The Environmental Authorisations (Scotland) Regulations 2018
S.S.I. 2018/219 · Made 28 June 2018 · Extends to Scotland
Environmental Protection
Made 28th June 2018
Coming into force 1st September 2018
The Scottish Ministers make the following Regulations in exercise of the powers conferred by sections 18 and 58 and schedule 2 of the Regulatory Reform (Scotland) Act 2014 M1 (“the 2014 Act”), and all other powers enabling them to do so.
In accordance with section 19 of the 2014 Act, the Scottish Ministers have consulted (a) the Scottish Environment Protection Agency and (b) such other persons as they thought fit, including such persons appearing to them to be representative of the interests of local government, industry, agriculture, fisheries or small businesses as they considered appropriate.
In accordance with section 58(4) of the 2014 Act, a draft of this instrument has been laid before and approved by resolution of the Scottish Parliament.
Annotations to the whole text
Marginal citations
- M1
2014 asp 3. Section 16 makes provision relevant to the exercise of these powers.
Contents
- Part 1: General
- 1Citation and commencement
- 2Interpretation
- 2AInterpretation: best available techniques (“BAT”)
- 3Interpretation: regulated activity
- 4Interpretation: regulated activities
- 5Interpretation: authorised person
- 6Interpretation: technical schedule
- 7Prohibition
- 8Responsibility of authorised person
- 9General aims
- Part 2: General binding rules
- 10General binding rules
- Part 3: Notifications
- 11Notification and application of general binding rules
- 12Notifications
- 13Effect and cessation of notifications
- 14Surrender of notifications
- Part 4: Registrations
- 15Registrations
- 16Application for a registration
- 17Form and content of a registration
- 18Grant of a registration
- 19Variation of registrations
- Part 5: Permits
- 20Permits
- 21Applications for permits
- 22Form and content of permits
- 23Grant of permit
- 24Review of permits
- 25Variation of permits
- Part 6: Provisions relating to registrations and permits
- 26Schedule 1
- 27Transfer of a registration or permit
- 28Effect of transfer
- 29Transfer of revocation notice
- 30Surrender of registration or permit
- 31Revocation of permits and registrations
- 32Subsistence of a registration or permit
- Part 7: Standard conditions procedure
- 33Determining and revising standard conditions
- 34Standard conditions: consultation
- 35Standard conditions: publication
- 36Notification of revisions of standard conditions
- Part 8: Information and publicity
- 37Power to require the provision of information
- 38Register
- 39Register – exclusions
- 40Commercially confidential information
- 41Application for commercial confidentiality
- 42Review of decision on commercial confidentiality
- 43Effect of decision
- 44Information relating to criminal proceedings
- 45Register – exclusion of information affecting national security
- Part 9: Enforcement
- 46Regulatory notices
- 47SEPA: regulatory notices requiring cessation
- 48Withdrawing regulatory notices
- 49Regulatory notices: off-site conditions
- 50Enforcement by the courts
- Part 10: Costs recovery notices
- 51Costs recovery notices
- 52Payment requirements for costs recovery notices
- 53Recovery of payments
- Part 11: Notices
- 54Notices – general provisions
- Part 12: Appeals
- 55Appeals to the Scottish Ministers
- 56Determination of appeals
- 57Effect of notices etc. during consideration of appeal
- 58Appeals – miscellaneous
- Part 13: Duties and functions of SEPA
- 59Duty on SEPA to exercise its functions in accordance with the technical schedules
- 60Power of SEPA to impose authorisations
- 61Power of SEPA to escalate or de-escalate authorisations
- 62Action by SEPA
- 63Accelerated applications
- 64Consolidation of permits and registrations
- 65Communication of consolidation
- Part 14: SEPA– guidance and public participation statement
- 66SEPA guidance
- 67SEPA's public participation statement
- 68SEPA guidance – fit and proper person
