Section 4 Costs.C28C1C2C3C4C5C6C7C8C9C10C11C12C13C14C15C16C17C18C19C20C21C22C23C24C25

England and Wales

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

F1(A1)

In any proceedings on a question referred to the Upper Tribunal under section 1 of this Act—

(a)

the following subsections apply in addition to section 29 of the Tribunals, Courts and Enforcement Act 2007 (costs or expenses) and provisions in Tribunal Procedure Rules relating to costs; and

(b)

to the extent that the following subsections conflict with that section or those provisions, that section or those provisions do not apply.

(1)

Where either—

C26(a)

the acquiring authority have made an unconditional offer in writing of any sum as compensation to any claimant and the sum awarded by the F2Upper Tribunal to that claimant does not exceed the sum offered; or

(b)

the Upper Tribunal is satisfied that a claimant has failed to deliver to the acquiring authority, in time to enable them to make a proper offer, a notice in writing of the amount claimed by him, containing the particulars mentioned in subsection (2) of this section;

the Upper Tribunal shall, unless for special reasons it thinks proper not to do so, order the claimant to bear his own costs and to pay the costs of the acquiring authority so far as they were incurred after the offer was made or, as the case may be, after the time when in the opinion of the Upper Tribunal the notice should have been delivered.

(2)

The notice mentioned in subsection (1) of this section must state the exact nature of the interest in respect of which compensation is claimed, and give details of the compensation claimed, distinguishing the amounts under separate heads and showing how the amount claimed under each head is calculated.

(3)

Where a claimant has delivered a notice as required by paragraph (b) of subsection (1) of this section and has made an unconditional offer in writing to accept any sum as compensation, then, if the sum awarded to him by the F3Upper Tribunal is equal to or exceeds that sum, the Upper Tribunal shall, unless for special reasons it thinks proper not to do so, order the acquiring authority to bear their own costs and pay the costs of the claimant so far as they were incurred after his offer was made.

C27(4)

The F4Upper Tribunal may in any case disallow the cost of counsel.

(5)

Where the F5Upper Tribunal orders the claimant to pay the costs, or any part of the costs, of the acquiring authority, the acquiring authority may deduct the amount so payable by the claimant from the amount of the compensation payable to him.

F6(6)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annotations

Textual amendments

F1

S. 4(A1) inserted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 39(a) (with Sch. 5)

F2

Words in s. 4(1) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 39(b) (with Sch. 5)

F3

Words in s. 4(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 39(b) (with Sch. 5)

F4

Words in s. 4(4) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 39(b) (with Sch. 5)

F5

Words in s. 4(5) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 39(b) (with Sch. 5)

F6

S. 4(6) omitted (1.6.2009) by virtue of The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 39(c) (with Sch. 5)

Modifications

C1

S. 4 applied (with modifications) (1.12.1991) by the Water Industry Act 1991 (c. 56, SIF 130), ss. 167, 180, 223(2), Sch. 11 para. 8(6), Sch. 12 para. 3(1) (with ss. 82(3), 186(1), 222(1), Sch. 14 para. 6)

S. 4 applied (with modifications) (1.12.1991) by Water Resources Act 1991 (c. 57, SIF 130), ss. 61 (5), 62(5), 168(3), 177, 225(2), Sch. 7 para. 5, Sch. 19 para. 8(6), Sch. 21 para. 3(1) (with ss. 16(6), 179, 222(3), Sch. 22 para. 1, Sch. 23 para. 6)

S. 4 applied (with modifications) (30.10.1994) by S.I. 1994/2716, art. 92(4)

S. 4 applied (with modifications) (30.10.1994) by S.I. 1994/2716, reg. 96(3)

S. 4 applied (1.6.1997) by S.I. 1997/1160, reg. 14(6)

S. 4 applied (with modifications) (1.10.1998) by 1975 c. 70, Sch. 4 Pt. 1V, para. 15(4) (as inserted by 1998 c.38, s. 127, Sch. 13 para. 3 (with ss. 139(2), 143(2)); S.I. 1998/2244, art. 4)

S. 4 applied (with modifications) (1.4.1999) by S.I. 1999/481, reg. 8(4)

S. 4 applied (with modifications) (29.4.1999) by S.I. 1999/1006, reg. 7, Sch. para. 6

S. 4 applied (with modifications) (26.3.2001) by 2000 c. 26, s. 95, Sch. 6 para. 5(2); S.I. 2000/2957, art. 2(3), Sch. 3

S. 4 applied (with modifications) (1.4.2000) by S.I. 2000/227, reg. 6, Sch. 2 para. 6(4)

S. 4 applied (with modifications) (W.) (1.7.2001) by S.I. 2001/2197, reg. 6, Sch. 2 para. 6(4)

C2

S. 4 applied (with modifications) (W.) (10.12.2006) by The Contaminated Land (Wales) Regulations 2006 (S.I. 2006/2989), reg. 1(1), Sch. 2 para. 6(4)

C3

S. 4 applied (with modifications) (26.11.2008 for specified purposes, 1.3.2010 in so far as not already in force) by Planning Act 2008 (c. 29), ss. 165(6), 241(1), 241(8) (with s. 226); S.I. 2010/101, art. 3(j) (with art. 6)

C4

S. 4 applied (with modifications) (E.) (1.3.2009) by Environmental Damage (Prevention and Remediation) Regulations 2009 (S.I. 2009/153), reg. 1(1), Sch. 6 para. 7(2)

C5

S. 4 applied (with modifications) (1.4.2010) by The Conservation of Habitats and Species Regulations 2010 (S.I. 2010/490), regs. 1(2), 28(8)(b) (with reg. 125)

C6

S. 4 modified (1.4.2010) by The Conservation of Habitats and Species Regulations 2010 (S.I. 2010/490), regs. 1(2), 32(3) (with reg. 125)

C7

S. 4 applied (with modifications) (6.4.2010) by The Environmental Permitting (England and Wales) Regulations 2010 (S.I. 2010/675), reg. 1(1)(b), Sch. 5 para. 7 (with reg. 1(2), Sch. 4)

C8

S. 4 applied (with modifications) (1.10.2011) by The Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 (S.I. 2011/2055), regs. 1, 61(5)

C9

S. 4 applied (with modifications) (E.) (6.4.2012) by The Town and Country Planning (Tree Preservation)(England) Regulations 2012 (S.I. 2012/605), regs. 1(1), 24(9) (with reg. 24(10))

C10

S. 4 modified by S.I. 2006/1380, Sch. 2 para. 6(4) (as substituted (6.4.2012) by The Contaminated Land (England) (Amendment) Regulations 2012 (S.I. 2012/263), regs. 1, 2(4))

C11

S. 4 applied (with modifications) by S.I. 2006/2989, Sch 2 para. 6(4) (as substituted (W.) (6.4.2012) by The Contaminated Land (Wales) (Amendment) Regulations 2012 (No. 283), regs. 1(1), 2(4)(c))

C12

S. 4 applied (with modifications) (E.) (19.7.2015) by The Environmental Damage (Prevention and Remediation) (England) Regulations 2015 (S.I. 2015/810), reg. 1(1), Sch. 6 para. 7(2) (with regs. 4-8)

C13

S. 4 applied (with modifications) (13.7.2016) by Housing and Planning Act 2016 (c. 22), ss. 176(3), 216(3); S.I. 2016/733, reg. 3(h)

C14

S. 4 applied (with modifications) (1.1.2017) by The Environmental Permitting (England and Wales) Regulations 2016 (S.I. 2016/1154), reg. 1(1), Sch. 5 para. 7(4) (with regs. 1(3), 77-79, Sch. 4)

C15

S. 4 applied (30.11.2017) by The Conservation of Habitats and Species Regulations 2017 (S.I. 2017/1012), regs. 1(2), 30(8)(b)

C16

S. 4 modified (30.11.2017) by The Conservation of Habitats and Species Regulations 2017 (S.I. 2017/1012), regs. 1(2), 34(3)

C17

S. 4 applied (with modifications) (1.1.2018) by The Water Abstraction (Transitional Provisions) Regulations 2017 (S.I. 2017/1047), regs. 1, 11(2) (with reg. 8)

C18

S. 4 applied (with modifications) (1.10.2024) by The Land Compensation (Additional Compensation) (England) Regulations 2024 (S.I. 2024/915), regs. 1(1), 13(2)

C19

S. 4 applied (with modifications) (4.11.2024) by Historic Environment (Wales) Act 2023 (asc 3), ss. 203(2), 212(2) (with Sch. 14 paras. 1-3); S.I. 2024/860, art. 3(c)

C20

S. 4 applied (with modifications) (2.12.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 216(4), 255(7) (with s. 247); S.I. 2024/1138, reg. 2(g)

C21

S. 4 applied (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), art. 1, Sch. 12 para. 1(10) (with art. 40, Sch. 13)

C22

S. 4 applied (with modifications) (15.12.2025) by Infrastructure (Wales) Act 2024 (asc 3), ss. 108(7), 147(2) (with s. 84(5)); S.I. 2025/698, art. 3(h)

C23

S. 4 applied (18.2.2026) by Planning and Infrastructure Act 2025 (c. 34), ss. 86(4), 118(3) (with ss. 98, 116); S.I. 2025/1370, reg. 4(1)(l)

C24

S. 4 applied (with modifications) (16.3.2026) by Infrastructure (Wales) Act 2024 (asc 3), s. 147(2), Sch. 2 para. 10 (with s. 84(5)); S.I. 2025/1306, art. 2(h)

C25

S. 4 applied (with modifications) (24.7.2026) by 2008 c. 29, s. 53(8A) (as inserted by Planning and Infrastructure Act 2025 (c. 34), ss. 11(7), 118(1)(e) (with s. 116); S.I. 2026/641, reg. 3(g))

C26

S. 4(1)(a) applied (with modifications) by 1985 c. 68, s. 584B(6) (as substituted (6.4.2006 for E., 16.6.2006 for W.) by Housing Act 2004 (c. 34), s. 270(4)(5)(f), Sch. 15 para. 31; S.I. 2006/1060, art. 2(1)(d) (with Sch.); S.I. 2006/1535, art. 2(b) (with Sch.))

