Paragraph 23 F1

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

(1)

This paragraph applies where the acquiring authority serve notice of a decision to accept the counter-notice.

(2)

The compulsory purchase order has effect as if it included the owner's interest in the additional land.

(3)

If the acquiring authority have already served a notice to treat in relation to the land proposed to be acquired, the notice has effect as if it also included the owner's interest in the additional land.

(4)

If the acquiring authority have not served a notice to treat, they must serve a notice to treat in relation to the owner's interest in the whole of the land.

Annotations

Textual amendments

F1

Sch. 2A inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 para. 3; S.I. 2017/75, reg. 3(g) (with reg. 5)

Notes on Schedule 2A

Modifications

C1

Sch. 2A excluded by High Speed Rail (London - West Midlands) Act 2017 (c. 7), ss. 7(2), 8(2) (as amended (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 3; S.I. 2017/209, reg. 2)

C2

Sch. 2A modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 23(4), Sch. 7 para. 9

C3

Sch. 2A excluded (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 22(3) (with arts. 22(4), 32(2))

C4

Sch. 2A excluded (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 29(3)(a) (with arts. 4, 29(4), 37)

C5

Sch. 2A excluded (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 30(3)(a) (with arts. 30(4), 58, 59)

C6

Sch. 2A excluded (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 21(4)(a) (with arts. 24(8), 33(2))

C7

Sch. 2A excluded (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 27(4)(a) (with art. 27(5))

C8

Sch. 2A excluded (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 22(3)(a) (with arts. 22(4), 31(2))

C9

Sch. 2A excluded (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 27 (with arts. 3(3), 5)

C10

Sch. 2A excluded (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 26(3)(a)(4) (with arts. 55, 56)

C11

Sch. 2A excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 24(3)(a) (with art. 24(4))

C12

Sch. 2A excluded (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 25(3)(a) (with art. 25(4))

C13

Sch. 2A excluded (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 25(3)(a) (with art. 25(4))

C14

Sch. 2A excluded (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 31(3)(a) (with arts. 3(1), 31(4))

C15

Sch. 2A excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 23(3)(a) (with arts. 7, 23(4))

C16

Sch. 2A excluded (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 27(3)(a) (with arts. 5, 27(4), 44)

C17

Sch. 2A excluded (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 25(3)(a) (with arts. 7, 25(4))

C18

Sch. 2A excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 27(4)(a) (with arts. 51, 57)

C19

Sch. 2A excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 31(3)(a) (with arts. 31(4), 37)

C20

Sch. 2A excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 27(3)(a) (with arts. 5, 27(4), 44)

C21

Sch. 2A excluded (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 21(3)(a) (with arts. 21(4), 37)

C22

Sch. 2A modified (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), art. 1, Sch. 7 para. 5 (with arts. 41, 42, Sch. 16 para. 66)

C23

Sch. 2A excluded (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 27(3)(a) (with arts. 5, 27(4))

C24

Sch. 2A excluded (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 24(3)(a) (with art. 24(4), Sch. 9 para. 144)

C25

Sch. 2A excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 33(4)(a) (with art. 33(5))

C26

Sch. 2A excluded (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 28(3)(a) (with arts. 28(4), 32, Sch. 9 para. 36)

C27

Sch. 2A excluded (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 23(3) (with arts. 23(4), 40, 41, Sch. 9 Pt. 5 para. 18)

C28

Sch. 2A applied (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 26(4) (with art. 5, Sch. 27 para. 36)

C29

Sch. 2A excluded (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 30(3)(a) (with arts. 5, 30(4), Sch. 27 para. 36)

C30

Sch. 2A excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 6(2)(a), 7(2)(a), 64(1) (with s. 7(3))

C31

Sch. 2A excluded (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 31(3)(a) (with arts. 4, 31(4), 47)

C32

Sch. 2A excluded (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 26(3)(a) (with arts. 15, 50, Sch. 11 para. 29)

C33

Sch. 2A excluded (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 24(3)(a) (with arts. 41, 42, Sch. 17 para. 66)

C34

Sch. 2A excluded (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 24(3)(a) (with arts. 24(4), 41, 42, Sch. 16)

