with art. 37, Sch. 11)

C61

Sch. 7 modified (24.7.2026) by The Dean Moor Solar Farm Order 2026 (S.I. 2026/754), arts. 1, 17(7) (with Sch. 13)

C62

Sch. 7 modified (30.7.2026) by The One Earth Solar Farm Order 2026 (S.I. 2026/934), arts. 1, 16(7) (with art. 47)

C63

Sch. 7 modified (14.9.2026) by The Beacon Fen Energy Park Order 2026 (S.I. 2026/1025), arts. 1, 19(7) (with art. 39, Sch. 11 para. 131)