C27

S. 4(4)-(6) applied (with modifications) by 1985 c. 68, s. 584B(6) (as substituted (6.4.2006 for E., 16.6.2006 for W.) by Housing Act 2004 (c. 34), s. 270(4)(5)(f), Sch. 15 para. 31; S.I. 2006/1060, art. 2(1)(d) (with Sch.); S.I. 2006/1535, art. 2(b) (with Sch.))

C28

S. 4 applied (with modifications) by Acts listed in Chronological Table of the Statutes, Local Government, Planning and Land Act 1980 (c. 65), s. 167(9), National Heritage Act 1983 (c. 47, SIF 3, 78), s. 36(10) and Mineral Workings Act 1985 (c. 12, SIF 86), ss. 7(13), 8(11); applied by Electricity Act 1989 (c. 29, SIF 44:1), ss. 10(1), 112(3), Sch. 4 paras. 7(4), 11(3), Sch. 17 para. 35(1); applied (with modifications) by Water Act 1989 (c. 15, SIF 130), ss. 153(1), 155, Sch. 19 paras. 6(4)(7), 11, Sch. 20 para. 8(6), (with ss. 58(7), 101(1), 141(6), 160(1)(2)(4), 163, 189(4)–(10), 190, 193(1), Sch. 26 paras. 3(1)(2), 17, 40(4), 57(6), 58)

Notes on Part I

Modifications

C1

Pt. 1 applied (with modifications) by Agriculture (Miscellaneous Provisions) Act 1968 (c. 34), s. 13(3), Sch. 3 paras. 4, 5

Pt. 1 applied by Channel Tunnel Act 1987 (c. 53, SIF 102), ss. 6, 35, Sch. 2 paras. 4(3), 7(3), 13(9), 14(8), 16(8), Sch. 4 para. 4(5), Sch. 5 Pt. 3 para. 6(2)

Pt. 1 applied by Dartford-Thurrock Crossing Act 1988 (c. 20, SIF 59), ss. 2(5), 3, Sch. 2 Pt. 2 para. 5(2), Sch. 3 paras 1(9), 2(5)

Pt. 1 applied (13.2.1992) by Severn Bridges Act 1992 (c. 3), ss. 2(6), 3, Sch. 2 Pt. 2 para. 4(2), Pt. 3 para. 7(7)(8), Sch. 3 para. 1(6)

Pt. 1 applied (21.7.1994) by 1994 c. xi, ss. 19(3), 20(4), 23(7), 29(3), 34(6), 41(3) (with s. 39)

Pt. 1 applied (21.7.1994) by 1994 c. xv, ss. 10(2)(b), 22(g), 27(3), 34(7), 61(2)(3) (with s. 47)

Pt. 1 applied (11.11.1996) by S.I. 1996/2714, arts. 10(4), 18(6), 21(5), 28(3), 29(6), 32(4), 40(4)

Pt. 1 applied (18.12.1996) by 1996 c. 61, ss. 2, 3, 6, 7(4)(5), 44, Sch. 2 paras. 8(2)(3), 10(8), Sch. 3 para. 3(3), Sch. 5 paras. 1(5)(6), 4(7)(8), 5(3), Sch. 12 Pt. 2, para. 3(6)

Pt. 1 applied (10.2.1997) by S.I. 1997/264, arts. 7(4), 14(10), 15(5), 16(6), 20(3), 24(3)

Pt. 1 applied (21.5.1997) by S.I. 1997/1266, arts. 11(5), 19(6), 21(5), 30(6), 33(4) (with art. 41)

Pt. 1 applied (27.8.1998) by S.I. 1998/1936, arts. 11(6), 19(6), 21(1), 32(6), 33(7), 36(4) (with art. 45)

Pt. 1 applied (13.1.1999) by S.I. 1998/3269, arts. 9(5), 16(7), 18(4), 27(3)

Pt. 1 applied (19.2.1999) by S.I. 1999/537, art. 10(6)

Pt. 1 applied (30.4.1999) by S.I. 1999/1306, arts. 1, 12(5), 14(6), 15(7), 21(3)

Pt. 1 applied (18.5.1999) by S.I. 1999/1664, arts. 8(4), 9(6), 10(7) (with art. 18)

Pt. 1 applied (20.8.1999) by S.I. 1999/2336, arts. 8(3), 9(7), 17(6), 20(3)

Pt. 1 applied (23.8.1999) by S.I. 1999/2981, arts. 6(5), 13(10), 14(5), 20(6), 21(7), 24(3), 25(2), 27

Pt. 1 applied (3.6.1999) by S.I. 1999/1555, art. 7(2)

Pt. 1 applied (24.12.1999) by S.I. 2000/428, art. 8(4)

Pt. 1 applied (29.3.2001) by S.I. 2001/1347, arts. 11(6), 19(10), 21(5), 27(3), 28(6), 29(7), 32(3) (with arts. 15, 37, 38(2))

Pt. 1 applied (2.3.2001) by S.I. 2001/1368, arts. 10(3), 13(4)

Pt. 1 applied (2.3.2001) by S.I. 2001/1369, arts. 8(3), 11(4)

Pt. 1 applied (18.7.2001) by S.I. 2001/2870, art. 10(7)

Pt. 1 applied (24.7.2001) by S.I. 2001/3627, arts. 11(6), 27(6), 29(10), 32(5), 40(3), 41(6), 42(7)(8), 45(4), 55(3)(4)

Pt. 1 applied (9.11.2001) by S.I. 2001/3682, arts. 7(4)(5), 15(10), 16(5), 22(3), 26(3)(4) (with Sch. 12 para. 2)

Pt. 1 applied (30.4.2002) by S.I. 2002/1065, arts. 7(11), 8(4), 14(6), 15(7), 19(3)

Pt. 1 applied (12.8.2002) by S.I. 2002/1943, arts. 8(4), 9(7) (with art. 9(8)(9))

Pt. 1 applied (31.5.2002) by S.I. 2002/1327, arts. 10(2) (subject to Sch. 2, para. 5), 15(5), 26(4)

Pt. 1 applied (14.3.2002) by S.I. 2002/412, arts. 13(5), 19(3), 22(2), 28(3), (with saving in art. 38)

Pt. 1 applied (31.12.2002) by S.I. 2002/3127, art. 7(3) (with arts. 16, 17)

Pt. 1 applied (28.4.2003) by Network Rail (West Coast Main Line) Order 2003 (S.I. 2003/1075), arts. 1, 7(4), 9(2), 13(8), 30(6) (with art. 40)

Pt. 1 applied (4.3.2004) by The Network Rail (West Coast Main Line) Order 2004 (S.I. 2004/389), arts. 1, 7(4), 8(5), 9(5), 11(2), 12(8), 20(10), 21(5), 27(3), 28(7), 31(3) (with art. 38)

Pt. 1 applied (2.4.2004) by Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), arts. 1, 10(6), 19(10), 21(5), 29(3), 30(8) (with arts. 30(9), 31(7), 32(5), 35(4)(5), Sch. 12 para. 2)

Pt. 1 applied (19.11.2004) by Scarweather Sands Offshore Wind Farm Order 2004 (S.I. 2004/3054), arts. 1, 6(6), 7(5), 21(5)(6) (with art. 38)

Pt. 1 applied (28.1.2005) by East Midlands Parkway Station (Land Acquisition) Order 2005 (S.I. 2005/8), arts. 1, 9(3)

Pt. 1 applied (11.2.2005) by Merseytram (Liverpool City Centre to Kirkby) Order 2005 (S.I. 2005/120), arts. 1, 11(6), 19(8), 22(10), 25(5), 35(3), 36(6), 37(7), 40(4), 71(8) (with arts. 65, 66)