C35

Sch. 2A excluded (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 25(a) (with Sch. 8 Pt. 6 para. 19)

C36

Sch. 2A excluded (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 35 (with art. 55)

C37

Sch. 2A excluded (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 24(3)(a) (with arts. 24(4), 40, 41)

C38

Sch. 2A excluded (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 24(3)(a) (with arts. 24(4), 40, 41)

C39

Sch. 2A excluded (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 27(3)(a) (with art. 27(4))

C40

Sch. 2A excluded (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 30(3)(a) (with arts. 6, 30(4), 34)

C41

Sch. 2A excluded (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 32(3)(a) (with arts. 5, 32(4), 36)

C42

Sch. 2A excluded (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 32(3)(a) (with arts. 4, 32(4), 50)

C43

Sch. 2A excluded (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 35 (with arts. 35(4), 62, 76, 87, Sch. 19 paras. 4, 78)

C44

Sch. 2A excluded (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 31(3)(a) (with arts. 4, 31(4), 53)

C45

Sch. 2A excluded (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 35(3) (with arts. 23, 53, Sch. 9 para. 65)

C46

Sch. 2A excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 30-32 (with art. 46(2), Sch. 19 para. 61)

C47

Sch. 2A excluded (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 32(3) (with arts. 4, 52, Sch. 9 para. 82)

C48

Sch. 2A excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 31(3)(a) (with arts. 31(4), 51)

C49

Sch. 2A excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 32(3) (with arts. 4, 32(4))

C50

Sch. 2A excluded (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 29(3)(a) (with arts. 5, 29(4))

C51

Sch. 2A excluded (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 24(3)(a) (with arts. 24(4), 32, Sch. 10 paras. 26(2), 68)

C52

Sch. 2A excluded (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 32(3) (with arts. 4, 50)

C53

Sch. 2A excluded (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 23(3) (with art. 23(4))

C54

Sch. 2A excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 32(3)(a) (with arts. 5, 32(4), 53, Sch. 8 paras. 6, 64)

C55

Sch. 2A excluded (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 25(3) (with arts. 25(4), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)

C56

Sch. 2A excluded (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 27(4) (with arts. 6(2), 18, 27(5), Sch. 11 paras. 5, 30)

C57

Sch. 2A excluded (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 31(3) (with arts. 4, 31(4), 45, Sch. 9 paras. 6, 46, 54(1))

C58

Sch. 2A excluded (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 24

C59

Sch. 2A excluded (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 22(3) (with arts. 22(4), 43, Sch. 12 paras. 5, 24)

C60

Sch. 2A excluded (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 38(3) (with arts. 4, 38(4), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)

C61

Sch. 2A excluded (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 28(3) (with arts. 28(4), 42, 43, Sch. 12)

C62

Sch. 2A excluded (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 26(3) (with art. 26(4), Sch. 11)

C63

Sch. 2A excluded (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 27(3) (with arts. 18, 27(4), 35, Sch. 9)

C64

Sch. 2A excluded (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 34(3) (with art. 44, Sch. 15)

C65

Sch. 2A excluded (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 31(4) (with arts. 21, 41, Sch. 10)

C66

Sch. 2A excluded (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 22(4) (with arts. 22(5), 35, 36, Sch. 14)

C67

Sch. 2A excluded (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 34(3) (with art. 6, Sch. 10)

C68

Sch. 2A excluded (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 22(3) (with arts. 22(4), 44, Sch. 12)

C69

Sch. 2A excluded (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 25(3) (with art. 25(4), Sch. 15)

C70

Sch. 2A excluded (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 23(3) (with arts. 23(4), 45, Sch. 14)

C71

Sch. 2A excluded (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 25(3) (with arts. 25(4), 48, Sch. 15)

C72

Sch. 2A excluded (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 24(3) (with art. 40, Sch. 14)

Sch. 2A excluded (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), arts. 1, 32(3) (with arts. 4, 32(4), Sch. 10) (as amended by S.I. 2024/1020, Sch.)

