Land Compensation Act 1973 in Scotland
1973 c. 26 · Enacted 23 May 1973 · Extends to United Kingdom
An Act to confer a new right to compensation for depreciation of the value of interests in land caused by the use of highways, aerodromes and other public works; to confer powers for mitigating the injurious effect of such works on their surroundings; to make new provision for the benefit of persons displaced from land by public authorities; to amend the law relating to compulsory purchase and planning blight; to amend section 35 of the Roads (Scotland) Act 1970; and for purposes connected with those matters.
[23rd May 1973]I1C1C2C3C4C5C6C7C8C9C10C11C12C13C14C15C16C17C18C19C20C21C22C23C24C25C26C27C28C29C30C31C32C33C34C35C36C37C38C39C40C41C42C43C44C45C46C47C48C49C50C51C52C53C54C55C56C57C58C59C60C61C62C63C64C65C66C67C68C69C70C71C72C73C74C75C76C77C78C79C80C81C82C83C84C85C86C87C88C89C90C91C92C93C94C95C96C97C98C99C100C101C102C103C104C105C106C107C108C109C110C111C112C113C114C115C116C117C118C119C120C121C122C123C124C125C126C127C128C129C130C131C132C133C134C135C136C137C138C139C140C141C142C143C144C145C146C147C148C149C150C151C152C153C154C155C156C157C158C159C160C161C162C163C164C165C166C167C168C169C170C171C172C173C174C175C176C177C178C179C180C181C182C183C184C185C186C187C188C189C190C191C192C193C194C195C196C197C198C199C200C201C202C203C204C205C206C207C208C209C210C211C212
Annotations to the whole text
Modifications
- C1
Act applied (with modifications) (7.3.1995) by S.I. 1995/519, art. 23(3), Sch. 4 paras. 1, 2 (with art. 73)
Act applied (with modifications) (18.12.1996) by 1996 c. 61, s. 4, Sch. 4 Pt. III paras. 8(2)(a), 9(9)(10)
Act applied (with modifications) (10.2.1997) by S.I. 1997/264, art. 19(3), Sch. 7 paras. 1, 2
Act applied (with modifications) (21.5.1997) by S.I. 1997/1266, art. 26(3), Sch. 8 paras. 1, 2 (with art. 41)
Act applied (with modifications) (3.6.1999) by S.I. 1999/1555, art. 5(4), Sch. 1 paras. 1, 2
Act: transfer of functions (1.7.1999) by S.I. 1999/672, art. 2, Sch. 1
Act applied (with modifications) (20.1.1999) by S.I. 1999/2336, art. 14, Sch. 4 paras. 1, 2
Act applied (with modifications) (23.8.1999) by S.I. 1999/2981, art. 17(3), Sch. 7 paras. 1, 2
Act applied (with modifications) (2.3.2001) by S.I. 2001/1367, art. 9(3), Sch. 2 paras. 1, 2
Act applied (with modifications) (2.3.2001) by S.I. 2001/1368, art. 9(3), Sch. 3 paras. 1, 2
Act applied (with modifications) (2.3.2001) by S.I. 2001/1369, art. 6(3), Sch. 1 paras. 1, 2
Act applied (with modifications) (29.3.2001) by S.I. 2001/1347, art. 26(3), Sch. 7 paras. 1, 2
Act applied (with modifications) (29.3.2001) by S.I. 2001/1348, art. 6(3), Sch. 2 paras. 1, 2
Act applied (with modifications) (18.7.2001) by S.I. 2001/2870, art. 15(7), Sch. 2 paras. 1, 2
Act applied (with modifications) (9.11.2001) by S.I. 2001/3682, art. 21(3), Sch. 7 paras. 1, 2
Act applied (with modifications) (30.4.2002) by S.I. 2002/1064, art. 11, Sch. 2 para. 2
Act applied (with modifications) (30.4.2002) by S.I. 2002/1065, art. 11, Sch. 3 para. 2
Act applied (with modifications) (14.3.2002) by S.I. 2002/412, art. 18, Sch. 4 para. 2
Act applied (with modifications) (31.5.2002) by S.I. 2002/1327, art. 21, Sch. 4 para. 2
Act applied (with modifications) (30.4.2002) by S.I. 2002/1066, art. 23, Sch. 7 para. 2
- C2
Act modified (28.4.2003) by Network Rail (West Coast Main Line) Order 2003 (S.I. 2003/1075), art. 1, Sch. 9 para. 2 (with art. 40)
- C3
Act applied (with modifications) (4.3.2004) by The Network Rail (West Coast Main Line) Order 2004 (S.I. 2004/389), Sch. 9 paras. 1, 2 (with art. 38)
- C4
Act applied (with modifications) (2.4.2004) by Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), Sch. 8 paras. 1, 2
- C5
Act applied (with modifications) (19.11.2004) by Scarweather Sands Offshore Wind Farm Order 2004 (S.I. 2004/3054), Sch. 3 para. 2 (with art. 38)
- C6
Act applied (with modifications) (28.1.2005) by East Midlands Parkway Station (Land Acquisition) Order 2005 (S.I. 2005/8), Sch. 1 para. 2
- C7
Act applied (with modifications) (11.2.2005) by Merseytram (Liverpool City Centre to Kirkby) Order 2005 (S.I. 2005/120), Sch. 7 para. 2 (with arts. 65, 66)
- C8
Act modified (22.3.2005) by Midland Metro (Wednesbury to Brierley Hill and Miscellaneous Amendments) Order 2005 (S.I. 2005/927), Sch. 7 para. 2 (with art. 51)
- C9
Act modified (4.5.2005) by The Telford Railfreight Terminal (Donnington) Order 2005 (S.I. 2005/1163), Sch. 6 para. 2
- C10
Act applied (with modifications) (3.8.2005) by The Greater Manchester (Leigh Busway) Order 2005 (S.I. 2005/1918), Sch. 7 para. 2
- C11
Act applied (with modifications) (25.11.2005) by Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), Sch. 7 paras. 1, 2 (with arts. 3(5), 15(3))
- C12
Act applied (with modifications) (11.1.2006) by The Cambridgeshire Guided Busway Order 2005 (S.I. 2005/3523), Sch. 7 paras. 1, 2 (with art. 52)
- C13
Act modified (14.9.2006) by The Borough of Poole (Poole Harbour Opening Bridges) Order 2006 (S.I. 2006/2310), Sch. 3 para. 2 (with art. 40, Sch. 7 para. 12)
- C14
Act applied (with modifications) (22.11.2006) by Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), Sch. 8 paras. 1, 2 (with art. 43)
- C15
Act modified (13.12.2006) by The Network Rail (Thameslink 2000) Order 2006 (S.I. 2006/3117), Sch. 7 para. 2 (with arts. 34, 35(2))
- C16
Act modified (13.12.2006) by Luton Dunstable Translink Order 2006 (S.I. 2006/3118), Sch. 7 para. 2
- C17
Act modified (19.3.2007) by Ouseburn Barrage Order 2007 (S.I. 2007/608), Sch. 4 para. 2 (with arts. 46-48, Sch. 6 para. 23)
- C18
Act modified (23.8.2007) by Docklands Light Railway (Capacity Enhancement andd 2012 Games Preparation) Order 2007 (S.I. 2007/2297), Sch. 6 para. 2 (with arts. 3(6), 12(3))
- C19
Act modified (17.12.2007) by Felixstowe Dock and Railway Company (Land Acquisition) Order 2007 (S.I. 2007/3345), Sch. 1 para. 2
- C20
Act applied (with modifications) (21.5.2008) by Teesport (Land Acquisition) Order 2008 (S.I. 2008/1238), Sch. 1 para. 2
- C21
Act applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 6 paras. 6(2), 7
- C22
Act modified (14.10.2008) by Felixstowe Branch Line and Ipswich Yard Improvement Order 2008 (S.I. 2008/2512), Sch. 6 para. 2 (with art. 36(3))
- C23
Act modified (9.6.2009) by Nottingham Express Transit System Order 2009 (S.I. 2009/1300), Sch. 7 para. 2 (with Sch. 13 para. 14(2), 14 para. 19)
- C24
Act modified (18.9.2009) by London Underground (Victoria Station Upgrade) Order 2009 (S.I. 2009/2364), Sch. 5 para. 2
- C25
Act modified (28.10.2009) by Network Rail (Reading) (Land Acquisition) Order 2009 (S.I. 2009/2728), Sch. 2 para. 2
- C26
Act modified (20.7.2010) by The Network Rail (Nuneaton North Chord) Order 2010 (S.I. 2010/1721), Sch. 6 para. 2
- C27
Act modified (1.2.2011) by The River Mersey (Mersey Gateway Bridge) Order 2011 (S.I. 2011/41), Sch. 6 para. 2 (with art. 51, Sch. 10 paras. 68, 85)
- C28
Act modified (21.4.2011) by The Network Rail (Hitchin (Cambridge Junction)) Order 2011 (S.I. 2011/1072), Sch. 8 para. 2
- C29
Act modified (7.8.2012) by The Ipswich Barrier Order 2012 (S.I. 2012/1867), Sch. 3 para. 2 (with arts. 46-48, Sch. 8 para. 18)
- C30
Act modified (12.8.2012) by The Hinkley Point (Temporary Jetty) (Land Acquisition) Order 2012 (S.I. 2012/1924), Sch. 1 para. 2
- C31
Act modified (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), Sch. 5 para. 2 (with art. 26(2))
- C32
Act modified (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), Sch. 9 para. 2(1) (with art. 35(2))
- C33
Act modified (13.11.2012) by The Chiltern Railways (Bicester to Oxford Improvements) Order 2012 (S.I. 2012/2679), Sch. 10 para. 2 (with art. 42(2))
- C34
Act applied (with modifications) (9.4.2013) by The Hinkley Point C (Nuclear Generating Station) Order 2013 (S.I. 2013/648), Sch. 11 para. 2 (with arts. 48, 68, 79, 83)
- C35
Act applied (with modifications) (16.4.2013) by The Network Rail (Pont Briwet) (Land Acquisition) Order 2013 (S.I. 2013/767), Sch. 1 para. 2(2) (with arts. 20, 21)
- C36
Act applied (with modifications) (21.8.2013) by The Croxley Rail Link Order 2013 (S.I. 2013/1967), Sch. 5 para. 2
- C37
Act modified (22.8.2013) by The Leeds Railway Station (Southern Entrance) Order 2013 (S.I. 2013/1933), Sch. 8 para. 2
- C38
Act modified (6.11.2013) by The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013 (S.I. 2013/2587), Sch. 5 para. 2 (with arts. 42, 43)
- C39
Act modified (20.11.2013) by The M1 Junction 10a (Grade Separation) Order 2013 (S.I. 2013/2808), Sch. 9 para. 2
- C40
Act modified (21.11.2013) by The Network Rail (Redditch Branch Enhancement) Order 2013 (S.I. 2013/2809), Sch. 7 para. 2 (with arts. 27(2), 39, Sch. 10 para. 4)
- C41
Act modified (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), Sch. 3 para. 2
- C42