Pt. 1 applied (22.3.2005) by Midland Metro (Wednesbury to Brierley Hill and Miscellaneous Amendments) Order 2005 (S.I. 2005/927), arts. 12, 13(6), 21(6), 23(6), 24(10), 26(5), 28(3), 33(3)(4), 34(6), 35(7), 36(8), 39(3), Sch. 10 para. 2 (with arts. 23(7), 24(9), 34(7), 35(8), 39(4)(8), 51)

Pt. 1 applied (4.5.2005) by The Telford Railfreight Terminal (Donnington) Order 2005 (S.I. 2005/1163), arts. 1, 9(5), 10(6), 12(8), 18(2)

Pt. 1 applied (22.7.2005) by Midland Metro (Birmingham City Centre Extension, etc.) Order 2005 (S.I. 2005/1794), arts. 1, 12(2), 20(6), 21(10), 23(5), 29(3), 30(6), 31(7), 32(7), 35(3) (with arts. 21(11), 29(4), 30(7), 31(8), 35(4), 35(8), 47)

Pt. 1 applied (3.8.2005) by The Greater Manchester (Leigh Busway) Order 2005 (S.I. 2005/1918), arts. 1, 41(4)

Pt. 1 applied (26.8.2005) by River Tyne (Tunnels) Order 2005 (S.I. 2005/2222), arts. 1, 14(10), 16(5), 27(6), 28(7), 31(4), 32(3) (with arts. 45(1), 48, Sch. 10 paras. 21, 29)

Pt. 1 applied (8.10.2005) by Leicestershire County Council (Ashby de la Zouch Canal Extension) Order 2005 (S.I. 2005/2786), arts. 1, 15(4)(5), 19(6)(7), 22

Pt. 1 applied (25.11.2005) by Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), arts. 1, 12(7), 20(10), 22(5), 29, 30(6), 31(7), 34(4), 38(4) (with arts. 3(5), 15(3))

Pt. 1 applied (11.1.2006) by The Cambridgeshire Guided Busway Order 2005 (S.I. 2005/3523), arts. 1, 10(4), 19(5), 27(3), 28(6), 29(7), 32(4), 43(3) (with arts. 19(6), 28(7), 52)

Pt. 1 applied (3.7.2006) by Port of Blyth (Battleship Wharf Railway) Order 2006 (S.I. 2006/1518), arts. 1, 9(4)

Pt. 1 applied (14.9.2006) by The Borough of Poole (Poole Harbour Opening Bridges) Order 2006 (S.I. 2006/2310), arts. 1, 5(6), 8(4), 15(10), 16(5), 23(6), 24(7), 27, 28(2) (with arts. 23(7), 24(8), 28(3), 40, Sch. 7 para. 12)

Pt. 1 applied (22.11.2006) by Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), arts. 1, 10(6), 11(6), 16(10), 18(5), 26(3), 27(6), 28(7), 31(4), 34(4) (with arts. 27(7), 28(8), 31(5), 43)

Pt. 1 applied (13.12.2006) by Luton Dunstable Translink Order 2006 (S.I. 2006/3118), arts. 1, 9(6), 10(7), 16(10), 17(5), 23(3), 24(6), 27(3), 33(3)

Pt. 1 applied (13.12.2006) by The Network Rail (Thameslink 2000) Order 2006 (S.I. 2006/3117), arts. 1, 15(8), 16(8), 22(10), 23(5), 28(3), 29(6), 32(3) (with arts. 34, 35(2))

Pt. 1 applied (19.3.2007) by Ouseburn Barrage Order 2007 (S.I. 2007/608), arts. 1, 6(3)(4), 7(4)(5), 28(7), 31(4) (with arts. 46-48, Sch. 5 para. 2, Sch. 6 para. 23)

Pt. 1 applied (23.8.2007) by Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007 (S.I. 2007/2297), arts. 1, 9(6), 10(6), 14(5), 16(10), 18(5), 25(3), 26(6), 27(7), 30(4), 32(4) (with arts. 3(6), 12(3))

Pt. 1 applied (28.9.2007) by London Gateway Logistics and Commercial Centre Order 2007 (S.I. 2007/2657), arts. 1, 12(3) (with arts. 19, 28, Sch. 3 para. 13(2))

Pt. 1 applied (17.12.2007) by Felixstowe Dock and Railway Company (Land Acquisition) Order 2007 (S.I. 2007/3345), arts. 1(1), 7(2)

Pt. 1 applied (16.5.2008) by London Gateway Port Harbour Empowerment Order 2008 (S.I. 2008/1261), arts. 1, 22(5), 32(2) (with arts. 41(1), 45, 54(2), 55, 56, 57, 58(6))

Pt. 1 applied (21.5.2008) by Teesport (Land Acquisition) Order 2008 (S.I. 2008/1238), arts. 1(1), 6(6), 8(4)

Pt. 1 applied (22.7.2008) by Crossrail Act 2008 (c. 18), s. 8(8), Sch. 2 paras. 7(2), 9(8), 10(6), Sch. 3 para. 3(3), Sch. 5 paras. 1(5), 3(3), 4(7), 5(4)

Pt. 1 applied (14.10.2008) by Felixstowe Branch Line and Ipswich Yard Improvement Order 2008 (S.I. 2008/2512), arts. 1, 8(6), 10(6), 17(6), 18(3), 20(10), 21(5), 26, 27(6), 28(7), 32(4), 35(3) (with arts. 21(6), 32(5), 36(3))

Pt. 1 applied (29.12.2008) by Network Rail (Thameslink) (Land Acquisition) Order 2008 (S.I. 2008/3163), arts. 1, 12(3)

Pt. 1 applied (9.6.2009) by Nottingham Express Transit System Order 2009 (S.I. 2009/1300), arts. 1, 11(6), 12(6), 20(5), 22(10), 25(5), 35(3)(5), 36(6), 37(7), 41(4), 51(3), 76(8) (with arts. 25(6), 37(8), 41(5), 45(2), 51(3), Sch. 13 para. 14(2), Sch. 14 para. 19, Sch. 16)

Pt. 1 applied (18.9.2009) by London Underground (Victoria Station Upgrade) Order 2009 (S.I. 2009/2364), arts. 1, 8(3), 9(8), 14(10), 16(5), 23(3), 24(6), 25(7), 29(4), 35(7)

Pt. 1 applied (28.10.2009) by Network Rail (Reading) (Land Acquisition) Order 2009 (S.I. 2009/2728), arts. 1, 9(3), 10(6), 11(3), 12(7), 16(4)

Pt. 1 applied (20.7.2010) by The Network Rail (Nuneaton North Chord) Order 2010 (S.I. 2010/1721), arts. 1, 20(7), 24(3), 27(3)

Pt. 1 applied (27.8.2010) by The Llangollen and Corwen Railway Order 2010 (S.I. 2010/2136), arts. 1(1), 8(5), 12(3)

Pt. 1 applied (1.2.2011) by The River Mersey (Mersey Gateway Bridge) Order 2011 (S.I. 2011/41), arts. 1, 8(6), 9(6), 15(10), 16(5), 17(4), 25(3), 28(6), 29(7), 33(4), 48(3) (with art. 51, Sch. 10 paras. 68, 85)

Pt. 1 applied (21.4.2011) by The Network Rail (Hitchin (Cambridge Junction)) Order 2011 (S.I. 2011/1072), arts. 1, 9(4), 10(6), 15(5), 23(3), 24(7), 25(7), 29(4), 32(3)

Pt. 1 applied (7.8.2012) by The Ipswich Barrier Order 2012 (S.I. 2012/1867), arts. 1, 6(8), 7(5), 27(6), 28(7), 32(4) (with arts. 46-48, Sch. 8 para. 18)

Pt. 1 applied (12.8.2012) by The Hinkley Point (Temporary Jetty) (Land Acquisition) Order 2012 (S.I. 2012/1924), arts. 1, 9(3)

Pt. 1 applied (16.8.2012) by The Hinkley Point Harbour Empowerment Order 2012 (S.I. 2012/1914), arts. 1(1), 19(5), 20(3) (with arts. 34, 35, 37, 40)

Pt. 1 applied (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), arts. 1, 11(7), 13(10), 15(5), 19(5), 23(6)(7), 27(3) (with arts. 23(7), 26(2))

Pt. 1 applied (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), arts. 1, 13(4), 15(6), 19(4), 21(5), 25(5), 29(4)(5), 30(6), 36(3) (with art. 35(2))

Pt. 1 applied (13.11.2012) by The Chiltern Railways (Bicester to Oxford Improvements) Order 2012 (S.I. 2012/2679), arts. 1, 9(6), 10(6), 15(4), 17(3), 20(10), 21(5), 28(3), 29(6), 30(7), 35(4), 40(3) (with art. 42(2))

Pt. 1 applied (28.3.2013) by The Network Rail (Seaham Level Crossing) Order 2013 (S.I. 2013/533), arts. 1, 3(4), 8(6), 12(3)

