Schedule A1 Counter-notice requiring purchase of land not in general vesting declarationC1C2C3C4C5C6C7C8C9C10C11C12C13C14C15C16C17C18C19C20C21C22C23C24C25C26C27C28C29C30C31C32C33C34C35C36C37C38C39C40C41C42C43C44C45C46C47C48C49C50C51C52C53C54C55C56C57C58C59C60C61C62C63C64C65C66C67C68C69C70C71C72C73C74C75C76C77C78C79C80C81C82C83C84C85C86C87C88C89C90C91C92C93C94C95C96C97C98C99C100C101C102C103C104C105F1
England and Wales
- 1Counter-notice requiring purchase of additional land
- 2Consequences of counter-notice
- 3Determination by the Upper Tribunal
Annotations
Textual amendments
- F1
Sch. A1 inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 6; S.I. 2017/75, reg. 3(k) (with reg. 5)
Modifications
- C1
Sch. A1 excluded by 2017 c. 7, s. 7(2) (as amended (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 2; S.I. 2017/209, reg. 2)
- C2
Sch. A1 excluded by 2017 c. 7, s. 8(2) (as amended (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 3; S.I. 2017/209, reg. 2)
- C3
Sch. A1 excluded (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 22(3) (with arts. 22(4), 32(2))
- C4
Sch. A1 excluded (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 29(3)(b) (with arts. 4, 29(4), 37)
- C5
Sch. A1 excluded (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 30(3)(b) (with arts. 30(4), 58, 59)
- C6
Sch. A1 excluded (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 21(4)(b) (with arts. 24(8), 33(2))
- C7
Sch. A1 excluded (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 27(4)(b) (with art. 27(5))
- C8
Sch. A1 excluded (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 22(3)(b) (with arts. 22(4), 31(2))
- C9
Sch. A1 excluded (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 27 (with arts. 3(3), 5)
- C10
Sch. A1 excluded (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 26(3)(b)(4) (with arts. 55, 56)
- C11
Sch. A1 excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 24(3)(b) (with art. 24(4))
- C12
Sch. A1 excluded (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 25(3)(b) (with art. 25(4))
- C13
Sch. A1 excluded (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 25(3)(b) (with art. 25(4))
- C14
Sch. A1 excluded (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1(1), 31(3)(b) (with arts. 3(1), 31(4))
- C15
Sch. A1 excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 23(3)(b) (with arts. 7, 23(4))
- C16
Sch. A1 excluded (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 27(3)(b) (with arts. 5, 27(4), 44)
- C17
Sch. A1 excluded (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 25(3)(b) (with arts. 7, 25(4))
- C18
Sch. A1 excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 27(4)(b) (with arts. 51, 57)
- C19
Sch. A1 excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 31(3)(b) (with arts. 31(4), 37)
- C20
Sch. A1 excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 27(3)(b) (with arts. 5, 27(4), 44)
- C21
Sch. A1 excluded (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 21(3)(b) (with arts. 21(4), 37)
- C22
Sch. A1 excluded (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 27(3)(b) (with arts. 5, 27(4))
- C23
Sch. A1 excluded (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 24(3)(b) (with art. 24(4), Sch. 9 para. 144)
- C24
Sch. A1 excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 33(4)(b) (with art. 33(5))
- C25
Sch. A1 excluded (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 28(3)(b) (with arts. 28(4), 32, Sch. 9 para. 36)
- C26
Sch. A1 excluded (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 23(3) (with arts. 23(4), 40, 41, Sch. 9 Pt. 5 para. 18)
- C27
Sch. A1 excluded (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 30(3)(b) (with arts. 5, 30(4), Sch. 27 para. 36)
- C28
Sch. A1 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 7(2)(b), 64(1) (with s. 7(3))
- C29
Sch. A1 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 6(2)(b), 64(1)
- C30
Sch. A1 excluded (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 31(3)(b) (with arts. 4, 31(4), 47)
- C31
Sch. A1 excluded (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 26(3)(b) (with arts. 15, 50, Sch. 11 para. 29)
- C32
Sch. A1 excluded (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 24(3)(b) (with arts. 41, 42, Sch. 17 para. 66)
- C33
Sch. A1 excluded (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 24(3)(b) (with arts. 24(4), 41, 42, Sch. 16)
- C34