- Part 15: Provisions relating to offences
- 69Offences
- 70Offences by bodies corporate
- 71Offences — acts or default of third person
- 72Offences – more than one authorised person
- 73Offences – defences
- 74Admissibility of evidence
- 75Power of court to order offence to be remedied
- Part 16: Duties and functions of the Scottish Ministers
- 76Guidance to SEPA
- 77Application of the Regulations to SEPA
- Part 17: Miscellaneous
- 78Crown application
- 79Transitional and savings provisions
- 80Consequential amendments
- 81Repeals and revocations
- Signature
- Schedule 1: REGISTRATIONS AND PERMITS: PROCEDURES
- Part 1: General provisions
- 1APre-application community engagement
- 1Form of application
- 2Accompanying information
- 3Withdrawing an application
- 4Modifying an application
- 5Notifications relating to certain applications
- 6Further information in respect of an application
- 7Public Consultation: scope
- 8Public consultation requirements
- 9Duty to determine an application
- 10Time limits for determining applications
- 11Extension of determination periods
- 12Calculating the determination period
- 13Variation Notices
- 14Surrender applications
- 15Notice of surrender
- 16Revocation of permits or registrations
- 17Interpretation: satisfactory state
- Part 2: Call-in procedure
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20 Repealed
- 21Paragraph 21 Repealed
- 22Paragraph 22 Repealed
- Part 3: Determinations of applications by the Scottish Ministers
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- Schedule 2: OFF-SITE CONDITIONS
- Part 1: Procedure
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- Part 2: Compensation for off-site conditions
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- Schedule 3REGISTER
- 1Paragraph 1
- Schedule 4: PROVISIONS RELATING TO APPEALS
- Part 1: Appeals procedure
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- Part 2: Public hearings
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- 22Paragraph 22
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- 26Paragraph 26
- 27Paragraph 27
- 28Paragraph 28
- 29Paragraph 29
- Part 3: Determination of appeals
- 30Paragraph 30
- Schedule 5: TRANSITIONAL AND SAVINGS PROVISIONS
- Part 1: General
- 1Interpretation
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Part 2: Metal contamination
- 7Paragraph 7
- Schedule 6: CONSEQUENTIAL AMENDMENTS
- Part 1: Public general acts
- 1Nuclear Installations Act 1965
- 2Environmental Protection Act 1990
- 3Environment Act 1995
- 4Food Standards Act 1999
- 5Energy Act 2004
- Part 2: Subordinate legislation
- 6Special Waste Regulations 1996
- 7Ionising Radiations Regulations 2017
- 8Weighing Equipment (Automatic Gravimetric Filling Instruments) Regulations 2000
- 9Weighing Equipment (Automatic Rail-weighbridges) Regulations 2003
- 10Weighing Equipment (Automatic Catchweighing Instruments) Regulations 2003
- 11Waste Management Licensing (Scotland) Regulations 2011 Repealed
- 12Water Environment (Controlled Activities) (Scotland) Regulations 2011 Repealed
- 13Environmental Regulation (Significant Environmental Harm) (Scotland) Order 2014
- 14Environmental Regulation (Relevant Offences) (Scotland) Order 2014
- 15The Environmental Regulation (Liability where Activity Carried Out by Arrangement with Another) (Scotland) Order 2014
- 16Environmental Regulation (Enforcement Measures) (Scotland) Order 2015
- 17Scottish Landfill Tax (Administration) Regulations 2015
- 18Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017
- Schedule 7: REPEALS AND REVOCATIONS
- Part 1: Public general acts
- 1Paragraph 1
- Part 2: Subordinate legislation
- 2Paragraph 2
- Schedule 8: RADIOACTIVE SUBSTANCES ACTIVITIES
- Part 1: Scope and interpretation
- 1Scope
- 2Paragraph 2
- 3Interpretation
- 4Interpretation: this schedule and schedule 9
- 5Interpretation: radioactive material and radioactive waste
- 6NORM industrial activity
- 7Processed radionuclides of natural terrestrial or cosmic origin
- 8Radionuclides not of natural terrestrial or cosmic origin