Act modified (9.1.2014) by The Ashton Vale to Temple Meads and Bristol City Centre Rapid Transit Order 2013 (S.I. 2013/3244), Sch. 6 para. 2 (with arts. 57, 58, Sch. 11 para. 19)
- C43
Act modified (11.3.2014) by The Crossrail (Paddington Station Bakerloo Line Connection) Order 2014 (S.I. 2014/310), Sch. 3 para. 2
- C44
Act modified (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), Sch. 8 para. 2 (with art. 34(2))
- C45
Act modified (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), Sch. 10 para. 2
- C46
Act applied (with modifications) (7.7.2014) by The East Anglia ONE Offshore Wind Farm Order 2014 (S.I. 2014/1599), art. 17(4), Sch. 7 para. 2 (with arts. 37, 38, Sch. 9 para. 19)
- C47
Act applied (with modifications) (6.8.2014) by The Rampion Offshore Wind Farm Order 2014 (S.I. 2014/1873), Sch. 8 para. 2 (with arts. 12, 13, Pt. 2 para. 6, 3 para. 5, 4 para. 4, 5 para. 4, Sch. 12 para. 19)
- C48
Act applied (with modifications) (19.8.2014) by The Network Rail (Huyton) Order 2014 (S.I. 2014/2027), Sch. 5 para. 2 (with art. 31(2))
- C49
Act applied (with modifications) (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), Sch. 6 para. 2
- C50
Act modified (28.11.2014) by The Walney Extension Offshore Wind Farm Order 2014 (S.I. 2014/2950), Sch. 7 para. 2 (with arts. 38, 39)
- C51
Act modified (15.12.2014) by The London Underground (Northern Line Extension) Order 2014 (S.I. 2014/3102), Sch. 3 para. 2 (with Sch. 8 para. 45)
- C52
Act modified (31.12.2014) by The Hornsea One Offshore Wind Farm Order 2014 (S.I. 2014/3331), Sch. 6 para. 2 (with arts. 37, 38)
- C53
Act applied (with modifications) (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), Sch. 7 para. 2
- C54
Act modified (2.2.2015) by The Northumberland County Council (A1 – South East Northumberland Link Road (Morpeth Northern Bypass)) Development Consent Order 2015 (S.I. 2015/23), Sch. 11 para. 2
- C55
Act modified (25.2.2015) by The A160/A180 (Port of Immingham Improvement) Development Consent Order 2015 (S.I. 2015/129), Sch. 6 para. 2
- C56
Act modified (11.3.2015) by The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (S.I. 2015/318), Sch. 6 para. 2(1) (with arts. 40, 41, Pt. 2 para. 4(2), (3), 19, 4 para. 3, 4, 16, Sch. 12 paras. 4, 9(2), 10)
- C57
Act modified (1.4.2015) by The Knottingley Power Plant Order 2015 (S.I. 2015/680), Sch. 6 para. 2 (with Sch. 8 para. 10)
- C58
Act applied (with modifications) (21.4.2015) by The Network Rail (Ordsall Chord) Order 2015 (S.I. 2015/780), Sch. 9 para. 2 (with art. 36(2))
- C59
Act applied (with modifications) (21.4.2015) by The Crossrail (Plumstead Sidings) Order 2015 (S.I. 2015/781), Sch. 2 para. 2
- C60
Act applied (with modifications) (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), Sch. 11 para. 2
- C61
Act applied (with modifications) (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), Sch. 5 para. 2 (with arts. 51, 53)
- C62
Act applied (with modifications) (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), Sch. 7 para. 2
- C63
Act applied (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), Sch. 5 para. 2 (with arts. 20(6), 30)
- C64
Act modified (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), Sch. 6 para. 2 (with arts. 40, 41)
- C65
Act applied (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), Sch. 1 para. 2
- C66
Act applied (with modifications) (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), Sch. 4 para. 2
- C67
Act modified (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), Sch. 3 para. 2 (with art. 26, Sch. 3 para. 1)
- C68
Act modified (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), Sch. 6 para. 2
- C69
Act applied (with modifications) (2.2.2016) by The East Midlands Gateway Rail Freight Interchange and Highway Order 2016 (S.I. 2016/17), Sch. 14 para. 2
- C70
Act modified (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), art. 22, Sch. 10 para. 2 (with art. 32)
- C71
Act applied (with modifications) (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), Sch. 6 para. 2 (with art. 37)
- C72
Act applied (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), Sch. 6 para. 2 (with art. 39)
- C73
Act modified (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), Sch. 6 para. 2 (with arts. 4, 5(3))
- C74
Act applied (with modifications) (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), Sch. 2 para. 2 (with art. 39)
- C75
Act applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), Sch. 5 para. 2 (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
- C76
Act applied (with modifications) (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), arts. 1, 8, 18(3), Sch. 3 para. 2
- C77
Act applied (with modifications) (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), Sch. 3 para. 2 (with arts. 35, 36)
- C78
Act applied (with modifications) (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), Sch. 7 para. 2 (with art. 35)
- C79
Act applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), Sch. 6 para. 2 (with arts. 37, 38)
- C80
Act applied (with modifications) (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), Sch. 11 para. 2 (with art. 43)
- C81
Act applied (with modifications) (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), Sch. 6 para. 2
- C82
Act applied (with modifications) (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), Sch. 6 para. 2 (with arts. 39, 40, Sch. 8 para. 19)
- C83
Act applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), Sch. 5 para. 2 (with arts. 43, 44)
- C84
Act applied (with modifications) (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), Sch. 9 paras. 1, 2(9)
- C85
Act applied (with modifications) (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), Sch. 11 para. 2
- C86
Act applied (with modification) (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), Sch. 7 para. 2
- C87
Act modified (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), Sch. 10 para. 2 (with art. 22)
- C88
Act applied (with modifications) (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), Sch. 6 para. 2(1) (with arts. 36, 37, Sch. 8 para. 34)
- C89
Act applied (with modifications) (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), Sch. 3 para. 2 (with Sch. 8 para. 20)
- C90
Act applied (with modifications) (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), Sch. 7 paras. 1, 3 (with art. 32(2))
- C91
Act applied (with modifications) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), art. 1, Sch. 3 paras. 1, 2 (with arts. 55-57, Sch. 8 para. 13)
- C92
Act modified (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), Sch. 4 para. 3 (with arts. 58, 59)
- C93
Act modified (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), Sch. 6 para. 3 (with arts. 24(8), 33(2))
- C94
Act modified (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), Sch. 5 para. 3
- C95
Act modified (4.6.2018) by The Network Rail (Kings Mill No. 1 Level Crossing) (Land Acquisition and Closure) Order 2018 (S.I. 2018/571), Sch. 2 para. 3
- C96
Act modified (28.6.2018) by The High Speed Rail (London West Midlands) (Greatmoor Railway Sidings Etc.) Order 2018 (S.I. 2018/693), Sch. 6 para. 3
- C97
Act applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), Sch. 9 para. 3 (with art. 31(2))
- C98
Act applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), Sch. 8 para. 3
- C99
Act applied (with modifications) (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), Sch. 9 para. 2 (with arts. 6, 42)
- C100
Act modified (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), art. 1, Sch. 5 para. 3 (with arts. 55, 56)
- C101
Act modified (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), art. 1, Sch. 8 para. 2
- C102
Act applied (with modifications) (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 7, Sch. 2 para. 3 (with arts. 12, 18)
- C103
Act modified (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), art. 1, Sch. 8 para. 2
- C104
Act modified (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), art. 1, Sch. 9 para. 2
- C105
Act modified (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), art. 1, Sch. 12 para. 3 (with Sch. 13 Pt. 1 para. 19)
- C106
Act modified (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), art. 1, Sch. 13 para. 3 (with art. 37(2))
- C107
Act modified (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), art. 1, Sch. 6 para. 3 (with art. 3(1))
- C108
Act modified (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), , art. 1, Sch. 5 para. 3 (with arts. 47, 48, Sch. 10 para. 19)
- C109
Act modified (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), art. 1, Sch. 4 para. 2 (with art. 7)
- C110
Act modified (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), art. 1, Sch. 6 para. 3 (with arts. 5, 44)
- C111
Act applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), art. 1, Sch. 8 para. 2 (with art. 7)
- C112
