| A14 Cambridge to Huntingdon Improvement Scheme Development Consent 2016 |
S.I. 2016/547 |
11 May 2016 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 4, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Hornsea One Offshore Wind Farm 2016 |
S.I. 2016/471 |
31 Mar 2016 |
Schedule 6 paragraph 2 |
| East Anglia ONE Offshore Wind Farm (Corrections and Amendments) 2016 |
S.I. 2016/447 |
24 Mar 2016 |
— |
| Brechfa Forest West Wind Farm 2016 |
S.I. 2016/337 |
10 Mar 2016 |
Schedule 6 paragraph 2 |
| Infrastructure Planning (Onshore Wind Generating Stations) 2016 |
S.I. 2016/306 |
4 Mar 2016 |
Section 14, Section 232 |
| Thorpe Marsh Gas Pipeline 2016 |
S.I. 2016/297 |
3 Mar 2016 |
— |
| Palm Paper Mill Generating Station 2016 |
S.I. 2016/166 |
11 Feb 2016 |
— |
| A19/A1058 Coast Road (Junction Improvement) Development Consent 2016 |
S.I. 2016/73 |
28 Jan 2016 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 21, Schedule 5 paragraph 22, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| National Grid (Hinkley Point C Connection Project) 2016 |
S.I. 2016/49 |
19 Jan 2016 |
— |
| East Midlands Gateway Rail Freight Interchange and Highway 2016 |
S.I. 2016/17 |
12 Jan 2016 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 18, Schedule 5 paragraph 19, Schedule 5 paragraph 20, Schedule 5 paragraph 21, Schedule 5 paragraph 23, Schedule 5 paragraph 24, Schedule 5 paragraph 33, Schedule 5 paragraph 34, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Hirwaun Generating Station (Correction) 2015 |
S.I. 2015/2070 |
21 Dec 2015 |
— |
| Preesall Underground Gas Storage Facility (Correction) 2015 |
S.I. 2015/2071 |
21 Dec 2015 |
— |
| Port Talbot Steelworks Generating Station 2015 |
S.I. 2015/1984 |
8 Dec 2015 |
— |
| Ferrybridge Multifuel 2 Power Station 2015 |
S.I. 2015/1832 |
28 Oct 2015 |
— |
| North Killingholme (Generating Station) (Correction) 2015 |
S.I. 2015/1829 |
26 Oct 2015 |
— |
| Swansea Bay Tidal Generating Station (Correction) 2015 |
S.I. 2015/1830 |
26 Oct 2015 |
— |
| Town and Country Planning (Power to Override Easements and Applications by Statutory Undertakers) 2015 |
W.S.I. 2015/1794 |
13 Oct 2015 |
Section 203 |
| Dogger Bank Creyke Beck Offshore Wind Farm (Correction) 2015 |
S.I. 2015/1742 |
2 Oct 2015 |
— |
| Hinkley Point C (Nuclear Generating Station) 2015 |
S.I. 2015/1666 |
9 Sep 2015 |
Schedule 6 paragraph 2 |
| Willington C Gas Pipeline (Correction) 2015 |
S.I. 2015/1616 |
18 Aug 2015 |
— |
| Dogger Bank Teesside A and B Offshore Wind Farm 2015 |
S.I. 2015/1592 |
4 Aug 2015 |
— |
| Progress Power (Gas Fired Power Station) 2015 |
S.I. 2015/1570 |
23 Jul 2015 |
Section 114, Section 115, Section 120 |
| Hirwaun Generating Station 2015 |
S.I. 2015/1574 |
23 Jul 2015 |
— |
| Preesall Underground Gas Storage Facility 2015 |
S.I. 2015/1561 |
17 Jul 2015 |
Section 103, Section 114, Section 115, Section 120, Section 122, Section 123, Section 142, Section 149A |
| Galloper Wind Farm 2015 |
S.I. 2015/1460 |
2 Jul 2015 |
— |
| Swansea Bay Tidal Generating Station 2015 |
S.I. 2015/1386 |
9 Jun 2015 |
— |
| Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) 2015 |
S.I. 2015/1347 |
2 Jun 2015 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| White Moss Landfill 2015 |
S.I. 2015/1317 |
19 May 2015 |
Section 114 |
| Rampion Offshore Wind Farm (Correction) 2015 |