- 9Radionuclides with a short half-life
- 10Radionuclides not of natural terrestrial or cosmic origin in background radioactivity
- 11Substances or articles after disposal
- 12Historic radium contamination
- Part 2: Amendments to common framework provisions
- 13General Binding Rules – disapplication
- 14Authorisation by permit or registration
- 15Applications
- 16Consultation: local authorities and relevant water authorities
- 17Consultation: security of sealed sources
- 18Refusal of applications
- 19Paragraph 19
- 20Authorisation conditions: general
- 21Authorisation conditions: discharge limits
- 22Authorisation conditions: monitoring
- 23Authorisation conditions: high-activity sealed sources
- 24Authorisation conditions: manufacture and supply of high-activity sealed sources
- 25Authorisation conditions: records of high-activity sealed sources
- Part 3: Duties of SEPA
- 26General Principles of Radiological Protection: Optimisation and Dose Limitation
- 27Dose constraints
- 28Estimation of doses to the members of the public
- 29Paragraph 29
- 30Paragraph 30
- 31Inspections
- 32Record keeping
- 33Sealed sources
- 34Orphan Sources
- 35Paragraph 35
- 36Paragraph 36
- Part 4: Local authorities
- 37Paragraph 37
- 38Paragraph 38
- Part 5: Radioactivity to be disregarded for purposes of certain statutory provisions
- 39Statutory provisions
- 6Tables
- Paragraph
- Paragraph
- Paragraph
- Schedule 9: GENERAL BINDING RULES
- Part 1: General binding rules
- 1Radioactive Substances
- 2Water
- 3Waste
- 4Other emissions activities
- Part 2: Interpretation of general binding rules
- 1Paragraph 1
- 2Interpretation: NORM
- 3Interpretation: radioactive substances common rules
- 3Tables
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Paragraph
- Schedule 10: WATER ACTIVITIES
- Part 1: Scope and Interpretation
- 1Scope
- 2Scope
- Part 2: Amendments to common framework provisions
- 3Authorisation conditions: protection of the water environment
- 4Authorised person in relation to a private sewage activity
- Part 3: Duties on SEPA
- 5Duties: general
- 6Duties: environmental objectives
- Schedule 11: WASTE MANAGEMENT ACTIVITIES
- Part 1: Scope
- 1Scope
- 2Scope
- Part 2: Amendments to common framework provisions
- 3Duty on SEPA: waste hierarchy
- 4Duty on SEPA: inspections
- 5Authorisations: waste treatment
- 6Authorisations: record-keeping
- 7Authorisation conditions: metal contamination
- Schedule 12: HAZARDOUS WASTE MIXING AND WASTE OIL MIXING, AND TREATMENT OF WASTE OIL
- Part 1: Scope
- 1Scope
- Part 2: Amendments to common framework provisions
- 2Authorisations: hazardous waste mixing
- 3Authorisations: separation of mixed hazardous waste
- 4Authorisations: waste oils
- Schedule 13: LANDFILL ACTIVITIES
- Part 1: Scope and Interpretation
- 1Scope
- 2Interpretation: landfill
- 3Interpretation: landfill activity
- 4Interpretation: general
- Part 2: Amendments to common framework provisions
- 5Exemptions for certain landfills on islands and in isolated settlements
- 6Applications for authorisations
- 7Authorisation by permit and landfill classification
- 8Authorisation conditions: general
- 9Authorisation conditions: prohibition of acceptance of certain waste at landfills
- 10Authorisation conditions: waste which may be accepted in different classes of landfill
- 11Authorisation conditions: costs of disposal of waste in landfill
- 12Authorisation conditions: waste acceptance procedures
- 13Authorisation conditions: control and monitoring of operational landfill sites
- 14Authorisation conditions: closure and after-care procedures for landfills
- 15Surrender or revocation of permit for landfill activity
- Part 3: Waste acceptance criteria and procedures
- Chapter 1: General criteria
- 16General criteria for the acceptance of waste at all landfill
- 17Additional general criteria for the acceptance of waste at landfills for hazardous waste
- 18Additional general criteria for the acceptance of waste at landfills for non-hazardous waste
