Part 1 Counter-notice where acquiring authority has not taken possessionF1

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

  1. Introduction
  2. Counter-notice requiring authority to purchase whole of land
  3. Effect of counter-notice on notice of entry
  4. Acquiring authority must respond to counter-notice within three months
  5. Effects of accepting counter-notice or referring it to the Upper Tribunal

Annotations

Textual amendments

F1

Sch. 2A inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 17 para. 3; S.I. 2017/75, reg. 3(g) (with reg. 5)

Notes on Schedule 2A

Modifications

C1

Sch. 2A excluded by High Speed Rail (London - West Midlands) Act 2017 (c. 7), ss. 7(2), 8(2) (as amended (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 3; S.I. 2017/209, reg. 2)

C2

Sch. 2A modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 23(4), Sch. 7 para. 9

C3

Sch. 2A excluded (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 22(3) (with arts. 22(4), 32(2))

C4

Sch. 2A excluded (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 29(3)(a) (with arts. 4, 29(4), 37)

C5

Sch. 2A excluded (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 30(3)(a) (with arts. 30(4), 58, 59)

C6

Sch. 2A excluded (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 21(4)(a) (with arts. 24(8), 33(2))

C7

Sch. 2A excluded (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 27(4)(a) (with art. 27(5))

C8

Sch. 2A excluded (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 22(3)(a) (with arts. 22(4), 31(2))

C9

Sch. 2A excluded (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 27 (with arts. 3(3), 5)

C10

Sch. 2A excluded (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 26(3)(a)(4) (with arts. 55, 56)

C11

Sch. 2A excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 24(3)(a) (with art. 24(4))

C12

Sch. 2A excluded (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 25(3)(a) (with art. 25(4))

C13

Sch. 2A excluded (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 25(3)(a) (with art. 25(4))

C14

Sch. 2A excluded (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 31(3)(a) (with arts. 3(1), 31(4))

C15

Sch. 2A excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 23(3)(a) (with arts. 7, 23(4))

C16

Sch. 2A excluded (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 27(3)(a) (with arts. 5, 27(4), 44)

C17

Sch. 2A excluded (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 25(3)(a) (with arts. 7, 25(4))

C18

Sch. 2A excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 27(4)(a) (with arts. 51, 57)

C19

Sch. 2A excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 31(3)(a) (with arts. 31(4), 37)

C20

Sch. 2A excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 27(3)(a) (with arts. 5, 27(4), 44)

C21

Sch. 2A excluded (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 21(3)(a) (with arts. 21(4), 37)

C22

Sch. 2A modified (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), art. 1, Sch. 7 para. 5 (with arts. 41, 42, Sch. 16 para. 66)

C23

Sch. 2A excluded (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 27(3)(a) (with arts. 5, 27(4))

C24

Sch. 2A excluded (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 24(3)(a) (with art. 24(4), Sch. 9 para. 144)

C25

Sch. 2A excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 33(4)(a) (with art. 33(5))

C26

Sch. 2A excluded (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 28(3)(a) (with arts. 28(4), 32, Sch. 9 para. 36)

C27

Sch. 2A excluded (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 23(3) (with arts. 23(4), 40, 41, Sch. 9 Pt. 5 para. 18)

C28

Sch. 2A applied (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 26(4) (with art. 5, Sch. 27 para. 36)

C29

Sch. 2A excluded (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 30(3)(a) (with arts. 5, 30(4), Sch. 27 para. 36)

C30

Sch. 2A excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 6(2)(a), 7(2)(a), 64(1) (with s. 7(3))

C31

Sch. 2A excluded (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 31(3)(a) (with arts. 4, 31(4), 47)

C32

Sch. 2A excluded (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 26(3)(a) (with arts. 15, 50, Sch. 11 para. 29)

C33

Sch. 2A excluded (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 24(3)(a) (with arts. 41, 42, Sch. 17 para. 66)

C34

Sch. 2A excluded (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 24(3)(a) (with arts. 24(4), 41, 42, Sch. 16)

C35

Sch. 2A excluded (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 25(a) (with Sch. 8 Pt. 6 para. 19)