S.I. 2015/1319 |
13 May 2015 |
— |
| Hornsea One Offshore Wind Farm (Correction) 2015 |
S.I. 2015/1280 |
30 Apr 2015 |
— |
| Walney Extension Offshore Wind Farm (Correction) 2015 |
S.I. 2015/1270 |
24 Apr 2015 |
— |
| A160/A180 (Port of Immingham Improvement) Development Consent (Correction) 2015 |
S.I. 2015/1231 |
21 Apr 2015 |
— |
| Infrastructure Planning (Radioactive Waste Geological Disposal Facilities) 2015 |
S.I. 2015/949 |
26 Mar 2015 |
Section 14, Section 232 |
| Community Infrastructure Levy 2015 |
S.I. 2015/836 |
20 Mar 2015 |
Section 205, Section 218, Section 220, Section 222 |
| Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) 2015 |
S.I. 2015/760 |
18 Mar 2015 |
Section 4, Schedule 6 paragraph 2, Schedule 6 paragraph 4 |
| Thames Water Utilities Limited (Thames Tideway Tunnel) (Correction) 2015 |
S.I. 2015/723 |
12 Mar 2015 |
Schedule 4 paragraph 1 |
| Knottingley Power Plant 2015 |
S.I. 2015/680 |
10 Mar 2015 |
Section 114, Section 115, Section 120, Section 147 |
| Lancashire County Council (Torrisholme to the M6 Link (A683 Completion of Heysham to M6 Link Road)) 2015 |
S.I. 2015/571 |
5 Mar 2015 |
Section 153, Schedule 6 paragraph 2 |
| Infrastructure Planning (Interested Parties and Miscellaneous Prescribed Provisions) 2015 |
S.I. 2015/462 |
3 Mar 2015 |
Section 88, Section 102, Section 150, Section 154, Section 155, Section 170, Section 232 |
| Dogger Bank Creyke Beck Offshore Wind Farm 2015 |
S.I. 2015/318 |
17 Feb 2015 |
— |
| Cornwall Council (A30 Temple to Higher Carblake Improvement) (Correction) 2015 |
S.I. 2015/243 |
12 Feb 2015 |
Section 119, Schedule 4 |
| Cornwall Council (A30 Temple to Higher Carblake Improvement) 2015 |
S.I. 2015/147 |
5 Feb 2015 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 22, Schedule 5 paragraph 23, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| A160/A180 (Port of Immingham Improvement) Development Consent 2015 |
S.I. 2015/129 |
4 Feb 2015 |
Section 114, Section 115, Section 117, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 22, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Northumberland County Council (A1 – South East Northumberland Link Road (Morpeth Northern Bypass)) Development Consent 2015 |
S.I. 2015/23 |
12 Jan 2015 |
Section 114, Section 115, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 19, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Willington C Gas Pipeline 2014 |
S.I. 2014/3328 |
16 Dec 2014 |
— |
| Burbo Bank Extension Offshore Wind Farm (Correction) 2014 |
S.I. 2014/3301 |
10 Dec 2014 |
— |
| Hornsea One Offshore Wind Farm 2014 |
S.I. 2014/3331 |
10 Dec 2014 |
— |
| Walney Extension Offshore Wind Farm 2014 |
S.I. 2014/2950 |
7 Nov 2014 |
— |
| South Hook Combined Heat and Power Plant 2014 |
S.I. 2014/2846 |
22 Oct 2014 |
Section 114, Section 115, Section 120 |
| Town and Country Planning (Determination of Procedure) 2014 |
W.S.I. 2014/2773 |
14 Oct 2014 |
Section 203 |
| Planning Act 2008 (Commencement No. 3) 2014 |
W.S.I. 2014/2780 |
14 Oct 2014 |
Section 241 |
| Central Bedfordshire Council (Woodside Link Houghton Regis) Development Consent 2014 |
S.I. 2014/2637 |
30 Sep 2014 |
Section 114, Section 115, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 8, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 24, Schedule 5 paragraph 26, Schedule 5 paragraph 33, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Burbo Bank Extension Offshore Wind Farm 2014 |