Act modified (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), art. 1, Sch. 7 para. 3 (with arts. 51, 57)
- C113
Act modified (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), art. 1, Sch. 12 para. 3
- C114
Act modified (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), art. 1, Sch. 6 para. 3 (with arts. 5, 44)
- C115
Act modified (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), art. 1, Sch. 6 para. 2 (with art. 37)
- C116
Act modified (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), art. 1, Sch. 7 para. 2 (with arts. 41, 42, Sch. 16 para. 66)
- C117
Act modified (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), Sch. 7 para. 2 (with Sch. 9 para. 144)
- C118
Act modified (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), Sch. 7 para. 3
- C119
Act modified (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), Sch. 6 para. 3 (with art. 32, Sch. 9 para. 36)
- C120
Act modified (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), Sch. 14 para. 3
- C121
Act modified (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), Sch. 8 para. 3
- C122
Act modified (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), Sch. 7 para. 2 (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
- C123
Act modified (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), art. 1, Sch. 7 para. 3 (with art. 5, Sch. 27 para. 36)
- C124
Act applied (with modifications) (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 9 paras. 1, 2(10)
- C125
Act modified (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), Sch. 6 para. 3 (with arts. 4, 47)
- C126
Act modified (16.4.2021) by The Network Rail (Chart Leacon) Order 2021 (S.I. 2021/419), Sch. 1 para. 3
- C127
Act modified (1.9.2021) by The Network Rail (Teddington Station Access for All) Order 2021 (S.I. 2021/937), Sch. 5 para. 3
- C128
Act modified (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), art. 1, Sch. 7 para. 3 (with arts. 15, 50, Sch. 11 para. 29)
- C129
Act applied (with modifications) (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), art. 1, Sch. 7 para. 2 (with arts. 41, 42, Sch. 17 para. 66)
- C130
Act applied (with modifications) (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), art. 1, Sch. 7 para. 2 (with arts. 41, 42, Sch. 16)
- C131
Act applied (with modifications) (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), art. 1, Sch. 7 para. 3 (with Sch. 8 Pt. 6 para. 19)
- C132
Act modified (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), art. 1, Sch. 4 para. 3 (with art. 55)
- C133
Act applied (with modifications) (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 20(4), Sch. 8 para. 2 (with arts. 40, 41)
- C134
Act modified (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), art. 1(2), Sch. 8 para. 2 (with arts. 40, 41)
- C135
Act applied (with modifications) (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), art. 1, Sch. 6 para. 3
- C136
Act applied (with modifications) (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), art. 1, Sch. 6 para. 3 (with arts. 6, 34)
- C137
Act applied (with modifications) (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 28, Sch. 7 para. 3 (with arts. 5, 36)
- C138
Act applied (with modifications) (30.6.2022) by The Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (S.I. 2022/651), art. 1, Sch. 12 paras. 1, 3
- C139
Act applied (with modifications) (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 50)
- C140
Act applied (with modifications) (1.8.2022) by The Northumberland Line Order 2022 (S.I. 2022/820), art. 1, Sch. 6 para. 3 (with Sch. 10 paras. 21, 43)
- C141
Act applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order 2022 (S.I. 2022/871), art. 1, Sch. 1 para. 3
- C142
Act applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) (No. 2) Order 2022 (S.I. 2022/872), art. 1(1), Sch. 1 paras. 1, 3
- C143
Act applied (with modifications) (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), art. 1, Sch. 16 para. 2 (with arts. 62, 76, 87)
- C144
Act applied (with modifications) (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), art. 1, Sch. 6 para. 3 (with arts. 4, 53)
- C145
Act applied (with modifications) (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), art. 1, Sch. 6 paras. 1, 3
- C146
Act applied (with modifications) (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), art. 1, Sch. 6 paras. 1, 3 (with arts. 5, 40)
- C147
Act modified (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), art. 1, Sch. 12 para. 3
- C148
Act applied (with modifications) (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 52, Sch. 9 para. 82)
- C149
Act applied (with modifications) (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), art. 1, Sch. 11 para. 3 (with art. 51)
- C150
Act applied (with modifications) (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), art. 1, Sch. 6 paras. 1, 3 (with art. 5)
- C151
Act applied (with modifications) (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), art. 1, Sch. 6 paras. 1, 3 (with art. 4)
- C152
Act modified (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), art. 1, Sch. 7 para. 2 (with art. 32, Sch. 10 paras. 26(2), 68)
- C153
Act applied (with modifications) (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), art. 1, Sch. 10 paras. 1, 3 (with art. 34(2), Sch. 12 paras. 5, 47, 79)
- C154
Act applied (with modifications) (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 50)
- C155
Act modified (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), art. 1, Sch. 10 paras. 1, 2 (with art. 19)
- C156
Act applied (with modifications) (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), art. 1, Sch. 7 paras. 1, 2 (with arts. 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt 9 para. 4)
- C157
Act applied (with modifications) (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), art. 1, Sch. 5 paras. 1, 3 (with arts. 6(2), 18, Sch. 11 paras. 5, 30)
- C158
Act applied (with modifications) (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))
- C159
Act applied (with modifications) (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), art. 1, Sch. 8 paras. 1-3 (with arts. 36, 37, Sch. 9 paras. 14, 44(1), 76, 103)
- C160
Act: power to amend conferred (26.12.2023) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 132, 255(3)(a) (with s. 247)
- C161
Act applied (with modifications) (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), art. 1, Sch. 9 paras. 1, 2 (with art. 43, Sch. 12 paras. 5, 24)
- C162
Act applied (with modifications) (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
- C163
Act applied (with modifications) (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), art. 1, Sch. 8 paras. 1, 2 (with arts. 42, 43, Sch. 12)
- C164
Act applied (with modifications) (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), art. 1, Sch. 9 paras. 1, 2 (with Sch. 11)
- C165
Act applied (with modifications) (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), art. 1, Sch. 5 paras. 1, 3 (with arts. 18, 35, Sch. 9)
- C166
Act applied (with modifications) (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), art. 1, Sch. 10 paras. 1, 2 (with art. 44, Sch. 15)
- C167
Act applied (with modifications) (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), art. 1(2), Sch. 9 paras. 1, 3 (with arts. 21, 41, Sch. 10)
- C168
Act applied (with modifications) (25.4.2024) by The Network Rail (Church Fenton Level Crossing Reduction) Order 2024 (S.I. 2024/526), art. 1, Sch. 10 paras. 1, 3
- C169
Act applied (with modifications) (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), art. 1, Sch. 8 paras. 1, 3 (with arts. 35, 36, Sch. 14)
- C170
Act applied (with modifications) (13.6.2024) by The Network Rail (Cambridge Re-Signalling) Order 2024 (S.I. 2024/724), art. 1, Sch. 5 paras. 1, 3 (with art. 13)
- C171
Act applied (with modifications) (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), art. 1, Sch. 7 paras. 1, 3 (with art. 6, Sch. 10)
- C172
Act applied (with modifications) (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), art. 1, Sch. 10 paras. 1, 2 (with art. 45, Sch. 14)
- C173
Act applied (with modifications) (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), art. 1, Sch. 9 paras. 1, 2 (with art. 44, Sch. 12)
- C174
Act applied (with modifications) (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), art. 1, Sch. 10 paras. 1, 2 (with Sch. 15)
- C175
Act applied (with modifications) (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), art. 1, Sch. 10 paras. 1, 2 (with art. 48, Sch. 15)
- C176
Act applied (with modifications) (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), art. 1, Sch. 9 paras. 1, 2 (with art. 40, Sch. 14)
- C177
Act applied (with modifications) (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), art. 1, Sch. 6 paras. 1, 3 (with art. 4, Sch. 10) (as amended by S.I. 2024/1020, Sch.)