Pt. 1 applied (9.4.2013) by The Hinkley Point C (Nuclear Generating Station) Order 2013 (S.I. 2013/648), arts. 1, 15(8), 17(5), 22(10), 23(5), 28(4), 32(4), 33(6), 34(7), 41(3), 42(4) (with arts. 28(5), 33(7)(11), 34(8), 48, 68, 79)

Pt. 1 applied (15.6.2013) by The Galloper Wind Farm Order 2013 (S.I. 2013/1203), arts. 1, 15(5), 19(5), 22(4), 23(7), 24(7) (with arts. 11, 12)

Pt. 1 applied (15.8.2013) by The North Blyth Biomass Power Station Order 2013 (S.I. 2013/1873), arts. 1, 12(5), 13(3), 16(4), 17(3) (with arts. 17(4), 30)

Pt. 1 applied (22.8.2013) by The Leeds Railway Station (Southern Entrance) Order 2013 (S.I. 2013/1933), arts. 1, 8(3), 9(5), 14(10), 15(5), 16(4), 26(3), 27(7), 28(7), 32(4), 35(3)

Pt. 1 applied (6.11.2013) by The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013 (S.I. 2013/2587), arts. 1, 13(6), 19(7), 21(10), 23(5), 31(3), 32(6), 33(7), 37(4) (with arts. 31(5), 32(7), 33(8), 38(2), 42, 43)

Pt. 1 applied (20.11.2013) by The M1 Junction 10a (Grade Separation) Order 2013 (S.I. 2013/2808), arts. 1, 17(5), 25(6), 30(3), 31(4)

Pt. 1 applied (21.11.2013) by The Network Rail (Redditch Branch Enhancement) Order 2013 (S.I. 2013/2809), arts. 1, 14(5), 18(5), 24(7), 28(3) (with arts. 24(8), 27(2), 39, Sch. 10 para. 4)

Pt. 1 applied (with modifications) (21.11.2013) by The Network Rail (Redditch Branch Enhancement) Order 2013 (S.I. 2013/2809), arts. 1, 23(6) (with arts. 16(2), 23(7), 27(2), 39, Sch. 10 para. 4)

Pt. 1 applied (9.1.2014) by The Ashton Vale to Temple Meads and Bristol City Centre Rapid Transit Order 2013 (S.I. 2013/3244), arts. 1, 10(7), 11(6), 16(5), 18(10), 20(5), 27(3), 28(7), 29(7), 33(4), 41(3) (with arts. 57, 58, Sch. 9 para. 2, Sch. 11 para. 19)

Pt. 1 applied (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), arts. 1, 16(10), 17(5), 18(4), 24(4), 25(7), 26(7), 30(3) (with arts. 16(9), 20(2), 24(5), 25(8), 26(8))

Pt. 1 applied (11.3.2014) by The Crossrail (Paddington Station Bakerloo Line Connection) Order 2014 (S.I. 2014/310), arts. 1, 7(10), 13(6)

Pt. 1 applied (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), arts. 1, 11(4), 13(5), 17(4), 19(5), 23(5), 27(5)(6), 28(6), 29(6), 30(7), 35(3) (with art. 34(2))

Pt. 1 applied (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), arts. 1, 12(4), 14(6), 18(10), 19(5), 20(7)(b), 26(5), 30(4), 31(6), 32(7), 37(3) (with art. 35)

Pt. 1 applied (7.7.2014) by The East Anglia ONE Offshore Wind Farm Order 2014 (S.I. 2014/1599), arts. 1, 10(5), 18(4), 22(4), 23(6), 24(7), 32(3) (with arts. 23(7), 37, 38, Sch. 9 para. 19)

Pt. 1 applied (24.7.2014) by The Daventry International Rail Freight Interchange Alteration Order 2014 (S.I. 2014/1796), arts. 1, 18(5), 22(4), 26(3) (with arts. 22(5), 24(2), 26(4)(5), Sch. 6 para. 3)

Pt. 1 applied (29.7.2014) by The Felixstowe Branch Line (Land Acquisition) Order 2014 (S.I. 2014/1821), arts. 1, 7(3), 8(6), 9(7)

Pt. 1 applied (19.8.2014) by The Network Rail (Huyton) Order 2014 (S.I. 2014/2027), arts. 1, 8(2), 14(10), 21(6), 22(7), 26(5), 30(3) (with arts. 21(7), 22(8), 26(6), 31(2))

Pt. 1 applied (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 1, 11(6), 12(5), 16(10), 17(5), 21(5), 25(4), 26(6), 30(3) (with arts. 21(6), 28)

Pt. 1 applied (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 13(5), 15(5), 20(10), 21(10), 22(7), 25(3), 26(4), 27(7), 28(3), 29(4), 35(7), 36(7)

Pt. 1 applied (2.10.2014) by The North Killingholme (Generating Station) Order 2014 (S.I. 2014/2434), arts. 1, 10(6), 15(5), 16(3), 18(4), 20(4), 24(4), 25(6), 26(7), 31(3), 32(10) (with arts. 5, 6, 13, 16(4), 32(9), Sch. 8 Pt. 1 para. 6, Sch. 8 Pt. 3 paras. 4(3), 6, 17, Sch. 8 Pt. 5 para. 9)

Pt. 1 excluded (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 28(3) (with art. 33)

Pt. 1 applied (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 11(3), 14(5), 19(5), 24(3) (with art. 33)

Pt. 1 applied (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), arts. 1, 15(5), 16(3), 18(4), 20(4), 23(4), 24(6), 25(7), 32(3) (with art. 28(8))

Pt. 1 applied (21.10.2014) by The Central Bedfordshire Council (Woodside Link Houghton Regis) Development Consent Order 2014 (S.I. 2014/2637), arts. 1, 12(6), 13(6), 17(10), 18(6), 22(5), 26(4), 27(6), 28(7), 33(3)

Pt. 1 applied (23.10.2014) by The South Hook Combined Heat and Power Plant Order 2014 (S.I. 2014/2846), arts. 1, 11(5)

Pt. 1 applied (15.12.2014) by The London Underground (Northern Line Extension) Order 2014 (S.I. 2014/3102), arts. 1, 10(6), 13(3), 18(10), 20(5), 21(3), 29(3), 30(8), 31(8), 35(4) (with arts. 18(9), 29(5), 30(9), 31(9), 35(5), Sch. 8 para. 45)

Pt. 1 applied (31.12.2014) by The Hornsea One Offshore Wind Farm Order 2014 (S.I. 2014/3331), arts. 1, 8(6), 13(5), 16(6), 18(4), 22(4)(5), 23(7), 24(7), 27(5), 28(4) (with arts. 37, 38)

Pt. 1 applied (2.2.2015) by The Northumberland County Council (A1 – South East Northumberland Link Road (Morpeth Northern Bypass)) Development Consent Order 2015 (S.I. 2015/23), arts. 1, 10(6), 19(5), 23(8), 24(5), 29(6), 30(7), 34(3) (with arts. 10(7), 24(6))

Pt. 1 applied (with modifications) (2.2.2015) by The Northumberland County Council (A1 – South East Northumberland Link Road (Morpeth Northern Bypass)) Development Consent Order 2015 (S.I. 2015/23), arts. 1, 28(4)

Pt. 1 applied (25.2.2015) by The A160/A180 (Port of Immingham Improvement) Development Consent Order 2015 (S.I. 2015/129), arts. 1, 12(6), 13(5), 17(10), 18(5), 23(5), 27(4)(5), 28(6), 29(7), 33(3) (with art. 31)

Pt. 1 applied (26.2.2015) by The Cornwall Council (A30 Temple to Higher Carblake Improvement) Order 2015 (S.I. 2015/147), arts. 1, 12(6), 13(5), 17(10), 18(5), 21(4), 22(5), 27(4), 28(6), 29(7), 35(3) (with arts. 17(9), 22(6), 27(5), 28(7), 29(8))

Pt. 1 applied (11.3.2015) by The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (S.I. 2015/318), arts. 1, 14(5), 18(10), 19(6), 21(4), 24(6), 25(4), 28(4)(b), 29(6), 30(7), 36(4), 38(3) (with arts. 8(5), 18(9), 25(5), 28(5), 29(7), 30(8), 40, 41, Sch. 12 Pt. 1 paras. 4, 9(2), 10, Sch. 12 Pt. 2 paras. 4(2)(3), 19, Sch. 12 Pt. 3 para. 3, Sch. 12 Pt. 4 paras. 3, 4, 16)

Pt. 1 applied (1.4.2015) by The Knottingley Power Plant Order 2015 (S.I. 2015/680), arts. 1, 11(4), 16(5), 21(8), 22(4), 26(4), 27(6), 28(7), 34(3) (with arts. 7(6), 22(5)(7), 27(7), 28(8), 31, Sch. 8 para. 10)

Pt. 1 applied (21.4.2015) by The Crossrail (Plumstead Sidings) Order 2015 (S.I. 2015/781), arts. 1, 6(3), 7(5), 21(3)