- 19Additional general criteria for the acceptance of waste at landfills for inert waste
- Chapter 2: Additional acceptance criteria
- 20Additional criteria for acceptance of waste at landfills for hazardous waste
- 21Additional criteria for acceptance of waste at landfills for non-hazardous waste
- 22Criteria for granular stable non-reactive hazardous waste deposited in a cell on its own and granular stable non-reactive hazardous waste and non-hazardous waste deposited in the same cell
- 23Criteria relating to gypsum based waste
- 24Criteria for asbestos waste
- 25Additional criteria for waste acceptable without testing at landfills for inert waste
- 26Limit values for waste acceptable at landfills for inert waste
- 27Criteria for underground storage
- 28Specific acceptance criteria for the temporary storage of mercury
- Chapter 3: Procedure for acceptance of waste at landfills
- 29Basic characterisation
- 30Compliance testing
- Part 4: Minimum monitoring procedures for landfills
- 31Paragraph 31
- 32Sampling and test methods
- 33Emission data: water, leachate and gas control
- 34Protection of groundwater: sampling
- 35Protection of groundwater: monitoring
- 36Protection of groundwater: trigger levels
- 37Topography of the site: data on landfill body
- Part 5: General requirements for all landfills
- 38Location
- 39Water control and leachate management
- 40Protection of soil and water and leachate collection and sealing systems
- 41Gas control
- 42Nuisances and hazards
- 43Stability
- 44Site security
- 45Site requirements for the temporary storage of mercury
- Schedule 14: MANAGEMENT OF SEPARATELY COLLECTED WASTE AND OPERATING A MATERIALS FACILITY
- Part 1: Scope and interpretation
- 1Scope
- 2Interpretation: general
- Part 2: Amendments to common framework provisions
- 3Authorisations: separately collected waste
- 4Authorisations: Materials Facilities Code
- Schedule 15: MANAGEMENT OF WASTE VEHICLES
- Part 1: Scope and interpretation
- 1Scope
- 2Interpretation: general
- Part 2: Amendments to common framework provisions
- 3Authorisations: general
- 4Authorisations: general conditions
- 5Authorisations: storage prior to treatment
- 6Authorisations: site requirements
- 7Authorisations: required treatment operations
- 8Authorisations: recovery and recycling
- Schedule 16: MANAGEMENT OF WASTE ELECTRICAL AND ELECTRONIC EQUIPMENT
- Part 1: Scope and interpretation
- 1Scope
- 2Interpretation: General
- Part 2: Amendments to common framework provisions
- 3Authorisation conditions: treatment of WEEE
- Part 3: Technical provisions
- 4Selective treatment for materials and components of WEEE
- 5Technical requirements for sites for storage of WEEE prior to treatment
- 6Technical requirements for WEEE treatment sites
- Schedule 17: MANAGEMENT OF WASTE BATTERIES
- Part 1: Scope and interpretation
- 1Scope
- 2Interpretation
- Part 2: Amendments to common framework provisions
- 3Authorisations: conditions
- Schedule 18: RECOVERY OF WASTE BY APPLICATION TO LAND FOR THE PURPOSE OF SOIL IMPROVEMENT
- Part 1: Scope and interpretation
- 1Scope
- 2Scope
- 3Scope
- 4Interpretation: general
- Part 2: Amendments to common framework provisions
- 5Authorisations: general
- 6Authorisation conditions: soil concentrations
- 7Authorisation conditions: sewage sludge
- 8Authorisation conditions: soil sampling
- 9Authorisation conditions: waste sampling
- 10Authorisation conditions: records
- Schedule 19: INDUSTRIAL EMISSIONS ACTIVITIES
- Part 1: Scope and interpretation
- 1Scope
- 2Scope
- 3Interpretation: general
- 4Interpretation: substantial change
- 5Interpretation: threshold values
- 6Interpretation: baseline and site reports
- Part 2: Amendments to common framework provisions
- 7Authorisations: general
- 8Authorisations: multiple installations and multiple authorised persons
- 9Authorisations: incidents, accidents and non-compliance
- 10Authorisations: greenhouse gas emissions
- Part 3: Duties of SEPA
- 11Duties relating to best available techniques
- 12Duties related to environmental impact assessments