Act applied (with modifications) (25.10.2024) by The Associated British Ports (Immingham Eastern Ro-Ro Terminal) Development Consent Order 2024 (S.I. 2024/1014), art. 1, Sch. 5 paras. 1, 3 (with arts. 36, 40, Sch. 4)
- C178
Act applied (with modifications) (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), art. 1, Sch. 11 paras. 1, 3 (with Sch. 15)
- C179
Act applied (with modifications) (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), art. 1, Sch. 10 paras. 1, 2 (with art. 47, Sch. 15)
- C180
Act applied (with modifications) (17.2.2025) by The Heckington Fen Solar Park Order 2025 (S.I. 2025/85), art. 1, Sch. 9 paras. 1, 2 (with art. 43, Sch. 13)
- C181
Act applied (with modifications) (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), art. 1, Sch. 11 paras. 1, 2 (with arts. 48, 59, Sch. 14)
- C182
Act applied (with modifications) (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), art. 1, Sch. 11 paras. 1, 2 (with Sch. 14)
- C183
Act applied (with modifications) (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), art. 1, Sch. 9 paras. 1, 3 (with arts. 5, 43, 53(7), 54(2), Sch. 14)
- C184
Act modified (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), art. 1, Sch. 13 para. 2 (with Sch. 13 para. 1)
- C185
Act modified (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), art. 1, Sch. 6 para. 2 (with Sch. 8 paras. 36(3), 87)
- C186
Act applied (with modifications) (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), art. 1, Sch. 8 paras. 1, 2 (with arts. 47, 48, Sch. 10)
- C187
Act applied (with modifications) (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), art. 1(2), Sch. 8 paras. 1, 3 (with art. 41, Sch. 9)
- C188
Act applied (with modifications) (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), art. 1, Sch. 10 paras. 1, 2 (with art. 49, Sch. 14)
- C189
Act applied (with modifications) (25.6.2025) by The M5 Junction 10 Development Consent Order 2025 (S.I. 2025/795), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 43, Sch. 9)
- C190
Act applied (with modifications) (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), art. 1, Sch. 7 paras. 1, 2 (with Sch. 10)
- C191
Act applied (with modifications) (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), art. 1, Sch. 9 paras. 1, 3 (with arts. 37, 38, Sch. 10)
- C192
Act applied (with modifications) (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), art. 1, Sch. 9 paras. 1, 2 (with art. 43, Sch. 11)
- C193
Act applied (with modifications) (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), art. 1, Sch. 6 paras. 1, 3 (with arts. 5, 34, Sch. 9)
- C194
Act applied (with modifications) (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), art. 1, Sch. 8 paras. 1, 2 (with arts. 5, 9(6), 43, Sch. 9)
- C195
Act applied (with modifications) (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), art. 1, Sch. 6 paras. 1, 3 (with arts. 4, 9, 51, Sch. 9)
- C196
Act applied (with modifications) (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), art. 1, Sch. 10 paras. 1, 2 (with art. 49, Sch. 15)
- C197
Act applied (with modifications) (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), art. 1, Sch. 11 paras. 1, 2 (with art. 40, Sch. 13)
- C198
Act applied (with modifications) (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), art. 1, Sch. 9 paras. 1, 2 (with Sch. 12)
- C199
Act applied (with modifications) (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), art. 1, Sch. 8 paras. 1, 2 (with Sch. 9)
- C200
Act applied (with modifications) (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), art. 1, Sch. 8 paras. 1, 3 (with arts. 39, 40, Sch. 9)
- C201
Act applied (with modifications) (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), art. 1, Sch. 7 paras. 1, 3 (with arts. 40, 45, Sch. 9) (which affecting provisions were superseded by S.I. 2026/537, art. 1, Sch. 7 paras. 1, 3 (with arts. 40, 45, Sch. 9))
- C202
Act applied (with modifications) (3.3.2026) by The Network Rail (Kettering to Wigston South Junction and Napsbury Lane) (Land Acquisition) Order 2026 (S.I. 2026/141), art. 1, Sch. 2 paras. 1, 3
- C203
Act applied (with modifications) (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), art. 1(2), Sch. 8 paras. 1, 2 (with arts. 42, 43, Sch. 18)
- C204
Act applied (with modifications) (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), art. 1, Sch. 10 paras. 1, 2 (with Sch. 14)
- C205
Act applied (with modifications) (30.4.2026) by The Springwell Solar Farm Order 2026 (S.I. 2026/419), art. 1, Sch. 10 paras. 1, 2 (with art. 48)
- C206
Act applied (with modifications) (5.6.2026) by The Dogger Bank South East and West Offshore Wind Farms Order 2026 (S.I. 2026/577), art. 1, Sch. 8 paras. 1, 3 (with arts. 40, 41, Sch. 15)
- C207
Act applied (with modifications) (5.6.2026) by The North Falls Offshore Wind Farm Order 2026 (S.I. 2026/567), art. 1, Sch. 6 paras. 1, 3 (with arts. 44, 45, Sch. 14)
- C208
Act applied (with modifications) (24.6.2026) by The Network Rail (Old Oak Common Great Western Mainline Track Access) Order 2026 (S.I. 2026/591), art. 1, Sch. 3 paras. 1, 3 (with art. 10)
- C209
Act applied (with modifications) (23.7.2026) by The Peartree Hill Solar Farm Order 2026 (S.I. 2026/869), art. 1, Sch. 9 paras. 1, 2 (with art. 37, Sch. 11)
- C210
Act applied (with modifications) (24.7.2026) by The Dean Moor Solar Farm Order 2026 (S.I. 2026/754), art. 1, Sch. 10 paras. 1, 2 (with Sch. 13)
- C211
Act applied (with modifications) (30.7.2026) by The One Earth Solar Farm Order 2026 (S.I. 2026/934), art. 1, Sch. 9 paras. 1, 2 (with art. 47)
- C212
Act applied (with modifications) (14.9.2026) by The Beacon Fen Energy Park Order 2026 (S.I. 2026/1025), art. 1, Sch. 9 paras. 1, 2 (with art. 39, Sch. 11 para. 131)
Commencement
- I1
Act partly in force at Royal Assent, Act wholly in force at 23.6.1973 see s. 89(2)
Contents
- 1Right to compensation.
- 2Interests qualifying for compensation.
- 4Assessment of compensation: general provisions.
- 7Exclusion of minimal compensation.
- 9Alterations to public works and changes of use.
- 11Interests acquired by inheritance.
- 12Tenants entitled to enfranchisement or extension under Leasehold Reform Act 1967.
- 14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repealed
- 15Information for ascertaining relevant date.
- 17Action for nuisance following unsuccessful claim where responsible authority have disclaimed statutory immunity.
- 18Interest on compensation.
- 20Soundproofing of buildings affected by public works.
- 20APower to make payments in respect of caravans and other structures affected by noise of public works.
- 21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repealed
- 22—25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repealed
- Powers of authorities responsible for other public works
- 27Execution of works etc. in connection with public works.
- Expenses of persons moving temporarily during construction works etc.
- 28Power to pay expenses of persons moving temporarily during construction works etc.
- 31. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repealed
- 32AHome loss payments: exclusions
- 33BOccupier’s loss payment: agricultural land
- 33COccupier’s loss payment: other land
- 33EClaims
- 33FInsolvency
- 33GDeath
- 33JAcquisition by agreement
- 33KRegulations
- Farm loss payments
- 35Amount of farm loss payment. Repealed
- 36Supplementary provisions about farm loss payments. Repealed
- Disturbance payments
- Rehousing
- 40Duty to rehouse certain caravan dwellers.
- 41Power of relevant authority to make advances repayable on maturity to displaced residential owner-occupiers.
- 42Duty of displacing authority to indemnify rehousing or lending authority for net losses.
- 43Power of relevant authority to defray expenses in connection with acquisition of new dwellings.
- 52BInterest on advance payments of compensation paid late
- Severance of land
- 53Notice to treat in respect of part of agricultural land.
- 55Notice of entry in respect of part of agricultural holding.
- Miscellaneous
- 60. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repealed
- 62. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repealed
- 63Interest on compensation for injurious affection where no land taken.
- 64Extension of grounds for challenging validity of compulsory purchase order. Repealed
- 65—67. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Repealed
- Part VI: Supplementary Provisions
- 84AService of documents
- 86Repeals.
- Schedule 3REPEALS
1Right to compensation.
Where the value of an interest in land is depreciated by physical factors caused by the use of public works, then, if—
the interest qualifies for compensation under this Part of this Act; and
the person entitled to the interest makes a claim F1after the time provided by and otherwise in accordance with this Part of this Act,
compensation for that depreciation shall, subject to the provisions of this Part of this Act, be payable by the responsible authority to the person making the claim (hereafter referred to as “the claimant”).
The physical factors mentioned in subsection (1) above are noise, vibration, smell, fumes, smoke and artificial lighting and the discharge on to the land in respect of which the claim is made of any solid or liquid substance.
The public works mentioned in subsection (1) above are—
any highway;
any aerodrome; and
any works or land (not being a highway or aerodrome) provided or used in the exercise of statutory powers.
The responsible authority mentioned in subsection (1) above is, in relation to a highway, the appropriate highway authority and, in relation to other public works, the person managing those works.
Physical factors caused by an aircraft arriving at or departing from an aerodrome shall be treated as caused by the use of the aerodrome whether or not the aircraft is within the boundaries of the aerodrome; but, save as aforesaid, the source of the physical factors must be situated on or in the public works the use of which is alleged to be their cause.
Compensation shall not be payable under this Part of this Act in respect of the physical factors caused by the use of any public works other than a highway unless immunity from actions for nuisance in respect of that use is conferred (whether expressly or by implication) by an enactment relating to those works or, in the case of an aerodrome and physical factors caused by aircraft, the aerodrome is one to which F2section 77(2) of the Civil Aviation Act 1982(immunity from actions for nuisance) for the time being applies.
Compensation shall not be payable under this Part of this Act in respect of physical factors caused by accidents involving vehicles on a highway or accidents involving aircraft.
Compensation shall not be payable under this Part of this Act on any claim unless the relevant date in relation to the claim falls on or after 17th October 1969.
Subject to section 9 below, “the relevant date” in this Part of this Act means—
in relation to a claim in respect of a highway, the date on which it was first open to public traffic;
in relation to a claim in respect of other public works, the date on which they were first used after completion.
2Interests qualifying for compensation.
An interest qualifies for compensation under this Part of this Act if it was acquired by the claimant before the relevant date in relation to the claim and the requirements of subsection (2) or, as the case may be, subsection (3) below are satisfied on the date on which notice of the claim for compensation in respect of that interest is served.
If and so far as the interest is in land which is a dwelling, the said requirements are—
that the interest is an owner’s interest; and
where the interest carries the right to occupy the land, that the land is occupied by the claimant in right of that interest as his residence.
If and so far as the interest is not in such land as aforesaid, the said requirements are—
that the interest is that of an owner-occupier; and
that the land is or forms part of either—
a hereditament the annual value of which does not exceed the prescribed amount; or
an agricultural unit.
In this section “owner’s interest” in relation to any land, means the legal fee simple therein or a tenancy thereof granted or extended for a term of years certain of which, on the date of service of the notice of claim in respect thereof, not less than three years remain unexpired.
In this section “owner-occupier”, in relation to land in a hereditament, means a person who occupies the whole or a substantial part of the land in right of an owner’s interest therein and, in relation to land in an agricultural unit, means a person who occupies the whole of that unit and is entitled, while so occupying it, to an owner’s interest in the whole or any part of that land.
In this section “the prescribed amount” means the amount for the time being prescribed for the purposes of F1section 149(3)(a) of the Town and Country Planning Act 1990(interests qualifying for protection under planning blight provisions) and “annual value” and “hereditament” have the meanings given in F2section 171 of that Act taking references to the date of service of a notice under F3section 150 of that Act as references to the date on which notice of the claim is served.