C73

Sch. 2A excluded (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 26(3) (with art. 26(4), Sch. 15)

C74

Sch. 2A excluded (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), arts. 1, 25 (with art. 47, Sch. 15)

C75

Sch. 2A excluded (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 25 (with arts. 48, 59, Sch. 14)

C76

Sch. 2A excluded (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 30(3) (with art. 30(4), Sch. 14)

C77

Sch. 2A excluded (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 33(4) (with arts. 5, 33(5), 43, 53(7), Sch. 14)

C78

Sch. 2A excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), arts. 1, 29(3)(a), 30(6)(a) (with art. 50, Sch 15)

C79

Sch. 2A excluded (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 31(3)(a)(4) (with Sch. 8 paras. 36(3), 87)

C80

Sch. 2A excluded (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), arts. 1, 29(3) (with arts. 47, 48, Sch. 10)

C81

Sch. 2A excluded (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 29(4) (with art. 41, Sch. 9)

C82

Sch. 2A excluded (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), arts. 1, 25(3) (with arts. 25(4), 49, Sch. 14)

C83

Sch. 2A excluded (25.6.2025) by The M5 Junction 10 Development Consent Order 2025 (S.I. 2025/795), arts. 1, 29(3) (with arts. 4, 29(4), 43, Sch. 9)

C84

Sch. 2A excluded (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), arts. 1, 22(3) (with art. 22(4), Sch. 10)

C85

Sch. 2A excluded (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 25(3) (with arts. 37, 38, Sch. 10)

C86

Sch. 2A excluded (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), arts. 1, 25(4) (with art. 43, Sch. 11)

C87

Sch. 2A excluded (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), arts. 1, 28 (with arts. 5, 34, Sch. 9)

C88

Sch. 2A excluded (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 34(3) (with arts. 5, 9(6), 43, Sch. 9)

C89

Sch. 2A excluded (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), arts. 1, 37(3) (with arts. 4, 9, 37(4), 51, Sch. 9)

C90

Sch. 2A excluded (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 26(3) (with arts. 26(4), 49, Sch. 15)

C91

Sch. 2A excluded (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), arts. 1, 28(3) (with art. 40, Sch. 13)

C92

Sch. 2A excluded (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 31(3) (with art. 31(4), Sch. 12)

C93

Sch. 2A excluded (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), arts. 1, 25(3) (with art. 25(4), Sch. 9)

C94

Sch. 2A excluded (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 27(3) (with arts. 39, 40, Sch. 9)

C95

Sch. 2A excluded (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 36(3) (with arts. 36(4), 40, 45, Sch. 9) (which affecting provisions were superseded by S.I. 2026/537, arts. 1, 36(3) (with arts. 36(4), 40, 45, Sch. 9))

C96

Sch. 2A excluded (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), arts. 1(2), 24(3) (with arts. 24(4), 42, 43, Sch. 18)

C97

Sch. 2A excluded (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), arts. 1, 26(3) (with Sch. 14)

C98

Sch. 2A excluded (30.4.2026) by The Springwell Solar Farm Order 2026 (S.I. 2026/419), arts. 1, 26(3) (with arts. 26(4), 48)

C99

Sch. 2A excluded (5.6.2026) by The Dogger Bank South East and West Offshore Wind Farms Order 2026 (S.I. 2026/577), arts. 1, 26(4) (with arts. 26(5), 40, 41, Sch. 15)

C100

Sch. 2A excluded (5.6.2026) by The North Falls Offshore Wind Farm Order 2026 (S.I. 2026/567), arts. 1, 27(3) (with arts. 44, 45, Sch. 14)

C101

Sch. 2A excluded (23.7.2026) by The Peartree Hill Solar Farm Order 2026 (S.I. 2026/869), arts. 1, 28(3) (with art. 37, Sch. 11)

C102

Sch. 2A excluded (24.7.2026) by The Dean Moor Solar Farm Order 2026 (S.I. 2026/754), arts. 1, 28(3) (with Sch. 13)

C103

Sch. 2A excluded (30.7.2026) by The One Earth Solar Farm Order 2026 (S.I. 2026/934), arts. 1, 25(3) (with arts. 25(4), 47)

C104

Sch. 2A excluded (14.9.2026) by The Beacon Fen Energy Park Order 2026 (S.I. 2026/1025), arts. 1, 30(3) (with arts. 30(4), 39, Sch. 11 para. 131)