S.I. 2014/2594 |
25 Sep 2014 |
— |
| North Killingholme (Generating Station) 2014 |
S.I. 2014/2434 |
11 Sep 2014 |
— |
| Clocaenog Forest Wind Farm 2014 |
S.I. 2014/2441 |
11 Sep 2014 |
— |
| Infrastructure Planning (Applications: Prescribed Forms and Procedure) 2014 |
S.I. 2014/2381 |
4 Sep 2014 |
Section 37, Section 232 |
| Thames Water Utilities Limited (Thames Tideway Tunnel) 2014 |
S.I. 2014/2384 |
3 Sep 2014 |
Section 103, Section 114, Section 115, Section 120, Section 122, Section 123 |
| A556 (Knutsford to Bowdon Improvement) Development Consent 2014 |
S.I. 2014/2269 |
28 Aug 2014 |
— |
| Rampion Offshore Wind Farm 2014 |
S.I. 2014/1873 |
16 Jul 2014 |
Section 114, Section 115, Section 120, Section 149A |
| Daventry International Rail Freight Interchange Alteration 2014 |
S.I. 2014/1796 |
3 Jul 2014 |
— |
| Planning Act 2008 (Commencement No. 2) 2014 |
W.S.I. 2014/1769 |
2 Jul 2014 |
Section 241 |
| Town and Country Planning (Non-Material Changes and Correction of Errors) 2014 |
W.S.I. 2014/1770 |
2 Jul 2014 |
Section 203 |
| East Anglia ONE Offshore Wind Farm 2014 |
S.I. 2014/1599 |
16 Jun 2014 |
— |
| National Grid (North London Reinforcement Project) 2014 |
S.I. 2014/1052 |
16 Apr 2014 |
Section 114, Section 115, Section 120 |
| Network Rail (Norton Bridge Area Improvements) 2014 |
S.I. 2014/909 |
31 Mar 2014 |
— |
| Town and Country Planning 2014 |
S.I. 2014/692 |
17 Mar 2014 |
Section 7, Section 232 |
| Community Infrastructure Levy 2014 |
S.I. 2014/385 |
23 Feb 2014 |
Section 205, Section 208, Section 209, Section 211, Section 215, Section 217, Section 218, Section 220, Section 222, Section 223 |
| Able Marine Energy Park Development Consent 2014 |
S.I. 2014/2935 |
13 Jan 2014 |
Section 114, Section 115, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 24, Schedule 5 paragraph 26, Schedule 5 paragraph 30A, Schedule 5 paragraph 32, Schedule 5 paragraph 32B, Schedule 5 paragraph 34, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| National Grid (King’s Lynn B Power Station Connection) 2013 |
S.I. 2013/3200 |
18 Dec 2013 |
Section 114, Section 115, Section 120 |
| Infrastructure Planning (Business or Commercial Projects) 2013 |
S.I. 2013/3221 |
17 Dec 2013 |
Section 35, Section 232 |
| Welsh Development Agency Act 1975 (Amendment) 2013 |
W.S.I. 2013/2948 |
20 Nov 2013 |
Section 194 |
| Hinkley Point C (Nuclear Generating Station) (Correction) 2013 |
S.I. 2013/2938 |
19 Nov 2013 |
— |
| Network Rail (Redditch Branch Enhancement) 2013 |
S.I. 2013/2809 |
31 Oct 2013 |
— |
| M1 Junction 10a (Grade Separation) 2013 |
S.I. 2013/2808 |
30 Oct 2013 |
Section 114, Section 115, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 24, Schedule 5 paragraph 26, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Galloper Wind Farm (Correction) 2013 |
S.I. 2013/2086 |
20 Aug 2013 |
— |
| North Blyth Biomass Power Station 2013 |
S.I. 2013/1873 |
24 Jul 2013 |
Section 114, Section 115, Section 120, Section 149A |
| Highway and Railway (Nationally Significant Infrastructure Project) 2013 |
S.I. 2013/1883 |
24 Jul 2013 |
Section 14, Section 232 |
| Triton Knoll Offshore Wind Farm 2013 |
S.I. 2013/1734 |
11 Jul 2013 |
— |
| East Northamptonshire Resource Management Facility 2013 |
S.I. 2013/1752 |
10 Jul 2013 |
— |