C36

Sch. 2A excluded (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 35 (with art. 55)

C37

Sch. 2A excluded (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 24(3)(a) (with arts. 24(4), 40, 41)

C38

Sch. 2A excluded (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 24(3)(a) (with arts. 24(4), 40, 41)

C39

Sch. 2A excluded (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 27(3)(a) (with art. 27(4))

C40

Sch. 2A excluded (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 30(3)(a) (with arts. 6, 30(4), 34)

C41

Sch. 2A excluded (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 32(3)(a) (with arts. 5, 32(4), 36)

C42

Sch. 2A excluded (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 32(3)(a) (with arts. 4, 32(4), 50)

C43

Sch. 2A excluded (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 35 (with arts. 35(4), 62, 76, 87, Sch. 19 paras. 4, 78)

C44

Sch. 2A excluded (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 31(3)(a) (with arts. 4, 31(4), 53)

C45

Sch. 2A excluded (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 35(3) (with arts. 23, 53, Sch. 9 para. 65)

C46

Sch. 2A excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 30-32 (with art. 46(2), Sch. 19 para. 61)

C47

Sch. 2A excluded (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 32(3) (with arts. 4, 52, Sch. 9 para. 82)

C48

Sch. 2A excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 31(3)(a) (with arts. 31(4), 51)

C49

Sch. 2A excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 32(3) (with arts. 4, 32(4))

C50

Sch. 2A excluded (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 29(3)(a) (with arts. 5, 29(4))

C51

Sch. 2A excluded (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 24(3)(a) (with arts. 24(4), 32, Sch. 10 paras. 26(2), 68)

C52

Sch. 2A excluded (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 32(3) (with arts. 4, 50)

C53

Sch. 2A excluded (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 23(3) (with art. 23(4))

C54

Sch. 2A excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 32(3)(a) (with arts. 5, 32(4), 53, Sch. 8 paras. 6, 64)

C55

Sch. 2A excluded (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 25(3) (with arts. 25(4), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)

C56

Sch. 2A excluded (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 27(4) (with arts. 6(2), 18, 27(5), Sch. 11 paras. 5, 30)

C57

Sch. 2A excluded (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 31(3) (with arts. 4, 31(4), 45, Sch. 9 paras. 6, 46, 54(1))

C58

Sch. 2A excluded (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 24

C59

Sch. 2A excluded (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 22(3) (with arts. 22(4), 43, Sch. 12 paras. 5, 24)

C60

Sch. 2A excluded (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 38(3) (with arts. 4, 38(4), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)

C61

Sch. 2A excluded (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 28(3) (with arts. 28(4), 42, 43, Sch. 12)

C62

Sch. 2A excluded (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 26(3) (with art. 26(4), Sch. 11)

C63

Sch. 2A excluded (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 27(3) (with arts. 18, 27(4), 35, Sch. 9)

C64

Sch. 2A excluded (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 34(3) (with art. 44, Sch. 15)

C65

Sch. 2A excluded (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 31(4) (with arts. 21, 41, Sch. 10)

C66

Sch. 2A excluded (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 22(4) (with arts. 22(5), 35, 36, Sch. 14)

C67

Sch. 2A excluded (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 34(3) (with art. 6, Sch. 10)

C68

Sch. 2A excluded (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 22(3) (with arts. 22(4), 44, Sch. 12)

C69

Sch. 2A excluded (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 25(3) (with art. 25(4), Sch. 15)

C70

Sch. 2A excluded (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 23(3) (with arts. 23(4), 45, Sch. 14)

C71

Sch. 2A excluded (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 25(3) (with arts. 25(4), 48, Sch. 15)

C72

Sch. 2A excluded (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 24(3) (with art. 40, Sch. 14)

Sch. 2A excluded (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), arts. 1, 32(3) (with arts. 4, 32(4), Sch. 10) (as amended by S.I. 2024/1020, Sch.)

