Paragraph 23 F1
This paragraph applies where the acquiring authority serve notice of a decision to accept the counter-notice.
The compulsory purchase order has effect as if it included the owner's interest in the additional land.
If the acquiring authority have already served a notice to treat in relation to the land proposed to be acquired, the notice has effect as if it also included the owner's interest in the additional land.
If the acquiring authority have not served a notice to treat, they must serve a notice to treat in relation to the owner's interest in the whole of the land.
Annotations
Textual amendments
- F1
Sch. 2A inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 para. 3; S.I. 2017/75, reg. 3(g) (with reg. 5)
Notes on Schedule 2A
Modifications
- C1
Sch. 2A excluded by High Speed Rail (London - West Midlands) Act 2017 (c. 7), ss. 7(2), 8(2) (as amended (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 3; S.I. 2017/209, reg. 2)
- C2
Sch. 2A modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 23(4), Sch. 7 para. 9
- C3
Sch. 2A excluded (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 22(3) (with arts. 22(4), 32(2))
- C4
Sch. 2A excluded (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 29(3)(a) (with arts. 4, 29(4), 37)
- C5
Sch. 2A excluded (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 30(3)(a) (with arts. 30(4), 58, 59)
- C6
Sch. 2A excluded (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 21(4)(a) (with arts. 24(8), 33(2))
- C7
Sch. 2A excluded (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 27(4)(a) (with art. 27(5))
- C8
Sch. 2A excluded (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 22(3)(a) (with arts. 22(4), 31(2))
- C9
Sch. 2A excluded (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 27 (with arts. 3(3), 5)
- C10
Sch. 2A excluded (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 26(3)(a)(4) (with arts. 55, 56)
- C11
Sch. 2A excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 24(3)(a) (with art. 24(4))
- C12
Sch. 2A excluded (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 25(3)(a) (with art. 25(4))
- C13
Sch. 2A excluded (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 25(3)(a) (with art. 25(4))
- C14
Sch. 2A excluded (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 31(3)(a) (with arts. 3(1), 31(4))
- C15
Sch. 2A excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 23(3)(a) (with arts. 7, 23(4))
- C16
Sch. 2A excluded (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 27(3)(a) (with arts. 5, 27(4), 44)
- C17
Sch. 2A excluded (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 25(3)(a) (with arts. 7, 25(4))
- C18
Sch. 2A excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 27(4)(a) (with arts. 51, 57)
- C19
Sch. 2A excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 31(3)(a) (with arts. 31(4), 37)
- C20
Sch. 2A excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 27(3)(a) (with arts. 5, 27(4), 44)
- C21
Sch. 2A excluded (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 21(3)(a) (with arts. 21(4), 37)
- C22
Sch. 2A modified (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), art. 1, Sch. 7 para. 5 (with arts. 41, 42, Sch. 16 para. 66)
- C23
Sch. 2A excluded (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 27(3)(a) (with arts. 5, 27(4))
- C24
Sch. 2A excluded (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 24(3)(a) (with art. 24(4), Sch. 9 para. 144)
- C25
Sch. 2A excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 33(4)(a) (with art. 33(5))
- C26
Sch. 2A excluded (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 28(3)(a) (with arts. 28(4), 32, Sch. 9 para. 36)
- C27
Sch. 2A excluded (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 23(3) (with arts. 23(4), 40, 41, Sch. 9 Pt. 5 para. 18)
- C28
Sch. 2A applied (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 26(4) (with art. 5, Sch. 27 para. 36)
- C29
Sch. 2A excluded (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 30(3)(a) (with arts. 5, 30(4), Sch. 27 para. 36)
- C30
Sch. 2A excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 6(2)(a), 7(2)(a), 64(1) (with s. 7(3))
- C31
Sch. 2A excluded (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 31(3)(a) (with arts. 4, 31(4), 47)
- C32
Sch. 2A excluded (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 26(3)(a) (with arts. 15, 50, Sch. 11 para. 29)
- C33
Sch. 2A excluded (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 24(3)(a) (with arts. 41, 42, Sch. 17 para. 66)
- C34
Sch. 2A excluded (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 24(3)(a) (with arts. 24(4), 41, 42, Sch. 16)