Pt. 1 applied (21.4.2015) by The Network Rail (Ordsall Chord) Order 2015 (S.I. 2015/780), arts. 1, 11(4), 12(6), 18(10), 19(5), 20(3), 26(4)(5), 27(6), 28(7), 32(5), 35(3) (with art. 36(2))

Pt. 1 applied (9.6.2015) by The White Moss Landfill Order 2015 (S.I. 2015/1317), arts. 1, 10(5), 11(3), 16(3) (with arts. 5, 16(4)(5))

Pt. 1 excluded (9.6.2015) by The White Moss Landfill Order 2015 (S.I. 2015/1317), arts. 1, 15(2) (with art. 5)

Pt. 1 applied (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), arts. 1, 12(6), 14(6), 18(10), 19(5), 24(5), 28(4)(5), 29(6), 30(7), 35(3), 36(5) (with art. 24(6))

Pt. 1 modified (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 41(3) (with arts. 51, 53)

Pt. 1 applied (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 10(5), 14(10), 15(5), 24(3), 25(5), 26(4), 28(4), 32(4)(5), 33(6), 34(7), 36(2) (with arts. 51, 53))

Pt. 1 modified (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 23(6) (with arts. 23(7), 44)

Pt. 1 applied (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 16(10), 17(5), 18(3), 19(4), 24(7), 32(4), 33(4), 37(3) (with arts. 20, 23, 32(5), 33(5), 44)

Pt. 1 modified (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 27(7) (with arts. 27(8), 30)

Pt. 1 applied (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 15(5), 21(5), 25(4), 26(6), 31(3) (with arts. 21(6), 25(5), 26(11), 30)

Pt. 1 modified (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 27(6), 28(7), 32(3) (with art. 27(5))

Pt. 1 applied (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 16(5), 22(5), 26(4) (with arts. 22(6), 26(5))

Pt. 1 applied (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), arts. 1, 15(5), 19(10), 20(6), 25(6), 28(4), 29(6), 30(7), 36(4), 38(3) (with arts. 8, 20(7), 24(2), 28(5), 29(7), 30(8), 35, 40, 41, Sch. 12 para. 2)

Pt. 1 applied (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), arts. 1, 7(6), 11(5)

Pt. 1 applied (19.11.2015) by The Ferrybridge Multifuel 2 Power Station Order 2015 (S.I. 2015/1832), arts. 1(2), 13(7), 14(4), 15(5)(6)

Pt. 1 applied (with modifications) (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 18(6) (with art. 24(2))

Pt. 1 applied (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 9(10), 10(5), 19(7), 23(5), 26(3) (with art. 23(6))

Pt. 1 applied (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), arts. 1, 12(5), 13(6), 18(10), 19(6), 25(3), 26(6), 30(4) (with art. 19(7))

Pt. 1 applied (2.2.2016) by The East Midlands Gateway Rail Freight Interchange and Highway Order 2016 (S.I. 2016/17), arts. 1, 11(6), 13(4), 23(5), 30(4)(5), 31(6), 37(3) (with art. 32)

Pt. 1 applied (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), arts. 1, 13(6), 17(10), 18(5), 28(4), 29(8), 31(7), 39(5), 41(3), 42(4) (with arts. 21(2), 28(5), 29(9), 31(8), 32)

Pt. 1 applied (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), arts. 1, 11(5), 12(5), 16(10), 17(5), 22(5), 26(4), 27(6), 28(7), 32(3) (with arts. 22(6), 26(5), 37)

Pt. 1 applied (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), arts. 1, 13(5), 18(6), 23(7), 24(4), 28(4), 29(7), 30(7), 37(3), 38(4) (with arts. 24(5), 28(5), 39)

Pt. 1 applied (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), arts. 1, 13(6) , 14(5), 18(10), 19(5), 25(5), 29(4), 30(6), 31(7), 36(3), 37(4) (with arts. 4, 5(3))

Pt. 1 applied (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), arts. 1, 11(4), 16(10), 24(3), 18(5), 25(6), 26(7), 29(3) (with arts. 24(4)(5), 26(8), 29(4), 39)

Pt. 1 applied (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 12(6), 21(10), 22(5), 26(3), 32(3)(5), 33(6), 34(7) (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))

Pt. 1 applied (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), arts. 1, 23(4), 25(6), 29(3) (with art. 23(5))

Pt. 1 applied (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), arts. 1, 15(10), 16(5), 24(6), 29(4), 30(6)(17) (with arts. 29(5), 35, 36)

Pt. 1 applied (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), arts. 1, 23(4), 26(4), 27(6), 28(7), 31(3) (with art. 23(5), 27(7)(8)(11), 28(7), 35)

Pt. 1 applied (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), arts. 1(2), 11(6), 16(10), 17(5), 19(8), 21(4), 25(4), 26(8), 27(7), 30(3), 31(4) (with arts. 21(5), 37, 38)

Pt. 1 applied (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), arts. 1, 14(5), 19(6), 23(5), 27(6), 28(7), 36(4), 41(7) (with art. 43)

Pt. 1 applied (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), arts. 1, 13(4), 14(7), 16(4), 18(10), 19(5), 23(5), 27(4), 28(6), 29(7), 35(3), 36(4)

Pt. 1 applied (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), arts. 1(2), 9(6), 13(6), 19(5), 22(4), 24(7), 25(7), 34(6) (with arts. 19(6), 24(8), 25(8), 39, 40, Sch. 8 para. 19)

Pt. 1 applied (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), arts. 1, 13(6), 14(6), 20(9), 22(10), 24(5), 32(3), 33(6), 34(7) (with arts. 32(4)(5), 43, 44)

Pt. 1 applied (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), ss. 9(8), 16(4), 55(6)(a), 70(1), Sch. 16 para. 9(5)

Pt. 1 applied (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), arts. 1, 13(5), 17(10), 18(5), 19(3), 22(4), 24(3), 25(3), 26(8), 27(6), 32(3) (with arts. 24(4), 25(4))

Pt. 1 applied (29.3.2017) by The Glyn Rhonwy Pumped Storage Generating Station Order 2017 (S.I. 2017/330), arts. 1, 11(3), 13(6), 18(5), 22(6), 23(5) (with arts. 25, 31)

Pt. 1 applied (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), arts. 1, 13(8), 17(10), 18(5), 19, 22(4), 27(6), 28(7), 30(4) (with arts. 27(11), 30(5))

Pt. 1 modified (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), arts. 1, 31(4), 33(3)

Pt. 1 applied (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 16(6), 24(5), 25(5), 26(6), 27(7), 31(3) (with arts. 24(6), 25(7), 27(8))

Pt. 1 applied (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), arts. 1, 13(6), 17(10), 18(5), 27(4)(5), 29(8), 30(7), 28(8), 38(4) (with arts. 17(9), 22, 28(9), 29(12))

Pt. 1 applied (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), arts. 1, 18(4), 22(4), 23(6), 24(7), 31(3) (with arts. 5(9), 18(5), 24(8), 36, 37, Sch. 8 para. 34)

Pt. 1 applied (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), arts. 1, 9(4), 10(6), 13(3), 16(10), 18(5), 19(3), 28(6), 29(7), 32(4) (with art. 32(5), Sch. 8 para. 20)

Pt. 1 applied (with modifications) (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), arts. 1, 27(3)(5) (with Sch. 8 para. 20)

Pt. 1 applied (15.11.2017) by The Network Rail (Summerway Overbridge) Order 2017 (S.I. 2017/1027), arts. 1, 3(2), 4(6), 6(2) (with art. 4(7))

Pt. 1 applied (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), arts. 1, 5(4), 7(10), 9(6), 11(3) (with arts. 5, 9(7))

Pt. 1 applied (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 9(4)(5), 10(6), 16(10), 17(5), 23(6), 24(7), 27(5), 31(3) (with arts. 17(6), 24(8), 27(6), 32(2))

Pt. 1 applied (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 14(5), 15(6), 19(10), 20(5), 26(5), 30(4), 31(6), 32(7), 38(3), 39(4) (with arts. 4, 18(9), 30(5), 31(7), 32(8), 37)

Pt. 1 applied (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 12(6), 15(3), 21(10), 23(5), 24(3), 37(3), 38(6), 39(7), 42(4) (with arts. 37(5), 39(8), 55-57, Sch. 8 para. 13)

Pt. 1 applied (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 12(6), 18(7), 20(10), 23(5), 31(3), 32(6), 33(7), 35(4), 42(4) (with arts. 30(7)(5), 42(3), 58, 59)

Pt. 1 applied (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 9(6), 13(7), 15(10), 16(5), 23(3), 24(6), 25(7), 32(3) (with arts. 16(6), 23(5), 24(7)(8), 25(8), 33(2))

Pt. 1 applied (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 9(7), 10(5), 15(10), 13(3), 16(5), 18(3), 23(5), 28(4), 29(4)(9), 30(4)(10) (with arts. 28(5), 29(10), 30(11))