This section has effect subject to sections 10(4), 11 and 12 below.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F4
4Assessment of compensation: general provisions.
The compensations payable on any claim shall be assessed by reference to prices current on F1the first claim day.
In assessing depreciation due to the physical factors caused by the use of any public works, account shall be taken of the use of those works as it exists on the first claim day and of any intensification that may then be reasonably expected of the use of those works in the state in which they are on that date.
In assessing the extent of the depreciation there shall be taken into account the benefit of any relevant works—
which have been carried out, or in respect of which a grant has been paid, under section 20 below, section 15 of the Airports Authority Act 1965 F2, section 29A of the Civil Aviation Act 1971F3, section 79 of the Civil Aviation Act 1982or any corresponding local enactment F4or under any provision of a scheme operated by a person managing an aerodrome which provides for the payment of sound-proofing grants in respect of buildings near the aerodrome;
which have been carried out under section 23 or 27 below;
and it shall be assumed that any relevant works which could be or could have been carried out, or in respect of which a grant could be or could have been paid, under any of the provisions mentioned in paragraph (a) above have been carried out but, in a case where the authority having functions under that provision have a discretion whether or not to carry out the works or pay the grant, only if they have undertaken to do so.
F5In paragraph (a) above “sound-proofing grants”, in relation to any buildings, means grants towards the cost of insulating those buildings or parts of those buildings against noise.
The value of the interest in respect of which the claim is made shall be assessed—
subject to subsection (5) below, by reference to the nature of the interest and the condition of the land as it subsisted on the date of service of notice of the claim;
subject to section 5 below, in accordance with rules (2) to (4) of the rules set out in section 5 of the Land Compensation Act 1961;
if the interest is subject to a mortgage or to a contract of sale or to a contract made after the relevant date for the grant of a tenancy, as if it were not subject to the mortgage or contract.
In assessing the value of the interest in respect of which the claim is made there shall be left out of account any part of that value which is attributable to—
any building, or improvement or extension of a building, on the land if the building or, as the case may be, the building as improved or extended, was first occupied after the relevant date; and
any change in the use of the land made after that date.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F6
7Exclusion of minimal compensation.
Compensation shall not be payable on any claim unless the amount of the compensation exceeds £50.
9Alterations to public works and changes of use.
This section has effect where, whether before, on or after the commencement date—
the carriageway of a highway has been altered after the highway has been open to public traffic;
any public works other than a highway have been reconstructed, extended or otherwise altered after they have been first used; or
there has been a change of use in respect of any public works other than a highway or aerodrome.
If and so far as a claim in respect of the highway or other public works relates to depreciation that would not have been caused but for the alterations or change of use, this Part of this Act shall, subject to subsection (3) below, have effect in relation to the claim as if the relevant date (instead of being the date specified in section 1(9) above) were—
the date on which the highway was first open to public traffic after completion of the alterations to the carriageway;
the date on which the other public works were first used after completion of the alterations; or
the date of the change of use,
as the case may be.
Subsection (2) above shall not by virtue of any alterations to an aerodrome apply to a claim in respect of physical factors caused by aircraft unless the alterations are runway or apron alterations.
Where a claim relates to such depreciation as is mentioned in subsection (2) above the notice of claim shall specify, in addition to the matters mentioned in section 3 above, the alterations or change of use alleged to give rise to the depreciation; and if and so far as the claim relates to such depreciation—
section 6 above shall have effect as if the increase in value to be taken into account were any increase that would not have been caused but for the alterations or change of use in question;
subsection (1) of section 8 above shall not preclude the payment of compensation unless the previous claim was in respect of depreciation that would not have been caused but for the same alterations or change of use, and subsection (2) of that section shall not preclude the payment of compensation unless the works for which the land was acquired were works resulting from the alterations, or works used for the purpose, to which the claim relates.
For the purposes of this section the carriageway of a highway is altered if, and only if—
the location, width or level of the carriageway is altered (otherwise than by re-surfacing); or
an additional carriageway is provided for the highway beside, above or below an existing one;
and the reference in subsection (2) above to depreciation that would not have been caused but for alterations to the carriageway of a highway is a reference to such depreciation by physical factors which are caused by the use of, and the source of which is situated on, the length of carriageway which has been altered as mentioned in paragraph (a) above or, as the case may be, the additional carriageway and the corresponding length of the existing one mentioned in paragraph (b) above.
In this section “runway or apron alterations” means—
the construction of a new runway, the major re-alignment of an existing runway or the extension or strengthening of an existing runway; or
a substantial addition to, or alteration of, a taxiway or apron, being an addition or alteration whose purpose or main purpose is the provision of facilities for a greater number of aircraft.
For the avoidance of doubt it is hereby declared that references in this section to a change of use do not include references to the intensification of an existing use.
11Interests acquired by inheritance.
So much of section 2(1) above as requires an interest qualifying for compensation under this Part of this Act to have been acquired by the claimant before the relevant date shall not apply to any interest acquired by him by inheritance from a person who acquired that interest, or a greater interest out of which it is derived, before the relevant date.
For the purposes of this section an interest is acquired by a person by inheritance if it devolves on him by virtue only of testamentary dispositions taking effect on, or the law of intestate succession or the right of survivorship between joint tenants as applied to, the death of another person or the successive deaths or two or more other persons.
For the purposes of subsection (2) above a person who acquires an interest by appropriation of it in or towards satisfaction of any legacy, share in residue or other share in the estate of a deceased person shall be treated as a person on whom the interest devolves by direct bequest.
Where an interest is settled land for the purposes of the M1Settled Land Act 1925 and on the death of a tenant for life within the meaning of that Act a person becomes entitled to the interest in accordance with the settlement, or by any appropriation by the personal representatives in respect of the settled land, subsection (2) above shall apply as if the interest had belonged to the tenant for life absolutely and the trusts of the settlement taking effect after his death had been trusts of his will.
Subsection (4) above shall apply, with any necessary modifications, where a person becomes entitled to an interest on the termination of a settlement as it would apply if he had become entitled in accordance with the terms of the settlement.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F1
12Tenants entitled to enfranchisement or extension under Leasehold Reform Act 1967.
This section has effect where a person is entitled under Part I of the M1Leasehold Reform Act 1967 to acquire the freehold or an extended lease of a house by virtue of any tenancy (“the qualifying tenancy”) and—
has on or before the relevant date given notice under that Act to the landlord of his desire to have the freehold or an extended lease; and
has not acquired the freehold or an extended lease before that date.
The qualifying tenancy shall be treated as an owner’s interest as defined in section 2(4) above whether or not the unexpired term on the date of service of the notice of claim is of the length there specified.
If no claim is made in respect of the qualifying tenancy before the claimant has ceased to be entitled to it by reason of his acquisition of the freehold or an extended lease he may make a claim in respect of the qualifying tenancy as if he were still entitled to it.
No claim shall be made by virtue of subsection (3) above after the claimant has ceased to be entitled to the freehold or extended lease but such a claim may be made before F1the first claim day if it is made before the claimant has disposed of the freehold or extended lease and after he has made a contract for disposing of it.
Compensation shall not be payable before the first claim day on any claim made by virtue of subsection (4) above.
Any notice of a claim made by virtue of this section shall contain, in addition to the matters mentioned in section 3 above, a statement that it is made in respect of a qualifying tenancy as defined in this section and, if made by virtue of subsection (3) or (4) above, sufficient particulars to show that it falls within that subsection.
In relation to a claim made by virtue of subsection (3) above section 4(4)(a) above shall have effect as if the reference to the date of service of notice of the claim were a reference to the relevant date.
14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F1
15Information for ascertaining relevant date.
The responsible authority in relation to a highway or other public works shall keep a record and, on demand, furnish a statement in writing of—
the date on which the highway was first open to public traffic, or was first open to public traffic after completion of any particular alterations to the carriageway of the highway;
the date on which the public works were first used after completion, or were first used after completion of any particular alterations to those works;
in the case of public works other than a highway or aerodrome, the date on which there was a change of use in respect of the public works.
A certificate by the Secretary of State stating that runway or apron alterations have or have not been carried out at an aerodrome and the date on which an aerodrome at which any such alterations have been carried out was first used after completion of the alterations shall be conclusive evidence of the facts stated.
In this section references to alterations to the carriageway of a highway, to runway or apron alterations and to a change of use shall be construed in the same way as in section 9 above; and subsection (1) above shall not apply unless the date in question falls on or after the commencement date.
17Action for nuisance following unsuccessful claim where responsible authority have disclaimed statutory immunity.
Where, in resisting a claim under this Part of this Act, a responsible authority contend that no enactment relating to the works in question confers immunity from actions for nuisance in respect of the use to which the claim relates, then if—
compensation is not paid on the claim; and
an action for nuisance in respect of the matters which were the subject of the claim is subsequently brought by the claimant against the authority,
no enactment relating to those works, being an enactment in force when the contention was made, shall afford a defence to that action in so far as it relates to those matters.
18Interest on compensation.
Compensation under this Part of this Act shall carry interest, at the rate for the time being prescribed under section 32 of the M1Land Compensation Act 1961, from—
the date of service of the notice of claim; or
if that date is before F1the first claim day, from the first claim day,
until payment.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F2
20Soundproofing of buildings affected by public works.C1C2
The Secretary of State may make regulations imposing a duty or conferring a power on responsible authorities to insulate buildings against noise caused or expected to be caused by the construction or use of public works or to make grants in respect of the cost of such insulation.
