Paragraph 16 F1
England and Wales
This paragraph applies where the Upper Tribunal specifies in its determination that the acquiring authority ought to be required to take the whole or part of the additional land (“the specified land”).
The general vesting declaration and any notice to treat (and, where applicable, the compulsory purchase order) are to have effect as if they included the owner's interest in the specified land.
The Upper Tribunal must order a vesting date for—
the specified land, and
any land proposed to be acquired which has not vested in the authority and for which no vesting date has been specified under paragraph 12.
If the vesting date for the specified land is after the vesting date for any land proposed to be acquired, the Upper Tribunal's power to award compensation under section 7 of the Compulsory Purchase Act 1965 includes power to award compensation for any loss suffered by the owner by reason of the temporary severance of the land proposed to be acquired from the specified land.
Annotations
Textual amendments
- F1
Sch. A1 inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 6; S.I. 2017/75, reg. 3(k) (with reg. 5)
- F2
Sch. A1 para. 16(4) inserted (19.7.2017) by Neighbourhood Planning Act 2017 (c. 20), ss. 41, 46(1); S.I. 2017/767, reg. 2(j)
Notes on Schedule A1
Modifications
- C1
Sch. A1 excluded by 2017 c. 7, s. 7(2) (as amended (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 2; S.I. 2017/209, reg. 2)
- C2
Sch. A1 excluded by 2017 c. 7, s. 8(2) (as amended (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 3; S.I. 2017/209, reg. 2)
- C3
Sch. A1 excluded (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 22(3) (with arts. 22(4), 32(2))
- C4
Sch. A1 excluded (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 29(3)(b) (with arts. 4, 29(4), 37)
- C5
Sch. A1 excluded (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 30(3)(b) (with arts. 30(4), 58, 59)
- C6
Sch. A1 excluded (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 21(4)(b) (with arts. 24(8), 33(2))
- C7
Sch. A1 excluded (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 27(4)(b) (with art. 27(5))
- C8
Sch. A1 excluded (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 22(3)(b) (with arts. 22(4), 31(2))
- C9
Sch. A1 excluded (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 27 (with arts. 3(3), 5)
- C10
Sch. A1 excluded (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 26(3)(b)(4) (with arts. 55, 56)
- C11
Sch. A1 excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 24(3)(b) (with art. 24(4))
- C12
Sch. A1 excluded (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 25(3)(b) (with art. 25(4))
- C13
Sch. A1 excluded (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 25(3)(b) (with art. 25(4))
- C14
Sch. A1 excluded (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1(1), 31(3)(b) (with arts. 3(1), 31(4))
- C15
Sch. A1 excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 23(3)(b) (with arts. 7, 23(4))
- C16
Sch. A1 excluded (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 27(3)(b) (with arts. 5, 27(4), 44)
- C17
Sch. A1 excluded (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 25(3)(b) (with arts. 7, 25(4))
- C18
Sch. A1 excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 27(4)(b) (with arts. 51, 57)
- C19
Sch. A1 excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 31(3)(b) (with arts. 31(4), 37)
- C20
Sch. A1 excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 27(3)(b) (with arts. 5, 27(4), 44)
- C21
Sch. A1 excluded (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 21(3)(b) (with arts. 21(4), 37)
- C22
Sch. A1 excluded (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 27(3)(b) (with arts. 5, 27(4))
- C23
Sch. A1 excluded (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 24(3)(b) (with art. 24(4), Sch. 9 para. 144)
- C24
Sch. A1 excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 33(4)(b) (with art. 33(5))
- C25
Sch. A1 excluded (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 28(3)(b) (with arts. 28(4), 32, Sch. 9 para. 36)
- C26
Sch. A1 excluded (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 23(3) (with arts. 23(4), 40, 41, Sch. 9 Pt. 5 para. 18)
- C27
Sch. A1 excluded (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 30(3)(b) (with arts. 5, 30(4), Sch. 27 para. 36)
- C28
Sch. A1 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 7(2)(b), 64(1) (with s. 7(3))
- C29
Sch. A1 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 6(2)(b), 64(1)
- C30
Sch. A1 excluded (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 31(3)(b) (with arts. 4, 31(4), 47)
- C31
Sch. A1 excluded (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 26(3)(b) (with arts. 15, 50, Sch. 11 para. 29)