Pt. 1 applied (4.6.2018) by The Network Rail (Kings Mill No. 1 Level Crossing) (Land Acquisition and Closure) Order 2018 (S.I. 2018/571), arts. 1, 3(4), 9(6), 10(5), 13(4)(5) (with arts. 3(5), 9(6), 10(6), 13(7))

Pt. 1 applied (28.6.2018) by The High Speed Rail (London West Midlands) (Greatmoor Railway Sidings Etc.) Order 2018 (S.I. 2018/693), arts. 1, 5(7), 6(5), 14(3)

Pt. 1 applied (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 10(6), 11(6), 17(15), 24(6), 23(4), 25(7), 27(5), 30(3) (with arts. 17(16), 23(5), 24(7), 25(8), 27(6), 31(2))

Pt. 1 applied (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), arts. 1, 5(7), 7(3), 8(15), 9(6), 14(6), 17(3) (with arts. 5(8), 8(17), 14(7), 17(5))

Pt. 1 applied (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 12(5), 13(6), 18(10), 19(5), 24(5), 28(4), 29(6), 30(7), 34(3), 35(4) (with arts. 3(3), 5, 22)

Pt. 1 applied (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), arts. 1, 11(5), 15(5), 21(5), 25(4)(5), 26(6)(7), 27(7)(8), 31(3), 32(10) (with arts. 6, 21(6), 42)

Pt. 1 applied (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 12(7), 13(5), 16(3), 19(10), 20(5), 21(3), 27(4)(5), 29(4)(5), 32(6), 33(7) (with arts. 32(7), 33(8), 55, 56)

Pt. 1 applied (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 11(6), 12(4), 17(5), 22(5), 26(4), 27(6), 28(7), 32(4) (with arts. 21(6), 26(5), 27(7), 28(8), 30)

Pt. 1 applied (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 8(6), 9(7), 10(3) (with art. 18)

Pt. 1 applied (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 11(6), 12(5), 17(5), 23(5), 27(4), 28(6), 29(7), 34(4)

Pt. 1 applied (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 12(5), 13(4), 17(5), 23(5), 27(4), 28(7), 29(7), 34(3), 35(10) (with arts. 23(6), 27(5), 28(8), 29(8), 35(9))

Pt. 1 applied (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 10(4), 11(4), 22(5), 24(3), 25(5), 26(5), 33(4), 34(6), 35(7), 42(3) (with arts. 26(6), 33(5), 34(7), 35(8), Sch. 13 Pt. 1 para. 19)

Pt. 1 modified (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), art. 1, Sch. 12 para. 2 (with Sch. 13 Pt. 1 para. 19)

Pt. 1 applied (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), arts. 1, 8(4), 9(7), 10(3), 13(6), 14(6), 20(10), 21(15), 27(4) (with arts. 27(5), 37(2))

Pt. 1 applied (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 15(5), 16(6), 21(10), 22(5), 28(5), 32(4), 33(6), 34(7), 39(3), 40(2)(b) (with arts. 3(1), 32(5), 33(7), 34(8))

Pt. 1 applied (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), arts. 1, 22(10), 23(9), 33(4), 34(6), 35(7) (with arts. 47, 48, Sch. 10 para. 19)

Pt. 1 applied (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 11(5), 27(7), 31(3) (with arts. 7, 11(6), 27(8))

Pt. 1 applied (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 4, 21(3) (with arts. 7, 21(4)(5))

Pt. 1 applied (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 12(5), 13(6), 18(10), 19(5), 24(5), 28(4), 29(6), 30(7), 34(6), 37(4) (with arts. 5, 24(6), 28(5), 29(8), 30(8), 32, 44)

Pt. 1 applied (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 13(6), 14(3), 19(6), 20(10), 21(3), 26(5), 30(4), 31(6), 32(7) (with arts. 7, 20(9), 26(6), 30(5), 31(7), 32(8), 34)

Pt. 1 applied (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 11(5), 14(3), 16(11), 17(5), 18(3), 19(4), 28(4), 30(4), 33(7), 34(6)(8), 44(5) (with arts. 28(5), 30(5), 34(9), 33(8), 51, 56, 57)

Pt. 1 applied (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 10(5), 11(4), 22(5), 24(3), 25(7), 26(5), 33(4), 34(6), 35(7), 41(3) (with arts. 10(6), 26(6), 33(5), 34(7), 35(8))

Pt. 1 applied (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 16(7), 17(7), 22(11), 23(5), 28(5), 32(4), 33(6), 34(9), 39(5) (with arts. 17(8), 28(6), 32(5), 33(8), 34(10), 37)

Pt. 1 applied (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 12(5), 13(6), 18(11), 19(5), 24(5), 28(4), 29(6), 30(7), 35(4) (with arts. 5, 13(7), 18(10), 28(5), 29(8), 30(8), 44)

Pt. 1 applied (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 10(6), 14(10), 15(5), 23(4), 24(6), 25(7), 19(4), 32(3), 33(4) (with arts. 14(9), 19(5), 23(5), 24(7), 25(8), 37)

Pt. 1 applied (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 11(6), 16(6), 21(4), 25(4), 26(6), 27(8), 35(3), 39(5) (with arts. 21(5), 25(5), 26(7), 27(9), 41, 42, 43, Sch. 16 para. 66)

Pt. 1 applied (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 12(5), 13(6), 18(10), 19(5), 24(5), 28(4), 29(6), 31(7), 35(3) (with arts. 5, 18(9), 24(6), 28(5), 29(8), 31(8), 33)

Pt. 1 applied (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 16(5), 22(5), 26(4), 27(7), 28(8), 32(3), 33(10) (with arts. 22(6), 26(5), 27(8), 28(9), 33(9), Sch. 9 para. 144)

Pt. 1 applied (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), arts. 7(6), 8(7), 10(3) (with art. 11(2))

Pt. 1 applied (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 14(6), 15(5), 21(11), 22(5), 29(5), 35(5)(7), 36(6)(8), 49(4), 53(3), 54(4) (with arts. 29(6), 35(8), 36(9))

Pt. 1 applied (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 13(7), 14(3), 19(10)(11), 20(7), 25(5), 29(4), 30(6), 31(8), 42(5), 43(4) (with arts. 19(9), 25(6), 29(5), 30(8), 31(9), 32, Sch. 9 para. 36)

Pt. 1 applied (11.11.2020) by The West Burton C (Gas Fired Generating Station) Order 2020 (S.I. 2020/1148), arts. 1, 9(5), 14(5)

C2

Pt. 1 applied (2.12.2020) by The Network Rail (London to Corby) (Land Acquisition) Order 2020 (S.I. 2020/1259), arts. 1(1), 9(4), 10(6), 11(4), 12(7), 13(5), 15(4), 19(14) (with art. 9(5))

C3

Pt. 1 applied (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), arts. 1, 9(4), 10(6), 14(4), 15(4), 18(15), 23(6), 24(7), 26(5), 27(4), 32(3)

C4

Pt. 1 applied (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), arts. 1, 9(6), 13(4), 14(3), 18(14), 22(6), 23(7), 25(2), 28(3) (with arts. 22(7), 23(8), 25(3))

C5

Pt. 1 applied (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 10(6), 16(10), 17(5), 21(4), 25(4)(5), 26(6), 27(7), 34(3), 35(5) (with arts. 16(9), 21(5), 26(7), 27(8), 40, 41, Sch. 9 Pt. 5 para. 18)

C6

Pt. 1 applied (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 15(6), 16(4), 21(10), 22(5), 27(5), 31(4)(5), 32(6), 33(8), 37(3), 38(4) (with arts. 5, 21(9), 32(8), 33(9), 35, Sch. 27 para. 36)

C7

Pt. 1 applied (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 8(8), 14(6), 64(1), Sch. 2 para. 11(6), Sch. 4 para. 4(3), Sch. 14 para. 4(2), Sch. 15 para. 4(5), Sch. 15 para. 7(4), Sch. 15 para. 8(5) (with Sch. 14 para. 4(3), Sch. 15 para. 4(6), Sch. 15 para. 7(5), Sch. 15 para. 8(6))

C8

Pt. 1 applied (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 15(5), 16(10), 21(10), 22(5), 28(5), 32(4), 33(6), 34(7), 38(3) (with arts. 4, 21, 28(6), 32(5), 33(7), 34(8), 36, 47)

C9

Pt. 1 applied (15.3.2021) by The Wheelabrator Kemsley K3 Generating Station Order 2021 (S.I. 2021/173), arts. 1, 11(7), 12(3)

C10

Pt. 1 applied (1.4.2021) by The Network Rail (Ferryboat Lane Footbridge Reconstruction) (Land Acquisition) Order 2021 (S.I. 2021/299), arts. 1, 6(6), 7(6), 9(2) (with art. 11)