Regulations under this section may—
make provision as to the level of noise giving rise to a duty or power under the regulations and the area in which a building must be situated if a duty or power is to arise in respect of it;
specify the classes of public works and of buildings in respect of which a duty or power is to arise, and the classes of persons entitled to make claims, under the regulations;
specify the nature and extent of the work which is to be undertaken under the regulations and the expenditure in respect of which and the rate at which grants are to be made under the regulations;
make the carrying out of work or the making of grants under the regulations dependent upon compliance with conditions;
make provision as to the funds out of which expenses incurred by responsible authorities under the regulations are to be defrayed;
make provision for the settlement of disputes arising under the regulations.
Without prejudice to the generality of paragraph (a) of subsection (2) above, regulations made by virtue of that paragraph may provide for the relevant level of noise or the relevant area in a particular case to be determined by reference to a document published by or on behalf of the Secretary of State or by any other authority or body or in such other manner as may be provided in the regulations.
If regulations under this section impose a duty or confer a power to carry out, or make a grant in respect of the cost of, work in respect of a building which is subject to a tenancy on a claim in that behalf made by the landlord or the tenant, provision may also be made by the regulations for enabling the work to be carried out notwithstanding the withholding of consent by the other party to the tenancy.
Regulations under this section may authorise or require local authorities to act as agents for responsible authorities in dealing with claims and in discharging or exercising the duties or powers of responsible authorities under the regulations, and may provide for the making by responsible authorities of payments to local authorities in respect of anything done by them as such agents.
Regulations under this section may authorise the council of a London borough to contribute towards expenses incurred under the regulations by a responsible authority in respect of the insulation of buildings against noise caused or expected to be caused by the use of any highway in that borough in relation to which an order has been made under section 6 of the M1Road Traffic Regulation Act 1967 F1or section 6 of the Road Traffic Regulation Act 1984 (traffic regulation orders in Greater London).
Regulations under this section may contain such supplementary provisions as appear to the Secretary of State to be necessary or expedient and may make different provision with respect to different areas or different circumstances.
The power to make regulations under this section shall be exercisable by statutory instrument.
A draft of any regulations under this section shall be laid before Parliament and the first regulations shall not be made unless the draft has been approved by a resolution of each House of Parliament.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F3
In this section “public works” and “responsible authority” have the same meaning as in section 1 above except that “public works” does not include an aerodrome and except that “responsible authority”, in relation to a highway, includes any authority having power to make an order in respect of that highway under section 1 or 6 of the M2Road Traffic Regulation Act F41984(traffic regulation orders).
20APower to make payments in respect of caravans and other structures affected by noise of public works.C1F1
The Secretary of State may make regulations empowering responsible authorities to make a payment, not exceeding an amount specified in the regulations, in respect of any dwelling which—
is not a building;
is occupied by a person as his only or main residence; and
is affected or likely to be affected by noise caused by the construction or use of public works.
Regulations under this section may—
make provision as to the level of noise giving rise to a power under the regulations and the area in which a dwelling must be situated if a power is to arise in respect of it;
specify the classes of public works and of dwellings in respect of which a power is to arise, and the classes of persons entitled to make claims, under the regulations; and
make provision as to the funds out of which expenses incurred by responsible authorities under the regulations are to be defrayed.
The power to make regulations under this section shall be exercisable by statutory instrument which shall be subject to annulment in pursuance of a resolution of either House of Parliament.
Subsections (3), (7) and (12) of section 20 above apply for the purposes of this section as they apply for the purposes of that.
21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F1
22—25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F1
27Execution of works etc. in connection with public works.
A responsible authority may carry out—
if they have power to acquire land under section 26 above, on any land acquired by them under that section;
on any other land belonging to them,
works for mitigating any adverse effect which the construction, alteration, existence or use of any public works has or will have on the surroundings of the works.
Without prejudice to the generality of subsection (1) above, the works that may be carried out under that subsection include the planting of trees, shrubs or plants of any other description and the laying out of any area as grassland.
A responsible authority may—
develop or redevelop any land acquired by them under section 26 above, or any other land belonging to them, for the purpose of improving the surroundings of public works in any manner which they think desirable by reason of the construction, alteration, existence or use of the works;
dispose of any land acquired by them under section 26 above.
This section applies only where the responsible authority are a body incorporated by or under any enactment and has effect only for extending the corporate powers of any such authority.
In this section “public works” and “responsible authority” have the same meaning as in section 1 above except that “public works” does not include a highway F1
28Power to pay expenses of persons moving temporarily during construction works etc.C1C2C3C4C5
This section has effect where works are carried out—
by a highway authority for the construction or improvement of a highway; or
by a responsible authority for the construction or alteration of any public works other than a highway,
and the carrying out of those works affects the enjoyment of a dwelling adjacent to the site on which they are being carried out to such an extent that continued occupation of the dwelling is not reasonably practicable.
Subject to subsection (3) below, the highway authority or responsible authority, as the case may be, may pay any reasonable expenses incurred by the occupier of the dwelling in providing suitable alternative residential accommodation for himself and members of his household for the whole or any part of the period during which the works are being carried out.
No payment shall be made to any person under this section in respect of any expenses except in pursuance of an agreement made between that person and the authority concerned before the expenses are incurred; and no payment shall be so made except in respect of the amount by which the expenses exceed those which that person would have incurred if the dwelling had continued to be occupied.
In this section “public works” and “responsible authority” have the same meaning as in section 1 above.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F1
31. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F1
32AHome loss payments: exclusionsF1
This section applies to a person if—
the person is displaced from a dwelling on land as mentioned in section 29(1)(a) (displacement in consequence of a compulsory acquisition),
a notice falling within subsection (4) has been served on the person in relation to the land,
at the relevant time the notice has effect or is operative, and
the person has failed to comply with any requirement of the notice.
This section also applies to a person if—
the person is displaced from a dwelling on land as mentioned in section 29(1)(a) (displacement in consequence of a compulsory acquisition),
a copy of an order falling within subsection (5) has been served on the person in relation to the land, and
the order has not been quashed on appeal.
No payment may be made under section 29 to a person to whom this section applies.
These are the notices—
a notice under section 215 of the Town and Country Planning Act 1990 (power to require proper maintenance of land);
a notice under section 11 of the Housing Act 2004 (improvement notice relating to category 1 hazard);
a notice under section 12 of that Act (improvement notice relating to category 2 hazard);
a notice under section 48 of the Planning (Listed Buildings and Conservation Areas) Act 1990 or section 138 of the Historic Environment (Wales) Act 2023 (asc 3) (repairs notice prior to notice of compulsory acquisition of listed building).
These are the orders—
an order under section 20 of the Housing Act 2004 (prohibition order relating to category 1 hazard);
an order under section 21 of that Act (prohibition order relating to category 2 hazard);
an order under section 43 of that Act (emergency prohibition orders);
an order under section 265 of the Housing Act 1985 (demolition order relating to category 1 or 2 hazard).
For the purposes of subsection (1)(c), the relevant time is the date on which any of the following occurs—
in the case of a compulsory acquisition which is to be authorised by a compulsory purchase order to which the Acquisition of Land Act 1981 applies—
the compulsory purchase order is confirmed, other than conditionally, under section 13 or 13A of the Acquisition of Land Act 1981;
the compulsory purchase order is made, other than conditionally, under paragraph 4 or 4A of Schedule 1 to that Act;
a decision is made under section 13BA(2)(a) of that Act (decision that conditions subject to which order was confirmed have been met);
a decision is made under paragraph 4AA(2)(a) of Schedule 1 to that Act (decision that conditions subject to which order was made have been met);
in the case of a compulsory acquisition which is to be authorised by any other order, the order is made or confirmed in accordance with the procedures which apply by virtue of the Act under which it is made;
in the case of a compulsory acquisition which does not fall within paragraph (a) or (b) and which is deemed to be authorised following service of a notice by the owner requiring the purchase of their interest, a notice to treat is deemed to have been served;
in the case of a compulsory acquisition which does not fall within paragraph (a), (b) or (c) and which is to be authorised by a special enactment, the enactment is passed.
In subsection (6), references to a compulsory acquisition are to the compulsory acquisition in consequence of which the person is displaced.
The appropriate national authority may by regulations amend subsections (4) and (5).
In this section—
“appropriate national authority” means—
- (a)
the Secretary of State, in relation to England;
- (b)
the Welsh Ministers, in relation to Wales;
- (a)
“special enactment” means—
- (a)
a local or private Act which authorises the compulsory acquisition of land specifically identified in that Act, or
- (b)
a provision which—
- (i)
is contained in an Act other than a local or private Act, and
- (ii)
authorises the compulsory acquisition of land specifically identified in that Act.
- (i)
- (a)
The power to make regulations under subsection (8) must be exercised by statutory instrument subject to annulment in pursuance of a resolution of—
either House of Parliament, in the case of regulations made by the Secretary of State;
Senedd Cymru, in the case of regulations made by the Welsh Ministers.
33BOccupier’s loss payment: agricultural landF1
This section applies to a person if—
he has a qualifying interest in land for the purposes of section 33A,
the land is agricultural land,
the interest is acquired compulsorily, and
he occupied the land for the period specified in section 33A(4).
In a case where the qualifying interest is in land in England, a person to whom this section applies is entitled to a payment of whichever is the greatest of the following amounts—
7.5% of the value of the interest;
the land amount;
the buildings amount.
But the maximum amount which may be paid to a person under subsection (1A) in respect of an interest in land is £75,000.
F3In a case where the qualifying interest is in land in Wales, a person to whom this section applies is entitled to a payment of whichever is the greatest of the following amounts—
2.5% of the value of his interest;
the land amount;
the buildings amount.
But the maximum amount which may be paid to a person under F4subsection (2) in respect of an interest in land is £25,000.
A payment under this section must be made by the acquiring authority.