- C35
Sch. 2A excluded (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 25(a) (with Sch. 8 Pt. 6 para. 19)
- C36
Sch. 2A excluded (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 35 (with art. 55)
- C37
Sch. 2A excluded (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 24(3)(a) (with arts. 24(4), 40, 41)
- C38
Sch. 2A excluded (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 24(3)(a) (with arts. 24(4), 40, 41)
- C39
Sch. 2A excluded (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 27(3)(a) (with art. 27(4))
- C40
Sch. 2A excluded (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 30(3)(a) (with arts. 6, 30(4), 34)
- C41
Sch. 2A excluded (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 32(3)(a) (with arts. 5, 32(4), 36)
- C42
Sch. 2A excluded (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 32(3)(a) (with arts. 4, 32(4), 50)
- C43
Sch. 2A excluded (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 35 (with arts. 35(4), 62, 76, 87, Sch. 19 paras. 4, 78)
- C44
Sch. 2A excluded (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 31(3)(a) (with arts. 4, 31(4), 53)
- C45
Sch. 2A excluded (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 35(3) (with arts. 23, 53, Sch. 9 para. 65)
- C46
Sch. 2A excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 30-32 (with art. 46(2), Sch. 19 para. 61)
- C47
Sch. 2A excluded (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 32(3) (with arts. 4, 52, Sch. 9 para. 82)
- C48
Sch. 2A excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 31(3)(a) (with arts. 31(4), 51)
- C49
Sch. 2A excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 32(3) (with arts. 4, 32(4))
- C50
Sch. 2A excluded (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 29(3)(a) (with arts. 5, 29(4))
- C51
Sch. 2A excluded (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 24(3)(a) (with arts. 24(4), 32, Sch. 10 paras. 26(2), 68)
- C52
Sch. 2A excluded (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 32(3) (with arts. 4, 50)
- C53
Sch. 2A excluded (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 23(3) (with art. 23(4))
- C54
Sch. 2A excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 32(3)(a) (with arts. 5, 32(4), 53, Sch. 8 paras. 6, 64)
- C55
Sch. 2A excluded (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 25(3) (with arts. 25(4), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
- C56
Sch. 2A excluded (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 27(4) (with arts. 6(2), 18, 27(5), Sch. 11 paras. 5, 30)
- C57
Sch. 2A excluded (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 31(3) (with arts. 4, 31(4), 45, Sch. 9 paras. 6, 46, 54(1))
- C58
Sch. 2A excluded (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 24
- C59
Sch. 2A excluded (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 22(3) (with arts. 22(4), 43, Sch. 12 paras. 5, 24)
- C60
Sch. 2A excluded (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 38(3) (with arts. 4, 38(4), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
- C61
Sch. 2A excluded (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 28(3) (with arts. 28(4), 42, 43, Sch. 12)
- C62
Sch. 2A excluded (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 26(3) (with art. 26(4), Sch. 11)
- C63
Sch. 2A excluded (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 27(3) (with arts. 18, 27(4), 35, Sch. 9)
- C64
Sch. 2A excluded (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 34(3) (with art. 44, Sch. 15)
- C65
Sch. 2A excluded (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 31(4) (with arts. 21, 41, Sch. 10)
- C66
Sch. 2A excluded (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 22(4) (with arts. 22(5), 35, 36, Sch. 14)
- C67
Sch. 2A excluded (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 34(3) (with art. 6, Sch. 10)
- C68
Sch. 2A excluded (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 22(3) (with arts. 22(4), 44, Sch. 12)
- C69
Sch. 2A excluded (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 25(3) (with art. 25(4), Sch. 15)
- C70
Sch. 2A excluded (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 23(3) (with arts. 23(4), 45, Sch. 14)
- C71
Sch. 2A excluded (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 25(3) (with arts. 25(4), 48, Sch. 15)
- C72
Sch. 2A excluded (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 24(3) (with art. 40, Sch. 14)
Sch. 2A excluded (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), arts. 1, 32(3) (with arts. 4, 32(4), Sch. 10) (as amended by S.I. 2024/1020, Sch.)