C11

Pt. 1 applied (16.4.2021) by The Network Rail (Chart Leacon) Order 2021 (S.I. 2021/419), arts. 1, 8(7), 11(5), 13(3), 14(15) (with art. 11(6), Sch. 5 Pt. 2)

C12

Pt. 1 applied (1.9.2021) by The Network Rail (Teddington Station Access for All) Order 2021 (S.I. 2021/937), arts. 1, 10(4), 11(6), 14(4), 16(14), 19(3), 20(6) (with arts. 10(5), 11(7), 14(5))

C13

Pt. 1 applied (2.12.2021) by The South Humber Bank Energy Centre Order 2021 (S.I. 2021/1259), arts. 1, 13(5), 16(5), 17(3) (with Sch. 8 para. 48)

C14

Pt. 1 applied (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 8(6), 11(3), 13(10), 14(13)(14), 27(3)(5), 28(6)(7), 29(7), 31(2), 35(4)(5), 40(3), Sch. 10 para. 2 (with arts. 15, 50, Sch. 11 para. 29)

C15

Pt. 1 applied (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 11(9), 16(7), 21(4), 25(4), 26(6), 27(8), 35(3), 36(5) (with arts. 21(5), 26(7), 27(9), 41, 42, Sch. 17 para. 66)

C16

Pt. 1 applied (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 11(6), 16(6), 21(4), 25(4), 26(6), 27(8), 35(3), 36(5) (with arts. 21(5), 25(5), 26(7), 27(9), 41, 42, Sch. 16)

C17

Pt. 1 applied (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 13(6), 17(5), 23(5), 27(4), 28(6), 29(7), 35(3) (with art. 27(5), Sch. 8 Pt. 6 para. 19)

C18

Pt. 1 applied (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 11(6), 12(4), 15(3), 21(10), 23(6), 24(3), 36(4), 38(7), 41(7) (with arts. 36(5), 55)

C19

Pt. 1 applied (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 10(3), 11(4), 12(6), 17(6), 21(4), 25(4), 26(6), 27(7), 34(3), 35(4) (with arts. 21(5), 26(7), 27(8), 40, 41)

C20

Pt. 1 applied (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 10(3), 11(4), 12(6), 17(6), 21(4)(8), 25(4), 26(6), 27(7), 34(2)(4) (with arts. 21(5), 25(5), 26(7), 27(8), 40, 41)

C21

Pt. 1 applied (27.4.2022) by The Little Crow Solar Park Order 2022 (S.I. 2022/436), arts. 1, 10(5), 16(3)

C22

Pt. 1 applied (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 12(5), 13(8), 18(10), 19(5), 24(5), 28(4), 29(6), 30(7), 34(3), 35(4) (with art. 28(5))

C23

Pt. 1 applied (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 14(5), 15(7), 20(11), 21(5), 27(5), 31(4), 32(6), 33(7), 39(3), 40(4) (with arts. 6, 20(9), 27(6), 31(5), 32(8), 34, 36)

C24

Pt. 1 applied (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 13(5), 14(3), 15(4), 21(11), 22(5), 23(3), 24(4), 29(5), 33(4), 34(6), 35(9) (with arts. 5, 21(9), 33(5), 34(8)(11), 35(10), 36, 38)

C25

Pt. 1 applied (30.6.2022) by The Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (S.I. 2022/651), arts. 1, 9(6), 13(4), 14(3), 17(13), 21(6), 22(7), 24(5), 25(4), 30(3) (with arts. 14(4), 21(7), 22(8), 24(6))

C26

Pt. 1 applied (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 16(5), 17(7), 22(10), 23(5), 29(5), 33(4), 34(6), 35(7), 39(3) (with arts. 4, 29(6), 33(5), 50)

C27

Pt. 1 applied (1.8.2022) by The Northumberland Line Order 2022 (S.I. 2022/820), arts. 1, 4(6), 6(3), 7(4), 8(6), 9(6), 19(6), 20(5), 23(5) (with Sch. 10 paras. 21, 43)

C28

Pt. 1 applied (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order 2022 (S.I. 2022/871), arts. 1, 8(7), 9(7), 12(5), 14(3), 15(3), 16(14) (with art. 12(6))

C29

Pt. 1 applied (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) (No. 2) Order 2022 (S.I. 2022/872), arts. 1, 8(7), 9(7), 12(5), 14(3), 15(3), 16(14) (with art. 12(6))

C30

Pt. 1 applied (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 16(8), 18(6), 19(9), 20(3), 26(10), 33(4), 38(4)(5), 39(6), 41(8)(9), 48(3)(4), 81(7) (with arts. 62, 76, 87, Sch. 19 paras. 4, 78)

C31

Pt. 1 applied (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 15(5), 16(6), 21(10), 22(5), 28(5), 32(4), 33(6), 34(8), 39(3), 40(4) (with arts. 4, 28(6), 32(5), 33(7), 34(9), 53)

C32

Pt. 1 applied (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 16(5), 17(6), 21(11), 22(6), 29(5), 36(4), 37(6), 38(9), 42(3), 43(5), 56(3) (with arts. 21(9), 23, 36(5), 37(8), 38(10), 40, 53, Sch. 9 para. 65)

C33

Pt. 1 applied (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), arts. 1, 12(5), 13(5), 17(10), 18(5), 24(5), 28(4), 29(6), 30(7), 34(3) (with arts. 5, 24(6), 28(5), 29(8), 30(8), 32, 40)

C34

Pt. 1 applied (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 14(6)(7), 16(6), 21(3), 23(10), 24(15), 25(4), 33(3), 34(7), 35(7), 36(5), 39(5), 43(3) (with arts. 24(16), 33(5), 34(8), 35(8), 39(6), 46(2), Sch. 18 para. 2, Sch. 19 para. 61)

C35

Pt. 1 applied (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 16(5), 17(6), 22(10), 23(5), 29(5), 33(4), 34(6), 35(8), 39(3), 40(4) (with arts. 4, 29(6), 33(5), 34(7), 35(9), 37, 52, Sch. 9 para. 82)

C36

Pt. 1 applied (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 14(4), 15(7), 20(6), 21(4), 23(5), 28(4), 32(4), 33(6), 34(8), 43(9), 44(3) (with arts. 32(5), 51)

C37

Pt. 1 applied (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 15(5), 16(6), 22(10), 23(5), 29(5), 33(4), 34(6), 35(8), 40(4) (with arts. 4, 29(6), 33(5), 34(7), 35(9), 37)

C38

Pt. 1 applied (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 14(5), 15(5), 20(10), 21(5), 26(5), 30(4), 31(6), 32(7), 36(6), 38(4) (with art. 5)

C39

Pt. 1 applied (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 15(5), 16(3), 17(3), 22(5), 23(11), 26(4), 27(7), 28(7), 33(3), 34(10) (with arts. 22(6), 26(5), 27(8)(13), 28(8), 32, 34(9), Sch. 10 paras. 26(2), 68)

C40

Pt. 1 applied (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 8(4), 11(6), 14(3), 17(10), 24(4), 25(6), 26(7), 27(5), 29(5), 33(3) (with arts. 24(5), 25(7), 26(8), 29(6), 34(2), Sch. 12 paras. 5, 47, 79)

C41

Pt. 1 applied (13.2.2023) by The East Northamptonshire Resource Management Facility Order 2023 (S.I. 2023/110), arts. 1, 12(5), 13(3) (with art. 9)

C42

Pt. 1 applied (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 16(5), 17(7), 22(10), 23(5), 29(5), 33(4), 34(6), 35(8), 39(3), 40(4) (with arts. 4, 29(6), 33(5), 34(8), 35(9), 37, 50)

C43

Pt. 1 applied (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 11(5), 16(10), 17(5), 21(4), 26(4), 27(7), 28(7), 36(3), 37(4) (with arts. 16(9), 21(5), 26(5), 27(8)(11)(13), 28(8))

C44

Pt. 1 applied (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 13(6), 14(3), 16(3), 19(4), 21(5), 22(10), 23(3), 28(4), 33(7), 34(8) (with arts. 5, 22(9), 28(5), 33(9)(13), 34(9), 36, 53, Sch. 8 paras. 6, 64)

C45

Pt. 1 applied (2.8.2023) by The Rother Valley Railway (Bodiam to Robertsbridge Junction) Order 2023 (S.I. 2023/815), arts. 1, 11(4), 12(5), 17(13), 22(6), 23(7), 25(4), 28(3) (with art. 42)

C46

Pt. 1 applied (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 10(6), 16(10), 17(5), 22(5), 27(4), 28(6)(14), 29(7)(14), 36(4), 37(4) (with arts. 16(9), 22(6), 27(5), 28(7)(11), 29(8), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 2, Sch. 9 Pt. 9 para. 4)

C47

Pt. 1 applied (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 10(7), 11(5), 14(11), 15(6), 17(3), 23(4), 28(4), 29(6), 30(7) (with arts. 6(2), 18, 23(5), 28(5), 29(7), 30(8), 32, Sch. 11 paras. 5, 30)