Sch. A1 excluded (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 25(b) (with Sch. 8 Pt. 6 para. 19)
- C35
Sch. A1 excluded (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 35 (with art. 55)
- C36
Sch. A1 excluded (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 24(3)(b) (with arts. 40, 41)
- C37
Sch. A1 excluded (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 24(3)(b) (with arts. 24(4), 40, 41)
- C38
Sch. A1 excluded (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 27(3)(b) (with art. 27(4))
- C39
Sch. A1 excluded (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 30(3)(b) (with arts. 6, 30(4), 34)
- C40
Sch. A1 excluded (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 32(3)(b) (with arts. 5, 32(4), 36)
- C41
Sch. A1 excluded (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 32(3)(b) (with arts. 4, 32(4), 50)
- C42
Sch. A1 excluded (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 35 (with arts. 35(4), 62, 76, 87)
- C43
Sch. A1 excluded (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 31(3)(b) (with arts. 4, 31(4), 53)
- C44
Sch. A1 excluded (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 35(3)(b)
- C45
Sch. A1 excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 30-32 (with art. 46(2), Sch. 19 para. 61)
- C46
Sch. A1 excluded (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 32(3) (with arts. 4, 52, Sch. 9 para. 82)
- C47
Sch. A1 excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 31(3)(b) (with arts. 31(4), 51)
- C48
Sch. A1 excluded (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 29(3)(b) (with arts. 5, 29(4))
- C49
Sch. A1 excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 32(3) (with arts. 4, 32(4))
- C50
Sch. A1 excluded (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 32(3) (with arts. 4, 50)
- C51
Sch. A1 excluded (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 24(3)(b) (with arts. 24(4), 32, Sch. 10 paras. 26(2), 68)
- C52
Sch. A1 excluded (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 23(3) (with art. 23(4))
- C53
Sch. A1 excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 32(3)(b) (with arts. 5, 32(4), 53, Sch. 8 paras. 6, 64)
- C54
Sch. A1 excluded (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 25(3) (with arts. 25(4), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
- C55
Sch. A1 excluded (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 27(4) (with arts. 6(2), 18, 27(5), Sch. 11 paras. 5, 30)
- C56
Sch. A1 excluded (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 31(3) (with arts. 4, 31(4), 45, Sch. 9 paras. 6, 46, 54(1))
- C57
Sch. A1 excluded (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 24
- C58
Sch. A1 excluded (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 22(3) (with arts. 22(4), 43, Sch. 12 paras. 5, 24)
- C59
Sch. A1 excluded (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 38(3) (with arts. 4, 38(4), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
- C60
Sch. A1 excluded (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 28(3) (with arts. 28(4), 42, 43, Sch. 12)
- C61
Sch. A1 excluded (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 26(3) (with art. 26(4), Sch. 11)
- C62
Sch. A1 excluded (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 27(3) (with arts. 18, 27(4), 35, Sch. 9)
- C63
Sch. A1 excluded (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 34(3) (with art. 44, Sch. 15)
- C64
Sch. A1 excluded (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 31(4) (with arts. 21, 41, Sch. 10)
- C65
Sch. A1 excluded (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 22(4) (with arts. 22(5), 35, 36, Sch. 14)
- C66
Sch. A1 excluded (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 34(3) (with art. 6, Sch. 10)
- C67
Sch. A1 excluded (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 23(3) (with arts. 23(4), 45, Sch. 14)
- C68
Sch. A1 excluded (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 25(3) (with art. 25(4), Sch. 15)
- C69
Sch. A1 excluded (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 22(3) (with arts. 22(4), 44, Sch. 12)
- C70
Sch. A1 excluded (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 25(3) (with arts. 25(4), 48, Sch. 15)
- C71
Sch. A1 excluded (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 24(3) (with art. 40, Sch. 14)
- C72
Sch. A1 excluded (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), arts. 1, 32(3) (with arts. 4, 32(4), Sch. 10) (as amended by S.I. 2024/1020, Sch.)