- Schedule 20: SCHEDULE 20 EMISSIONS ACTIVITIES
- Part 1: Interpretation
- 1Scope
- 2Interpretation: polluting substances
- Part 2: Amendments to common framework provisions
- 3General principles: waste hierarchy
- 4General principles: BAT
- 5BAT: criteria for determining
- 6Duties relating to standard conditions
- 7Authorisations: general
- 8Permits: applications
- 9Permits: general conditions
- 10Permits: emission limit values and environmental quality standards
- 11Exception for the testing and use of emerging techniques
- 12Permits: surrender applications
- 13Permits: reviews
- 14Environmental inspection plans
- 15Environmental inspections
- 16Proposed change in operation
- 17Public consultation
- Part 3: SEPA and Scottish Ministers’ duties
- 18SEPA: trans-boundary effects
- 19Scottish Ministers’ duties: trans-boundary effects
- 20Scottish Ministers’ duties: access to justice
- Part 4: Activities
- Chapter 1: Energy industries
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Chapter 2: Production and processing of metals
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- Chapter 3: Mineral industry
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- Chapter 4: Chemical industry
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- 22Paragraph 22
- Chapter 5: Waste management
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- 26Paragraph 26
- 27Paragraph 27
- 28Paragraph 28
- 29Paragraph 29
- Chapter 6: Other activities
- 29Paragraph 29
- 30Paragraph 30
- 31Paragraph 31
- 32Paragraph 32
- 33Paragraph 33
- 34Paragraph 34
- 35Paragraph 35
- 36Paragraph 36
- 37Paragraph 37
- 38Paragraph 38
- 39Paragraph 39
- 40Paragraph 40
- Schedule 21: OPERATING A LARGE COMBUSTION PLANT
- Part 1: Scope and interpretation
- 1Scope and interpretation: operating a large combustion plant
- 2Interpretation: general
- 3Aggregation rules
- Part 2: Amendments to common framework provisions
- 4Authorisations: permits
- 5Permits: discharge of waste gases
- 6Permits: emission limit values
- 7Emission limit value exemptions: general
- 8Emission limit value exemptions: fuel shortages and interruptions
- 9Emission limit value exemptions: desulphurisation for combustion plants firing indigenous solid fuel
- 10Carbon capture and storage
- 11Abatement equipment malfunction or breakdown
- 12Emissions monitoring and compliance
- 13Multi-fuel firing combustion plants
- 14Monitoring and reporting
- 15Start-up and shut-down periods
- Part 3: Technical provisions relating to combustion plants
- Chapter 1: Emission limit values for combustion plants referred to in paragraph 6(1)
- 16Calculation of emission limit values
- 17Emission limit values for SO2 for combustion plants using solid or liquid fuels (with the exception of gas turbines and gas engines)
- 18Emission limit values for SO2 combustion plants using gaseous fuels (with the exception of gas turbines and gas engines)
- 19Emission limit values for NOx for combustion plants using solid or liquid fuels (with the exception of gas turbines and gas engines)
- 20Emission limit values for gas turbines using light and middle distillates as liquid fuels
- 21Emission limit values for NOx and CO for gas fired combustion plants
- 22Emission limit values for dust for combustion plants using solid or liquid fuels (except gas turbines and gas engines)
- 23Emission limit values for dust for combustion plants using gaseous fuels (except gas turbines and gas engines)
- Chapter 2: Emission limit values for combustion plants referred to in paragraphs 7(2) and 7(3)
- 24Calculation of emission limit values
- 25Emission limit values for SO2 combustion plants using solid or liquid fuels (except gas turbines and gas engines)
- 26Emission limit values for SO2 combustion plants using gaseous fuels (except gas turbines and gas engines)
- 27Emission limit values for NOx for combustion plants using solid or liquid fuels (except gas turbines and gas engines)
- 28Emission limit values for NOx and CO for gas turbines (including CCGT) using middle and light distillates as liquid fuels