The value of an interest is its value for the purpose of deciding the amount of compensation payable in respect of the acquisition F5(including in accordance with section 14A of the Land Compensation Act 1961 (cases where prospect of planning permission to be ignored)); but this is subject to subsections (6) and (7).
If an interest consists partly of a dwelling in respect of which the person is entitled to a home loss payment the value of the interest is the value of the whole interest less the value of so much of the interest as is represented by the dwelling.
If rule (5) of section 5 of the Land Compensation Act 1961 (equivalent reinstatement) applies for the purpose of assessing the amount of compensation the value of the interest is nil.
In the case of land in England, the land amount is the greater of £900 and the amount found in accordance with the following Table—
| Area of the land | Amount per hectare |
|---|---|
| Not exceeding 100 hectares | £300 per hectare or part of a hectare |
| Exceeding 100 hectares |
|
F7In the case of land in Wales, the land amount is the greater of £300 and the amount found in accordance with the following Table—
| Area of the land | Amount per hectare |
|---|---|
| Not exceeding 100 hectares | £100 per hectare or part of a hectare |
| Exceeding 100 hectares | (a) £100 per hectare for the first 100 hectares; (b) £50 per hectare for the next 300 hectares or part of a hectare. |
In the case of land in England, the buildings amount is £75 per square metre (or part of a square metre) of the gross floor space of any buildings on the land.
F9In the case of land in Wales the buildings amount is £25 per square metre (or part of a square metre) of the gross floor space of any buildings on the land.
The gross floor space must be measured externally.
33COccupier’s loss payment: other landF1
This section applies to a person if—
he has a qualifying interest in land for the purposes of section 33A,
the land is not agricultural land,
the interest is acquired compulsorily, and
he occupied the land for the period specified in section 33A(4).
In a case where the qualifying interest is in land in England, a person to whom this section applies is entitled to a payment of whichever is the greatest of the following amounts—
7.5% of the value of the interest;
the land amount;
the buildings amount.
But the maximum amount which may be paid to a person under subsection (1A) in respect of an interest in land is £75,000.
F3In a case where the qualifying interest is in land in Wales, a person to whom this section applies is entitled to a payment of whichever is the greatest of the following amounts—
2.5% of the value of his interest;
the land amount;
the buildings amount.
But the maximum amount which may be paid to a person under F4subsection (2) in respect of an interest in land is £25,000.
A payment under this section must be made by the acquiring authority.
The value of an interest is its value for the purpose of deciding the amount of compensation payable in respect of the acquisition F5(including in accordance with section 14A of the Land Compensation Act 1961 (cases where prospect of planning permission to be ignored)); but this is subject to subsections (6) and (7).
If an interest consists partly of a dwelling in respect of which the person is entitled to a home loss payment the value of the interest is the value of the whole interest less the value of so much of the interest as is represented by the dwelling.
If rule (5) of section 5 of the Land Compensation Act 1961 (equivalent reinstatement) applies for the purpose of assessing the amount of compensation the value of the interest is nil.
In the case of land in England, the land amount is the greater of—
£7,500;
£7.50 per square metre (or part of a square metre) of the area of the land.
But if only part of land in which a person has an interest is acquired, for the figure specified in subsection (7A)(a) there is substituted £900.
F7In the case of land in Wales, the land amount is the greater of—
£2,500;
£2.50 per square metre (or part of a square metre) of the area of the land.
But if only part of land in which a person has an interest is acquired, for the figure specified in subsection (8)(a) there is substituted £300.
In the case of land in England, the buildings amount is £75 per square metre (or part of a square metre) of the gross internal floor space of any buildings on the land.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
33EClaimsF1
This section applies for the purposes of sections 33A to 33C.
A claim for payment must be made in writing to the acquiring authority.
The claim must give such particulars as the authority may reasonably require for the purpose of deciding—
whether a payment is to be made;
the amount of any such payment.
For the purposes of the Limitation Act 1980 a person’s right of action to recover a payment must be taken to have accrued—
in the case of a claim under section 33A on the last day of the period specified in subsection (4) of that section;
in the case of a claim under section 33B or 33C on the date of his displacement from the land.
33FInsolvencyF1
This section applies if a person is entitled to a payment under section 33A, 33B or 33C but before a claim is made under section 33E insolvency proceedings are started in relation to the person.
Any of the following may make a claim instead of the person mentioned in subsection (1)—
a receiver, trustee in bankruptcy or the official receiver in the case of an individual;
an administrator, administrative receiver, liquidator or provisional liquidator or the official receiver in the case of a company or a partnership.
Insolvency proceedings are—
proceedings in bankruptcy;
proceedings under the Insolvency Act 1986 for the winding up of a company or an unregistered company (including voluntary winding up of a company under Part 4 of that Act);
proceedings for the winding up of a partnership.
33GDeathF1
This section applies if a person is entitled to a payment under section 33A, 33B or 33C but before a claim is made under section 33E the person dies (the deceased).
A claim may be made by a person who—
occupied the land for a period of not less than one year ending with the date on which the deceased is displaced from the land, and
is entitled to benefit on the death of the deceased by virtue of a ground mentioned in subsection (3).
The grounds are—
a testamentary disposition;
the law of intestate succession;
the right of survivorship between joint tenants.
33JAcquisition by agreementF1
This section applies if—
an interest in land which is a qualifying interest for the purpose of section 33A is acquired by agreement by an authority which has power to acquire the interest compulsorily, and
the interest is acquired from a person who would be entitled to a payment under section 33A, 33B or 33C if the interest is acquired compulsorily.
The authority may make a payment to the person of an amount equal to the amount they would be required to pay if the interest is acquired compulsorily.
33KRegulationsF1
This section applies for the purposes of sections 33A to 33I.
The Secretary of State may by regulations substitute for any amount or percentage figure specified in these sections such other amount or percentage figure (as the case may be) as he thinks fit.
Except as provided in the following provisions of this section, a power to make regulations must be exercised by statutory instrument subject to annulment in pursuance of a resolution of either House of Parliament.
This subsection applies to regulations under subsection (2) which substitute—
a percentage figure, or
an amount, in a case where the change in value condition is not satisfied.
A statutory instrument containing regulations to which subsection (4) applies must not be made unless a draft of the regulations has been laid before and approved by resolution of each House of Parliament.
The change in value condition is satisfied if the Secretary of State thinks that in the case of the substitution of an amount it is expedient to make the substitution in consequence of changes in the value of money or land.
Regulations under subsection (2) may make different provision for different purposes.
35Amount of farm loss payment.F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
36Supplementary provisions about farm loss payments.F1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
40Duty to rehouse certain caravan dwellers.C1
Section 39 above shall, so far as applicable, have effect in relation to a person residing in a caravan on a caravan site who is displaced from that site as it has effect in relation to a person displaced from residential accommodation on any land but shall so have effect subject to the following modifications.
Subsection (1) of the said section 39 shall have effect—
as if for the words preceding paragraph (a) there were substituted the words “Where a person residing in a caravan on a caravan site is displaced from that site in consequence of”; and
as if for the words following paragraph (c) there were substituted the words “and neither suitable residential accommodation nor a suitable alternative site for stationing a caravan is available to that person on reasonable terms, then, subject to the provisions of this section, it shall be the duty of the relevant authority to secure that he will be provided with suitable residential accommodation”.
Subsection (6) of the said section 39 shall have effect as if in the words preceding paragraph (a) for the words “unless he was residing in the accommodation in question” there were substituted the words “unless he was residing in a caravan on the caravan site in question”.
The said section 39 shall have effect as if in any provision not modified as aforesaid for any reference to land there were substituted a reference to a caravan site.
In this section “caravan site” has the same meaning as in section 33 above.
41Power of relevant authority to make advances repayable on maturity to displaced residential owner-occupiers.C1
Where a person displaced from a dwelling in consequence of any of the matters mentioned in subsection (1)(a), (b) or (c) of section 39 above—
is an owner-occupier of the dwelling; and
wishes to acquire or construct another dwelling in substitution for that from which he is displaced,
the relevant authority for the purposes of that section may advance money to him for the purpose of enabling him to acquire or construct the other dwelling.
The power conferred by this section shall be exercisable subject to such conditions as may be approved by the Secretary of State and the following provisions shall apply with respect to any advance made in the exercise of that power.
The advance shall be made—
on terms providing for the payment of the principal—
at the end of a fixed period, with or without a provision allowing the authority to extend that period; or
upon notice given by the authority,
subject, in either case, to a provision for earlier repayment on the happening of a specified event;
on such other terms as the authority may think fit having regard to all the circumstances.
An advance for the construction of a dwelling may be made by instalments from time to time as the works of construction progress.
The principal of the advance, together with interest thereon, shall be secured by a mortgage of the borrower’s interest in the dwelling, and the amount of the principal shall not exceed the value which, in accordance with a valuation duly made on behalf of the relevant authority, it is estimated that the borrower’s interest will bear or, as the case may be, will bear when the dwelling has been constructed.
Before advancing money under this section the relevant authority shall satisfy themselves that the dwelling to be acquired is or will be made, or that the dwelling to be constructed will on completion be, in all respects fit for human habitation.
While the payment of the principal of an advance made by a local authority under this section is not required in accordance with the terms of the advance, the local authority may suspend, with respect to so much of any sum borrowed by them as is referable to the advance or with respect to any sum paid in respect of the advance out of their Consolidated Loans Fund, any periodical provision for repayment that may be required by any enactment or by any scheme (whether made under section 55 of the M1Local Government Act 1958 or under any local enactment) by which the Fund was established.
The power conferred by this section on a relevant authority is without prejudice to any power to advance money exercisable by the authority under any other enactment.