Sch. A1 excluded (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 26(3) (with art. 26(4), Sch. 15)
- C73
Sch. A1 excluded (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), arts. 1, 25 (with art. 47, Sch. 15)
- C74
Sch. A1 excluded (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 25 (with arts. 48, 59, Sch. 14)
- C75
Sch. A1 excluded (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 30(3) (with art. 30(4), Sch. 14)
- C76
Sch. A1 excluded (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 33(4) (with arts. 5, 33(5), 43, 53(7), Sch. 14)
- C77
Sch. A1 excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), arts. 1, 29(3)(b), 30(6)(b)
- C78
Sch. A1 excluded (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 31(3)(b)(4) (with Sch. 8 paras. 36(3), 87)
- C79
Sch. A1 excluded (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), arts. 1, 29(3) (with arts. 47, 48, Sch. 10)
- C80
Sch. A1 excluded (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 29(4) (with art. 41, Sch. 9)
- C81
Sch. A1 excluded (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), arts. 1, 25(3) (with arts. 25(4), 49, Sch. 14)
- C82
Sch. A1 excluded (25.6.2025) by The M5 Junction 10 Development Consent Order 2025 (S.I. 2025/795), arts. 1, 29(3) (with arts. 4, 29(4), 43, Sch. 9)
- C83
Sch. A1 excluded (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), arts. 1, 22(3) (with art. 22(4), Sch. 10)
- C84
Sch. A1 excluded (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 25(3) (with arts. 37, 38, Sch. 10)
- C85
Sch. A1 excluded (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), arts. 1, 25(4) (with art. 43, Sch. 11)
- C86
Sch. A1 excluded (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), arts. 1, 28 (with arts. 5, 34, Sch. 9)
- C87
Sch. A1 excluded (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 34(3) (with arts. 5, 9(6), 43, Sch. 9)
- C88
Sch. A1 excluded (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), arts. 1, 37(3) (with arts. 4, 9, 37(4), 51, Sch. 9)
- C89
Sch. A1 excluded (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 26(3) (with arts. 26(4), 49, Sch. 15)
- C90
Sch. A1 excluded (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), arts. 1, 28(3) (with art. 40, Sch. 13)
- C91
Sch. A1 excluded (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 31(3) (with art. 31(4), Sch. 12)
- C92
Sch. A1 excluded (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), arts. 1, 25(3) (with art. 25(4), Sch. 9)
- C93
Sch. A1 excluded (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 27(3) (with arts. 39, 40, Sch. 9)
- C94
Sch. A1 excluded (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 36(3) (with arts. 36(4), 40, 45, Sch. 9)
- C95
Sch. A1 excluded (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), arts. 1(2), 24(3) (with arts. 24(4), 42, 43, Sch. 18)
- C96
Sch. A1 excluded (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), arts. 1, 26(3) (with Sch. 14)
- C97
Sch. A1 excluded (30.4.2026) by The Springwell Solar Farm Order 2026 (S.I. 2026/419), arts. 1, 26(3) (with arts. 26(4), 48)
- C98
Sch. A1 excluded (5.6.2026) by The Dogger Bank South East and West Offshore Wind Farms Order 2026 (S.I. 2026/577), arts. 1, 26(4) (with arts. 26(5), 40, 41, Sch. 15)
- C99
Sch. A1 excluded (5.6.2026) by The North Falls Offshore Wind Farm Order 2026 (S.I. 2026/567), arts. 1, 27(3) (with arts. 44, 45, Sch. 14)
- C100
Sch. A1 excluded (23.7.2026) by The Peartree Hill Solar Farm Order 2026 (S.I. 2026/869), arts. 1, 28(3) (with art. 37, Sch. 11)
- C101
Sch. A1 excluded (24.7.2026) by The Dean Moor Solar Farm Order 2026 (S.I. 2026/754), arts. 1, 28(3) (with Sch. 13)
- C102
Sch. A1 excluded (30.7.2026) by The One Earth Solar Farm Order 2026 (S.I. 2026/934), arts. 1, 25(3) (with arts. 25(4), 47)
- C103
Sch. A1 excluded (14.9.2026) by The Beacon Fen Energy Park Order 2026 (S.I. 2026/1025), arts. 1, 30(3) (with arts. 30(4), 39, Sch. 11 para. 131)
- C104
Sch. A1 excluded (30.10.2026) by The Green Hill Solar Farm Order 2026 (S.I. 2026/1074), arts. 1, 29(3) (with art. 29(4), Sch. 15)
- C105
Sch. A1 excluded (31.10.2026) by The Steeple Renewables Project Order 2026 (S.I. 2026/1086), arts. 1, 23(3) (with art. 23(4), Sch. 10)