- 29Emission limit values for NOx and CO for gas turbines (including CCGT) using middle and light distillates as liquid fuels
- 30Emission limit values for dust for combustion plants using solid or liquid fuels (except gas turbines and gas engines)
- 31Emission limit values for dust for combustion plants using gaseous fuels (except gas turbines and gas engines)
- Chapter 3: Emission monitoring
- 32Measurements
- 33Changes in fuel used or mode of operation of the plant
- 34Measurement of oxygen content, temperature, pressure and water vapour content of waste gases
- 35Relevant standards
- 36Confident interval values
- 37Validated hourly and daily averages
- 38Sulphur content
- Chapter 4: Assessment of compliance with emission limit values
- 39Paragraph 39
- Chapter 5: Minimum rate of desulphurisation
- 40Paragraph 40
- 41Paragraph 41
- 42Paragraph 42
- Chapter 6: Average emission limit values for multi-fuel combustion plants within a refinery
- 43Paragraph 43
- Schedule 22: INCINERATION AND CO-INCINERATION OF WASTE AT A WASTE INCINERATION PLANT OR WASTE CO-INCINERATION PLANT
- Part 1: Scope and Interpretation
- 1Scope
- 2Scope
- 3Interpretation: general
- Part 2: Amendments to common framework provisions
- 4Authorisations: applications
- 5Authorisations: general conditions
- 6Authorisations: control of emissions
- 7Authorisations: emissions monitoring
- 8Authorisations: operating conditions
- 9Variations to operating conditions
- 10Authorisations: delivery and reception of waste
- 11Authorisations: residues
- 12Authorisations: incineration of batteries
- 13Authorisations: review of conditions
- 14Reports
- 15Public consultation
- Part 3: Technical provisions relating to waste incineration plants and waste co-incineration plants
- Chapter 1: Definitions
- 16Paragraph 16
- Chapter 2: Equivalence factors for dibenzo-p-dioxins and dibenzofurans
- 17Paragraph 17
- Chapter 3: Air emission limit values for waste incineration plants
- 18Paragraph 18
- Chapter 4: Determination of air emission limit values for the co-incineration of waste
- 19Paragraph 19
- 20Special provisions for cement kilns co-incinerating waste
- 21Special provisions for combustion plants co-incinerating waste
- 22Special provisions for waste co-incineration plants in industrial sectors not covered under paragraphs 20 and 21 of this Part
- Chapter 5: Emission limit values for discharges of wastewater from the cleaning of waste gases
- 23Paragraph 23
- Chapter 6: Monitoring of emissions
- 24Measurement techniques
- 25Measurements relating to air polluting substances: requirements
- 26Measurements relating to air polluting substances: SEPA discretion as to requirements
- 27Measurements relating to water polluting substances
- Chapter 7: Formula to calculate the emission concentration at the standard percentage oxygen concentration
- 28Formula
- Chapter 8: Assessment of compliance with emission limit values
- 29Air emission limit values: general compliance
- 30Air emission limit values: carbon monoxide compliance
- 31Air emission limit values: determination of average values
- 32Water emission limit values
- Schedule 23: ORGANIC SOLVENT EMISSIONS ACTIVITIES
- Part 1: Scope and Interpretation
- 1Scope
- 2Interpretation: organic solvent emissions activity
- 3Interpretation: general
- Part 2: Amendments to common framework provisions
- 4Applications for authorisations
- 5Authorisation conditions: substitution of hazardous substances
- 6Authorisation conditions: control of emissions
- 7Authorisation conditions: control of emissions of hazard statement solvent substances
- 8Authorisation conditions: aggregation
- 9Authorisation conditions: start-up and shut-down
- 10Authorisation conditions: monitoring of emissions
- 11Compliance: emissions
- 12Compliance: collection and reporting of data
- 13Compliance: emission limit values
- 14Emission limit values: vehicle coating industry
- 15Authorisations: substantial change
- Part 3: Solvent management plans and reduction schemes