- C73
Sch. 2A excluded (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 26(3) (with art. 26(4), Sch. 15)
- C74
Sch. 2A excluded (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), arts. 1, 25 (with art. 47, Sch. 15)
- C75
Sch. 2A excluded (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 25 (with arts. 48, 59, Sch. 14)
- C76
Sch. 2A excluded (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 30(3) (with art. 30(4), Sch. 14)
- C77
Sch. 2A excluded (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 33(4) (with arts. 5, 33(5), 43, 53(7), Sch. 14)
- C78
Sch. 2A excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), arts. 1, 29(3)(a), 30(6)(a) (with art. 50, Sch 15)
- C79
Sch. 2A excluded (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 31(3)(a)(4) (with Sch. 8 paras. 36(3), 87)
- C80
Sch. 2A excluded (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), arts. 1, 29(3) (with arts. 47, 48, Sch. 10)
- C81
Sch. 2A excluded (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 29(4) (with art. 41, Sch. 9)
- C82
Sch. 2A excluded (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), arts. 1, 25(3) (with arts. 25(4), 49, Sch. 14)
- C83
Sch. 2A excluded (25.6.2025) by The M5 Junction 10 Development Consent Order 2025 (S.I. 2025/795), arts. 1, 29(3) (with arts. 4, 29(4), 43, Sch. 9)
- C84
Sch. 2A excluded (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), arts. 1, 22(3) (with art. 22(4), Sch. 10)
- C85
Sch. 2A excluded (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 25(3) (with arts. 37, 38, Sch. 10)
- C86
Sch. 2A excluded (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), arts. 1, 25(4) (with art. 43, Sch. 11)
- C87
Sch. 2A excluded (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), arts. 1, 28 (with arts. 5, 34, Sch. 9)
- C88
Sch. 2A excluded (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 34(3) (with arts. 5, 9(6), 43, Sch. 9)
- C89
Sch. 2A excluded (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), arts. 1, 37(3) (with arts. 4, 9, 37(4), 51, Sch. 9)
- C90
Sch. 2A excluded (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 26(3) (with arts. 26(4), 49, Sch. 15)
- C91
Sch. 2A excluded (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), arts. 1, 28(3) (with art. 40, Sch. 13)
- C92
Sch. 2A excluded (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 31(3) (with art. 31(4), Sch. 12)
- C93
Sch. 2A excluded (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), arts. 1, 25(3) (with art. 25(4), Sch. 9)
- C94
Sch. 2A excluded (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 27(3) (with arts. 39, 40, Sch. 9)
- C95
Sch. 2A excluded (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 36(3) (with arts. 36(4), 40, 45, Sch. 9) (which affecting provisions were superseded by S.I. 2026/537, arts. 1, 36(3) (with arts. 36(4), 40, 45, Sch. 9))
- C96
Sch. 2A excluded (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), arts. 1(2), 24(3) (with arts. 24(4), 42, 43, Sch. 18)
- C97
Sch. 2A excluded (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), arts. 1, 26(3) (with Sch. 14)
- C98
Sch. 2A excluded (30.4.2026) by The Springwell Solar Farm Order 2026 (S.I. 2026/419), arts. 1, 26(3) (with arts. 26(4), 48)
- C99
Sch. 2A excluded (5.6.2026) by The Dogger Bank South East and West Offshore Wind Farms Order 2026 (S.I. 2026/577), arts. 1, 26(4) (with arts. 26(5), 40, 41, Sch. 15)
- C100
Sch. 2A excluded (5.6.2026) by The North Falls Offshore Wind Farm Order 2026 (S.I. 2026/567), arts. 1, 27(3) (with arts. 44, 45, Sch. 14)
- C101
Sch. 2A excluded (23.7.2026) by The Peartree Hill Solar Farm Order 2026 (S.I. 2026/869), arts. 1, 28(3) (with art. 37, Sch. 11)
- C102
Sch. 2A excluded (24.7.2026) by The Dean Moor Solar Farm Order 2026 (S.I. 2026/754), arts. 1, 28(3) (with Sch. 13)
- C103
Sch. 2A excluded (30.7.2026) by The One Earth Solar Farm Order 2026 (S.I. 2026/934), arts. 1, 25(3) (with arts. 25(4), 47)
- C104
Sch. 2A excluded (14.9.2026) by The Beacon Fen Energy Park Order 2026 (S.I. 2026/1025), arts. 1, 30(3) (with arts. 30(4), 39, Sch. 11 para. 131)