C73

Sch. 2A excluded (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 26(3) (with art. 26(4), Sch. 15)

C74

Sch. 2A excluded (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), arts. 1, 25 (with art. 47, Sch. 15)

C75

Sch. 2A excluded (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 25 (with arts. 48, 59, Sch. 14)

C76

Sch. 2A excluded (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 30(3) (with art. 30(4), Sch. 14)

C77

Sch. 2A excluded (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 33(4) (with arts. 5, 33(5), 43, 53(7), Sch. 14)

C78

Sch. 2A excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), arts. 1, 29(3)(a), 30(6)(a) (with art. 50, Sch 15)

C79

Sch. 2A excluded (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 31(3)(a)(4) (with Sch. 8 paras. 36(3), 87)

C80

Sch. 2A excluded (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), arts. 1, 29(3) (with arts. 47, 48, Sch. 10)

C81

Sch. 2A excluded (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 29(4) (with art. 41, Sch. 9)

C82

Sch. 2A excluded (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), arts. 1, 25(3) (with arts. 25(4), 49, Sch. 14)

C83

Sch. 2A excluded (25.6.2025) by The M5 Junction 10 Development Consent Order 2025 (S.I. 2025/795), arts. 1, 29(3) (with arts. 4, 29(4), 43, Sch. 9)

C84

Sch. 2A excluded (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), arts. 1, 22(3) (with art. 22(4), Sch. 10)

C85

Sch. 2A excluded (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 25(3) (with arts. 37, 38, Sch. 10)

C86

Sch. 2A excluded (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), arts. 1, 25(4) (with art. 43, Sch. 11)

C87

Sch. 2A excluded (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), arts. 1, 28 (with arts. 5, 34, Sch. 9)

C88

Sch. 2A excluded (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 34(3) (with arts. 5, 9(6), 43, Sch. 9)

C89

Sch. 2A excluded (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), arts. 1, 37(3) (with arts. 4, 9, 37(4), 51, Sch. 9)

C90

Sch. 2A excluded (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 26(3) (with arts. 26(4), 49, Sch. 15)

C91

Sch. 2A excluded (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), arts. 1, 28(3) (with art. 40, Sch. 13)

C92

Sch. 2A excluded (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 31(3) (with art. 31(4), Sch. 12)

C93

Sch. 2A excluded (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), arts. 1, 25(3) (with art. 25(4), Sch. 9)

C94

Sch. 2A excluded (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 27(3) (with arts. 39, 40, Sch. 9)

C95

Sch. 2A excluded (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 36(3) (with arts. 36(4), 40, 45, Sch. 9) (which affecting provisions were superseded by S.I. 2026/537, arts. 1, 36(3) (with arts. 36(4), 40, 45, Sch. 9))

C96

Sch. 2A excluded (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), arts. 1(2), 24(3) (with arts. 24(4), 42, 43, Sch. 18)

C97

Sch. 2A excluded (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), arts. 1, 26(3) (with Sch. 14)

C98

Sch. 2A excluded (30.4.2026) by The Springwell Solar Farm Order 2026 (S.I. 2026/419), arts. 1, 26(3) (with arts. 26(4), 48)

C99

Sch. 2A excluded (5.6.2026) by The Dogger Bank South East and West Offshore Wind Farms Order 2026 (S.I. 2026/577), arts. 1, 26(4) (with arts. 26(5), 40, 41, Sch. 15)

C100

Sch. 2A excluded (5.6.2026) by The North Falls Offshore Wind Farm Order 2026 (S.I. 2026/567), arts. 1, 27(3) (with arts. 44, 45, Sch. 14)

C101

Sch. 2A excluded (23.7.2026) by The Peartree Hill Solar Farm Order 2026 (S.I. 2026/869), arts. 1, 28(3) (with art. 37, Sch. 11)

C102

Sch. 2A excluded (24.7.2026) by The Dean Moor Solar Farm Order 2026 (S.I. 2026/754), arts. 1, 28(3) (with Sch. 13)

C103

Sch. 2A excluded (30.7.2026) by The One Earth Solar Farm Order 2026 (S.I. 2026/934), arts. 1, 25(3) (with arts. 25(4), 47)

C104

Sch. 2A excluded (14.9.2026) by The Beacon Fen Energy Park Order 2026 (S.I. 2026/1025), arts. 1, 30(3) (with arts. 30(4), 39, Sch. 11 para. 131)