- C32
Sch. A1 excluded (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 24(3)(b) (with arts. 41, 42, Sch. 17 para. 66)
- C33
Sch. A1 excluded (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 24(3)(b) (with arts. 24(4), 41, 42, Sch. 16)
- C34
Sch. A1 excluded (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 25(b) (with Sch. 8 Pt. 6 para. 19)
- C35
Sch. A1 excluded (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 35 (with art. 55)
- C36
Sch. A1 excluded (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 24(3)(b) (with arts. 40, 41)
- C37
Sch. A1 excluded (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 24(3)(b) (with arts. 24(4), 40, 41)
- C38
Sch. A1 excluded (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 27(3)(b) (with art. 27(4))
- C39
Sch. A1 excluded (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 30(3)(b) (with arts. 6, 30(4), 34)
- C40
Sch. A1 excluded (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 32(3)(b) (with arts. 5, 32(4), 36)
- C41
Sch. A1 excluded (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 32(3)(b) (with arts. 4, 32(4), 50)
- C42
Sch. A1 excluded (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 35 (with arts. 35(4), 62, 76, 87)
- C43
Sch. A1 excluded (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 31(3)(b) (with arts. 4, 31(4), 53)
- C44
Sch. A1 excluded (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 35(3)(b)
- C45
Sch. A1 excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 30-32 (with art. 46(2), Sch. 19 para. 61)
- C46
Sch. A1 excluded (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 32(3) (with arts. 4, 52, Sch. 9 para. 82)
- C47
Sch. A1 excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 31(3)(b) (with arts. 31(4), 51)
- C48
Sch. A1 excluded (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 29(3)(b) (with arts. 5, 29(4))
- C49
Sch. A1 excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 32(3) (with arts. 4, 32(4))
- C50
Sch. A1 excluded (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 32(3) (with arts. 4, 50)
- C51
Sch. A1 excluded (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 24(3)(b) (with arts. 24(4), 32, Sch. 10 paras. 26(2), 68)
- C52
Sch. A1 excluded (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 23(3) (with art. 23(4))
- C53
Sch. A1 excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 32(3)(b) (with arts. 5, 32(4), 53, Sch. 8 paras. 6, 64)
- C54
Sch. A1 excluded (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 25(3) (with arts. 25(4), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
- C55
Sch. A1 excluded (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 27(4) (with arts. 6(2), 18, 27(5), Sch. 11 paras. 5, 30)
- C56
Sch. A1 excluded (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 31(3) (with arts. 4, 31(4), 45, Sch. 9 paras. 6, 46, 54(1))
- C57
Sch. A1 excluded (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 24
- C58
Sch. A1 excluded (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 22(3) (with arts. 22(4), 43, Sch. 12 paras. 5, 24)
- C59
Sch. A1 excluded (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 38(3) (with arts. 4, 38(4), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
- C60
Sch. A1 excluded (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 28(3) (with arts. 28(4), 42, 43, Sch. 12)
- C61
Sch. A1 excluded (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 26(3) (with art. 26(4), Sch. 11)
- C62
Sch. A1 excluded (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 27(3) (with arts. 18, 27(4), 35, Sch. 9)
- C63
Sch. A1 excluded (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 34(3) (with art. 44, Sch. 15)
- C64
Sch. A1 excluded (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 31(4) (with arts. 21, 41, Sch. 10)
- C65
Sch. A1 excluded (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 22(4) (with arts. 22(5), 35, 36, Sch. 14)
- C66
Sch. A1 excluded (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 34(3) (with art. 6, Sch. 10)
- C67
Sch. A1 excluded (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 23(3) (with arts. 23(4), 45, Sch. 14)
- C68
Sch. A1 excluded (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 25(3) (with art. 25(4), Sch. 15)
- C69
Sch. A1 excluded (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 22(3) (with arts. 22(4), 44, Sch. 12)
- C70
Sch. A1 excluded (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 25(3) (with arts. 25(4), 48, Sch. 15)
- C71
Sch. A1 excluded (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 24(3) (with art. 40, Sch. 14)
- C72
Sch. A1 excluded (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), arts. 1, 32(3) (with arts. 4, 32(4), Sch. 10) (as amended by S.I. 2024/1020, Sch.)