In this section “owner-occupier”, in relation to any dwelling, means a person who occupies it on the date of displacement and either—
occupies it on that date in right of a freehold interest therein or a tenancy thereof granted or extended for a term of years certain of which not less than three years remain unexpired; or
if the displacement is in consequence of the matters mentioned in paragraph (c) of section 39(1) above, occupied it in right of such an interest or tenancy on the date on which the land was acquired or appropriated as mentioned in that paragraph.
In this section references to the construction of a dwelling include references to the acquisition of a building and its conversion into a dwelling and to the conversion into a dwelling of a building previously acquired.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F1
42Duty of displacing authority to indemnify rehousing or lending authority for net losses.
Where a relevant authority within the meaning of section 39 above provide or secure the provision of accommodation for any person in pursuance of subsection (1)(a) or (c) of that section, then, if—
the authority providing the accommodation (“the rehousing authority”) are not the same as the authority by whom the land in question is acquired or redeveloped (“the displacing authority”); and
the displacing authority shall make to the rehousing authority periodical payments, or if the rehousing authority so require a lump sum payment, by way of indemnity against any net loss in respect of the rehousing authority’s provision of that accommodation which may be incurred by that authority in any year during the period of ten years commencing with the year in which the accommodation is first provided.
For the purposes of subsection (1) above a local authority incur a net loss in respect of their provision of accommodation for a person whom they are rehousing—
if—
they rehouse him in a Housing Revenue Account dwelling not so provided , and
provide under F5the said Part II in the year immediately preceding that in which he first occupies it, or in the period of three years commencing with the year in which he first occupies it, a dwelling of a similar type or size.
Where money has been advanced to a person as mentioned in section 39(4) above, then if—
the authority making the advance (“the lending authority”) are not the same as the displacing authority; and
the lending authority incur a net loss in respect of the making of the advance,
the displacing authority shall make to the lending authority a lump sum payment by way of indemnity against that loss.
For the purposes of subsection (3) above, a lending authority incur a net loss in respect of the making of an advance to any person if—
he does not fully discharge his liability to the authority in respect of principal, interest and costs or expenses in accordance with the terms on which the advance is made; and
the deficiency exceeds the net proceeds arising to the authority on a sale of the interest on which the principal and interest is secured.
The Secretary of State may—
for the purposes of subsection (1) above from time to time determine a method to be used generally in calculating net losses incurred by rehousing authorities;
for the purposes of that subsection or subsection (3) above, determine the net loss incurred by a rehousing authority or lending authority in any particular case;
give directions as to the manner in which any payment under this section is to be made.
43Power of relevant authority to defray expenses in connection with acquisition of new dwellings.
Where a person displaced from a dwelling in consequence of F1any of the events specified in paragraphs (a) to (d) of section 39(1)above—
has no interest in the dwelling or no greater interest therein than as tenant for a year or from year to year; and
wishes to acquire another dwelling in substitution for that from which he is displaced,
then, according to the nature of the event in consequence of which he was displaced, the acquiring authority, the authority who made the order, passed the resolution, accepted the undertaking or served the notice or the authority carrying out the improvement or redevelopment may pay any reasonable expenses incurred by him in connection with the acquisition, other than the purchase price.
No payment shall be made under this section in respect of expenses incurred by any person in connection with the acquisition of a dwelling unless the dwelling is acquired not later than one year after the displacement and is reasonably comparable with that from which he is displaced.
For the purposes of subsection (2) above a dwelling acquired pursuant to a contract shall be treated as acquired when the contract is made.
Subsections (3) F2(6) and (6A) of section 39 above shall have effect in relation to subsection (1) above and to any provision of subsection (1) of that section as applied thereby.
52BInterest on advance payments of compensation paid lateF1
If the acquiring authority are required by section 52(1A) or (1B) to make an advance payment of compensation but pay some or all of it late, the authority must pay interest on the amount which is paid late (“the unpaid amount”).
Interest under subsection (1) accrues on the unpaid amount for the period beginning with the day after the last day on which payment could have been made in accordance with section 52(4) or (4ZA).
If the amount of the advance payment is greater than the compensation as finally determined or agreed (“the actual amount”), the claimant must repay any interest paid under this section that is attributable to the amount by which the advance payment exceeded the actual amount.
The Treasury must by regulations specify the rate of interest for the purposes of subsection (1).
Regulations under subsection (4) may contain further provision in connection with the payment of interest under subsection (1).
Regulations under subsection (4) are to be made by statutory instrument.
A statutory instrument containing regulations under subsection (4) is subject to annulment in pursuance of a resolution of either House of Parliament.
53Notice to treat in respect of part of agricultural land.C1
Where an acquiring authority serve notice to treat in respect of any agricultural land on a person (whether in occupation or not) having a greater interest in the land than as tenant for a year or from year to year, and that person has such an interest in other agricultural land comprised in the same agricultural unit as that to which the notice relates, the person on whom the notice is served (hereafter referred to as “the claimant”) may, within the period of two months beginning with the date of service of the notice to treat, serve on the acquiring authority a counter-notice—
claiming that the other land is not reasonably capable of being farmed, either by itself or in conjunction with other relevant land, as a separate agricultural unit; and
requiring the acquiring authority to purchase his interest in the whole of the other land.
Where a counter-notice is served under subsection (1) above the claimant shall also, within the period mentioned in that subsection, serve a copy thereof on any other person who has an interest in the land to which the requirement in the counter-notice relates, but failure to comply with this subsection shall not invalidate the counter-notice.
Subject to subsection (4) below, “other relevant land” in subsection (1) above means—
land comprised in the same agricultural unit as the land to which the notice to treat relates, being land in which the claimant does not have such an interest as is mentioned in that subsection; and
land comprised in any other agricultural unit occupied by him on the date of service of the notice to treat, being land in respect of which he is then entitled to a greater interest than as tenant for a year or from year to year.
Where an acquiring authority have served a notice to treat in respect of any of the other agricultural land mentioned in subsection (1) above or in respect of other relevant land as defined in subsection (3) above F1or such a notice is deemed to have been served by virtue of sections 137 to 144 of the Town and Country Planning Act 1990, then, unless and until that notice to treat is withdrawn, this section and section 54 below shall have effect as if that land did not form part of that other agricultural land or did not constitute other relevant land, as the case may be.
This section shall have effect in relation to a case where a notice to treat is deemed to have been served by virtue of any of the provisions of F2F3Part III of the Compulsory Purchase (Vesting Declarations) Act 1981 (general vesting declarations) as it has effect in relation to a case where a notice to treat is actually served, and section 54 below shall have effect accordingly.
55Notice of entry in respect of part of agricultural holding.C1
Where an acquiring authority serve notice of entry under section 11(1) of the M1Compulsory Purchase Act 1965 on the person in occupation of an agricultural holding, being a person having no greater interest therein than as tenant for a year or from year to year, and the notice relates to part only of that holding, the person on whom the notice is served (hereafter referred to as “the claimant”) may, within the period of two months beginning with the date of service of the notice of entry, serve on the acquiring authority a counter-notice—
claiming that the remainder of the holding is not reasonably capable of being farmed, either by itself or in conjunction with other relevant land, as a separate agricultural unit; and
electing to treat the notice of entry as a notice relating to the entire holding.
Where a counter-notice is served under subsection (1) above the claimant shall also, within the period mentioned in that subsection, serve a copy thereof on the landlord of the holding, but failure to comply with this subsection shall not invalidate the counter-notice.
Subject to subsection (4) below, “other relevant land” in subsection (1) above means—
land comprised in the same agricultural unit as the agricultural holding; and
land comprised in any other agricultural unit occupied by the claimant on the date of service of the notice of entry, being land in respect of which he is then entitled to a greater interest than as tenant for a year or from year to year.
Where an acquiring authority have served a notice to treat in respect of land in the agricultural holding other than that to which the notice to entry relates or in respect of other relevant land as defined in subsection (3) above, then, unless and until that notice to treat is withdrawn, this section and section 56 below shall have effect as if that land did not form part of the holding or did not constitute other relevant land, as the case may be.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F1
60. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F1
62. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F1
63Interest on compensation for injurious affection where no land taken.
Compensation under section 68 of the M1Lands Clauses Consolidation Act 1845 or section 10 of the Compulsory Purchase Act 1965 (compensation for injurious affection where no land taken) shall carry interest, at the rate for the time being prescribed under section 32 of the M2Land Compensation Act 1961, from the date of the claim until payment.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F1
64Extension of grounds for challenging validity of compulsory purchase order.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F1
65—67. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F1
84AService of documentsF1
Any communication required or authorised to be sent to a person under this Act may be sent to an email address or uploaded to a website at which the person has agreed in writing to receive communications for the purposes of the claim for compensation.
Any communication required or authorised under this Act to be sent to—
an acquiring authority, or
a responsible authority within the meaning of section 1,
may also be sent electronically by a method mentioned in subsection (3).
The methods are—
sending the communication to an appropriate email address, or
uploading the communication to an appropriate website.
For the purposes of subsection (3)—
an email address or website is an appropriate one if the authority has—
provided the email address or details of the website to the sender for the purposes of communicating with them about the claim for compensation, or
published the fact that the email address or the website may be used for those purposes;
an email address is also an appropriate one if the authority has previously used it for the purposes of communicating with the sender about the claim for compensation.
A communication sent electronically is, unless the contrary is proved, to be treated as having been received on the working day immediately following the day on which it was sent.
In this section “working day” means a day other than a Saturday, a Sunday, Christmas Day, Good Friday or a bank holiday under the Banking and Financial Dealings Act 1971 in England and Wales.
This section does not apply to a communication required or authorised to be sent under this Act to the Upper Tribunal.
86Repeals.C1 E+W+S
The enactments specified in Schedule 3 to this Act are hereby repealed to the extent specified in the third column of that Schedule.