| Planning Act 2008 (Nationally Significant Infrastructure Projects) (Electric Lines) 2013 |
S.I. 2013/1479 |
17 Jun 2013 |
Section 14, Section 232 |
| Galloper Wind Farm 2013 |
S.I. 2013/1203 |
24 May 2013 |
— |
| Community Infrastructure Levy 2013 |
S.I. 2013/982 |
24 Apr 2013 |
Section 206, Section 209, Section 216A, Section 216B, Section 217, Section 220, Section 222 |
| Lancashire County Council (Torrisholme to the M6 Link (A683 Completion of Heysham to M6 Link Road)) 2013 |
S.I. 2013/675 |
19 Mar 2013 |
— |
| Hinkley Point C (Nuclear Generating Station) 2013 |
S.I. 2013/648 |
18 Mar 2013 |
Section 114, Section 115, Section 120 |
| Brechfa Forest West Wind Farm 2013 |
S.I. 2013/586 |
12 Mar 2013 |
Section 114, Section 115, Section 120 |
| Infrastructure Planning (Fees) 2013 |
S.I. 2013/498 |
6 Mar 2013 |
Section 4, Section 232 |
| Infrastructure Planning (Prescribed Consultees and Interested Parties etc.) 2013 |
S.I. 2013/522 |
6 Mar 2013 |
Section 7, Section 42, Section 56, Section 88, Section 102, Section 114, Section 123, Section 232, Schedule 6 paragraph 2, Schedule 6 paragraph 4 |
| Kentish Flats Extension 2013 |
S.I. 2013/343 |
19 Feb 2013 |
Section 114, Section 115, Section 120, Section 149A |
| Community Infrastructure Levy 2012 |
S.I. 2012/2975 |
28 Nov 2012 |
Section 205, Section 209, Section 211, Section 214, Section 216, Section 217, Section 220, Section 222 |
| Local Policing Bodies 2012 |
S.I. 2012/2732 |
30 Oct 2012 |
Section 4, Section 7, Section 37, Section 42, Section 48, Section 51, Section 56, Section 58, Section 59, Section 127, Section 232, Schedule 6 paragraph 2, Schedule 6 paragraph 4, Schedule 6 paragraph 6 |
| Network Rail (North Doncaster Chord) 2012 |
S.I. 2012/2635 |
16 Oct 2012 |
Section 114, Section 115, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 24, Schedule 5 paragraph 26, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Network Rail (Ipswich Chord) 2012 |
S.I. 2012/2284 |
5 Sep 2012 |
Section 114, Section 115, Section 120, Section 122, Schedule 5 paragraph 1, Schedule 5 paragraph 2, Schedule 5 paragraph 3, Schedule 5 paragraph 10, Schedule 5 paragraph 11, Schedule 5 paragraph 12, Schedule 5 paragraph 13, Schedule 5 paragraph 14, Schedule 5 paragraph 15, Schedule 5 paragraph 16, Schedule 5 paragraph 17, Schedule 5 paragraph 24, Schedule 5 paragraph 26, Schedule 5 paragraph 36, Schedule 5 paragraph 37 |
| Infrastructure Planning (Waste Water Transfer and Storage) 2012 |
S.I. 2012/1645 |
22 Jun 2012 |
Section 14, Section 232 |
| Planning Act 2008 (Commencement No. 1) 2012 |
W.S.I. 2012/802 |
10 Mar 2012 |
Section 241 |
| Planning Act 2008 (Commencement No. 2) 2012 |
S.I. 2012/601 |
28 Feb 2012 |
Section 241 |
| Planning Permission (Withdrawal of Development Order or Local Development Order) (Compensation) 2012 |
W.S.I. 2012/210 |
27 Jan 2012 |
Section 203 |
| Rookery South (Resource Recovery Facility) 2011 |
S.I. 2013/680 |
22 Nov 2011 |
Section 114, Section 115, Section 120 |
| Planning Act 2008 (Commencement No. 7) 2011 |
S.I. 2011/2054 |
18 Aug 2011 |
Section 241 |
| Community Infrastructure Levy 2011 |
S.I. 2011/987 |
28 Mar 2011 |
Section 205, Section 208, Section 209, Section 210, Section 215, Section 217, Section 218, Section 220, Section 222, Section 223 |
| Planning Act 2008 (Commencement No. 6) 2011 |
S.I. 2011/705 |
8 Mar 2011 |
Section 241 |