Sch. A1 excluded (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 26(3) (with art. 26(4), Sch. 15)
- C73
Sch. A1 excluded (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), arts. 1, 25 (with art. 47, Sch. 15)
- C74
Sch. A1 excluded (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 25 (with arts. 48, 59, Sch. 14)
- C75
Sch. A1 excluded (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 30(3) (with art. 30(4), Sch. 14)
- C76
Sch. A1 excluded (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 33(4) (with arts. 5, 33(5), 43, 53(7), Sch. 14)
- C77
Sch. A1 excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), arts. 1, 29(3)(b), 30(6)(b)
- C78
Sch. A1 excluded (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 31(3)(b)(4) (with Sch. 8 paras. 36(3), 87)
- C79
Sch. A1 excluded (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), arts. 1, 29(3) (with arts. 47, 48, Sch. 10)
- C80
Sch. A1 excluded (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 29(4) (with art. 41, Sch. 9)
- C81
Sch. A1 excluded (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), arts. 1, 25(3) (with arts. 25(4), 49, Sch. 14)
- C82
Sch. A1 excluded (25.6.2025) by The M5 Junction 10 Development Consent Order 2025 (S.I. 2025/795), arts. 1, 29(3) (with arts. 4, 29(4), 43, Sch. 9)
- C83
Sch. A1 excluded (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), arts. 1, 22(3) (with art. 22(4), Sch. 10)
- C84
Sch. A1 excluded (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 25(3) (with arts. 37, 38, Sch. 10)
- C85
Sch. A1 excluded (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), arts. 1, 25(4) (with art. 43, Sch. 11)
- C86
Sch. A1 excluded (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), arts. 1, 28 (with arts. 5, 34, Sch. 9)
- C87
Sch. A1 excluded (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 34(3) (with arts. 5, 9(6), 43, Sch. 9)
- C88
Sch. A1 excluded (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), arts. 1, 37(3) (with arts. 4, 9, 37(4), 51, Sch. 9)
- C89
Sch. A1 excluded (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 26(3) (with arts. 26(4), 49, Sch. 15)
- C90
Sch. A1 excluded (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), arts. 1, 28(3) (with art. 40, Sch. 13)
- C91
Sch. A1 excluded (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 31(3) (with art. 31(4), Sch. 12)
- C92
Sch. A1 excluded (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), arts. 1, 25(3) (with art. 25(4), Sch. 9)
- C93
Sch. A1 excluded (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 27(3) (with arts. 39, 40, Sch. 9)
- C94
Sch. A1 excluded (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 36(3) (with arts. 36(4), 40, 45, Sch. 9)
- C95
Sch. A1 excluded (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), arts. 1(2), 24(3) (with arts. 24(4), 42, 43, Sch. 18)
- C96
Sch. A1 excluded (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), arts. 1, 26(3) (with Sch. 14)
- C97
Sch. A1 excluded (30.4.2026) by The Springwell Solar Farm Order 2026 (S.I. 2026/419), arts. 1, 26(3) (with arts. 26(4), 48)
- C98
Sch. A1 excluded (5.6.2026) by The Dogger Bank South East and West Offshore Wind Farms Order 2026 (S.I. 2026/577), arts. 1, 26(4) (with arts. 26(5), 40, 41, Sch. 15)
- C99
Sch. A1 excluded (5.6.2026) by The North Falls Offshore Wind Farm Order 2026 (S.I. 2026/567), arts. 1, 27(3) (with arts. 44, 45, Sch. 14)
- C100
Sch. A1 excluded (23.7.2026) by The Peartree Hill Solar Farm Order 2026 (S.I. 2026/869), arts. 1, 28(3) (with art. 37, Sch. 11)
- C101
Sch. A1 excluded (24.7.2026) by The Dean Moor Solar Farm Order 2026 (S.I. 2026/754), arts. 1, 28(3) (with Sch. 13)
- C102
Sch. A1 excluded (30.7.2026) by The One Earth Solar Farm Order 2026 (S.I. 2026/934), arts. 1, 25(3) (with arts. 25(4), 47)
- C103
Sch. A1 excluded (14.9.2026) by The Beacon Fen Energy Park Order 2026 (S.I. 2026/1025), arts. 1, 30(3) (with arts. 30(4), 39, Sch. 11 para. 131)
- C104
Sch. A1 excluded (30.10.2026) by The Green Hill Solar Farm Order 2026 (S.I. 2026/1074), arts. 1, 29(3) (with art. 29(4), Sch. 15)
- C105
Sch. A1 excluded (31.10.2026) by The Steeple Renewables Project Order 2026 (S.I. 2026/1086), arts. 1, 23(3) (with art. 23(4), Sch. 10)