- 16Solvent management plans: requirements
- 17Solvent management plans: interpretation
- 18Use of solvent management plans for verification of compliance
- 19Reduction schemes: authorisation
- 20Reduction schemes: principles and requirements
- Schedule 24: TITANIUM DIOXIDE ACTIVITIES
- Part 1: Scope and Interpretation
- 1Scope and interpretation
- Part 2: Amendments to the common framework provisions
- 2Authorisation conditions: disposal of waste
- 3Emissions: water
- 4Emissions: air
- 5Emissions: monitoring and compliance
- Schedule 25: ENERGY EFFICIENCY REQUIREMENTS FOR SPECIFIED ACTIVITIES
- Part 1: Scope and Interpretation
- 1Scope and interpretation
- 2Interpretation: specified activity
- 3Specified activity: exemptions
- 4Interpretation: general
- 5Interpretation: high-efficiency cogeneration
- Part 2: Amendment of common framework provisions
- 6Cost-benefit analysis
- 7Cost-benefit analysis: principles
- 8Determination of applications
- 9General principles for the calculation of electricity from cogeneration
- 10Determining the efficiency of the cogeneration process
- 11Calculation of efficiency reference values
- Schedule 26: OTHER EMISSIONS ACTIVITIES
- Part 1: Scope and Interpretation
- 1Scope and interpretation
- 2Interpretation: threshold values
- Part 2: Amendments to common framework provisions
- 3General aims: guidance on best available techniques
- Part 3: Activities
- Chapter 1: Thermal treatment and associated activities
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- Chapter 2: Metals processes
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- 19Paragraph 19
- 20Paragraph 20
- 21Paragraph 21
- 22Paragraph 22
- Chapter 3: Mineral industry
- 23Paragraph 23
- 24Paragraph 24
- 25Paragraph 25
- 26Paragraph 26
- 27Paragraph 27
- 28Paragraph 28
- 29Paragraph 29
- 30Paragraph 30
- 31Paragraph 31
- 32Paragraph 32
- 33Paragraph 33
- 34Paragraph 34
- 35Paragraph 35
- 36Paragraph 36
- 37Paragraph 37
- 38Paragraph 38
- 39Paragraph 39
- 40Paragraph 40
- 41Paragraph 41
- 42Paragraph 42
- 43Paragraph 43
- 44Paragraph 44
- 45Paragraph 45
- Chapter 4: Chemical industry
- 46Paragraph 46
- 47Paragraph 47
- 48Paragraph 48
- 49Paragraph 49
- 50Paragraph 50
- 51Paragraph 51
- 52Paragraph 52
- 53Paragraph 53
- 54Paragraph 54
- 55Paragraph 55
- 56Paragraph 56
- 57Paragraph 57
- Chapter 5: Other activities
- 58Paragraph 58
- 59Paragraph 59
- 60Paragraph 60
- 61Paragraph 61
- 62Paragraph 62
- 63Paragraph 63
- 64Paragraph 64
- 65Paragraph 65
- 66Paragraph 66
- 67Paragraph 67
- 68Paragraph 68
- 69Paragraph 69
- 70Paragraph 70
- Chapter 6: Substances to air
- 71Paragraph 71
- Schedule 27: OPERATING A MEDIUM COMBUSTION PLANT
- Part 1: Scope and Interpretation
- 1Scope
- 2Interpretation: operating a medium combustion plant
- 3Interpretation: general
- 4Aggregation
- Part 2: Amendments to common framework provisions
- 5Authorisations
- 6Applications for medium combustion activity authorisations
- 7Emission limit values: calculation
- 8Emission limit values: general
- 9Emission limit values: existing medium combustion plant exemptions
- 10Emission limit values: exemptions
- 11Emission limit values: temporary exemptions
- 12Emission limit values: multiple fuels
- 13Emissions monitoring
- 14Compliance
- 15Compliance and measurement
- 16Public requests for monitoring data
- Part 3
- TablesChapter Tables
- Schedule 28: PETROL VAPOUR RECOVERY ACTIVITIES
- Part 1: Scope and Interpretation
- 1Scope
- 2Scope
- 3Interpretation
- Part 2: Amendments to common framework provisions
- 4Authorisation conditions: general
- 5Authorisation conditions: storage installations at terminals
- 6Authorisation conditions: loading and unloading installations at terminals
- 7Authorisation conditions: specifications for bottom-loading, vapour collection and overfill protection of European road tankers
- 8Authorisation conditions: loading and storage equipment at service stations
- 9Authorisations: requirements for Stage II petrol vapour recovery systems
- Explanatory note