C48

Pt. 1 applied (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 15(5), 16(6), 21(10), 22(5), 28(5), 32(4), 33(7), 34(8), 39(3), 40(4) (with arts. 4, 21(9), 28(6), 32(5), 33(8), 34(9), 36, 45, Sch. 9 paras. 6, 46, 54(1))

C49

Pt. 1 applied (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 11(4), 12(5), 15(5), 16(10), 22(4), 26(4), 27(6), 28(7), 33(3), 34(5)

C50

Pt. 1 applied (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 12(5), 16(5), 20(4), 24(4), 25(7), 26(7), 31(3), 32(10) (with arts. 20(5), 25(13), 26(8), 32(9), 43, Sch. 12 paras. 5, 24)

C51

Pt. 1 applied (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 18(5), 19(6), 25(11), 26(5), 31(5), 34(3), 39(4), 40(6), 41(9), 46(3), 47(11), 53(3), 56(4) (with arts. 4, 25(9), 31(6), 40(8), 41(10), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)

C52

Pt. 1 applied (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 13(5), 18(3), 19(10), 20(5), 26(5), 30(4), 31(7), 32(8) (with arts. 19(9), 32(9), 42, 43, Sch. 12)

C53

Pt. 1 applied (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 13(6), 14(3), 19(6), 20(10), 21(3), 27(4), 31(4), 32(6), 33(7) (with arts. 20(9), 27(5), 31(5), 32(7)(12), 33(8), Sch. 11 paras. 4, 5, 22, 37, 47, 80, 82, 110)

C54

Pt. 1 applied (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 10(6), 11(5), 14(11), 15(6), 17(5), 23(4), 28(4), 29(6), 30(7) (with arts. 18, 23(5), 28(5), 29(7), 30(8), 35, Sch. 9)

C55

Pt. 1 applied (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 14(7), 15(3), 20(10), 21(7), 26(4), 35(4), 36(8), 37(8), 38(8), 39(7), 46(3), 53(5) (with arts. 20(9), 26(5), 35(5), 36(9)(12), 37(9)(12), 38(9)(12)(13), 39(8), 44, Sch. 15)

C56

Pt. 1 applied (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 13(4), 15(6), 18(3), 22(7), 23(10), 29(4), 33(4), 34(6), 35(7), 39(3), 40(4) (with arts. 21, 29(5), 33(5), 34(7), 35(8), 41, Sch. 10)

C57

Pt. 1 applied (25.4.2024) by The Network Rail (Church Fenton Level Crossing Reduction) Order 2024 (S.I. 2024/526), arts. 1, 8(3), 11(6), 17(15), 22(4), 23(6), 24(7), 26(5), 30(3) (with arts. 22(5), 23(7), 24(8), 26(6), 39, 40)

C58

Pt. 1 applied (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 10(6), 15(10), 16(6), 20(4), 24(4), 25(6), 26(7), 33(3), 34(4) (with arts. 20(5), 24(5), 25(7), 26(8), 35, 36, Sch. 14)

C59

Pt. 1 applied (13.6.2024) by The Network Rail (Cambridge Re-Signalling) Order 2024 (S.I. 2024/724), arts. 1, 3(3), 8(6), 9(6), 11(6) (with arts. 3(4), 13, Sch. 6)

C60

Pt. 1 applied (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 16(6), 17(6), 23(2), 25(10), 26(5), 31(6), 35(4), 36(6), 37(8), 41(3), 42(4) (with arts. 6, 25(9), 31(6), 35(5), 36(8), 37(9), Sch. 10)

C61

Pt. 1 applied (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 11(5), 15(10), 16(6), 20(4), 25(4), 26(8), 27(7), 35(3), 36(4) (with arts. 25(5), 26(9)(12), 27(8), 44, Sch. 12)

C62

Pt. 1 applied (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 11(5), 12(7), 17(10), 18(6), 23(4), 28(4), 29(7), 30(7), 38(3) (with arts. 17(9), 23(5), 28(5), 29(8)(11)(13), 30(8), 32, Sch. 15)

C63

Pt. 1 applied (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 11(5), 16(10), 17(5), 21(4), 26(4), 27(7), 28(7), 36(3), 37(4) (with arts. 21(5), 27(8)(11)(13), 28(8), 45, Sch. 14)

C64

Pt. 1 applied (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 11(5), 12(3), 18(10), 19(5), 23(4), 28(4), 29(7), 30(7), 38(3), 39(4) (with arts. 18(9), 23(5), 28(5), 29(8)(11)(13), 30(8), 48, Sch. 15)

C65

Pt. 1 applied (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 15(8), 20(11), 21(7), 24(5), 25(8), 26(8), 27(7), 28(4), 36(5), 47(3), 48(5), 49(4) (with arts. 20(9), 24(6), 25(9)(12), 26(9)(12), 27(8), 28(5), 36(6), 40, Sch. 14)

C66

Pt. 1 applied (9.10.2024) by Development The M3 Junction 9 Consent Order 2024 (S.I. 2024/752), arts. 1, 16(5), 17(4), 22(10), 23(5), 29(5), 33(4), 34(6), 35(7), 39(3), 40(4) (with arts. 4, 29(6), 33(5), 34(7), 35(8), 37, Sch. 10) (as amended by S.I. 2024/1020, Sch.)

Pt. 1 applied (25.10.2024) by The Associated British Ports (Immingham Eastern Ro-Ro Terminal) Development Consent Order 2024 (S.I. 2024/1014), arts. 1, 12(3), 26(5), 27(10) (with arts. 12(4), 27(9), 36, 40, Sch. 4)

C67

Pt. 1 applied (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 10(6), 12(6), 17(9), 18(3), 20(10), 21(15), 27(3), 28(6), 29(7), 30(5), 32(5), 37(3), 45(3) (with arts. 21(16), 27(5), 28(7), 29(8), 32(6), Sch. 15)

C68

Pt. 1 applied (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), arts. 1, 11(5), 12(3), 17(9), 18(5), 23(4), 28(4), 29(7), 30(7), 38(4), 39(4) (with arts. 23(5), 28(5), 29(8)(11)(13), 30(8), 47, Sch. 15)

C69

Pt. 1 applied (17.2.2025) by The Heckington Fen Solar Park Order 2025 (S.I. 2025/85), arts. 1, 11(3), 15(10), 16(6), 20(4), 25(5), 26(7), 27(7), 35(3), 36(4) (with arts. 20(5), 26(8)(11), 27(8), 43, Sch. 13)

C70

Pt. 1 applied (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 11(5), 13(8), 14(3), 19(7), 20(11), 26(6), 28(4), 31(8), 32(7), 53(3), 54(5) (with arts. 20(9)(13), 26(7), 28(5), 31(9)(12), 32(8), 48, 59, Sch. 14)

C71

Pt. 1 applied (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 14(4), 15(4), 27(4), 31(4), 32(6), 33(8), 38(5), 39(3), 40(5) (with arts. 27(5), 31(5), 32(7), 33(9), Sch. 14)

C72

Pt. 1 applied (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 12(6), 13(3), 14(6), 18(4), 20(11), 21(5), 23(3), 24(5), 29(5), 34(4), 35(7), 36(8) (with arts. 5, 29(6), 34(5), 35(9), 36(9), 43, 53(7), Sch. 14)

C73

Pt. 1 applied (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), arts. 1, 12(7), 20(9), 21(6), 23(3), 24(4), 25(4), 31(6), 35(7), 36(7), 43(4) (with art. 50)

C74

Pt. 1 applied (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 13(5), 14(3), 20(10), 21(6), 22(4), 28(5), 32(4), 33(6), 34(9) (with art. 39, Sch. 8)

C75

Pt. 1 applied (28.4.2025) by The Rampion 2 Offshore Wind Farm Order 2025 (S.I. 2025/468), arts. 1, 11(6), 18(10), 19(6), 25(4), 30(4), 31(8), 32(8), 42(3), 43(5), 54(3) (with arts. 18(9), 25(5), 30(5), 31(10)(14), 32(9), 47, 48, Sch. 10)

C76

Pt. 1 applied (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 12(4), 13(5), 16(3), 20(6), 21(10), 27(4), 31(4), 32(6), 33(7), 39(3), 40(4) (with arts. 27(5), 31(5), 32(7), 33(8), 41, Sch. 9)

C77

Pt. 1 applied (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), arts. 1, 11(5), 12(3), 18(10), 19(5), 23(4), 28(4), 29(7), 30(7), 38(3), 39(5) (with arts. 18(9), 23(5), 28(5), 29(8)(11)(13), 30(8), 49, Sch. 14)

C78

Pt. 1 applied (25.6.2025) by The M5 Junction 10 Development Consent Order 2025 (S.I. 2025/795), arts. 1, 15(5), 16(6), 19(10), 20(6), 26(5), 30(4), 31(6), 32(8), 36(3), 37(4) (with arts. 4, 19(9), 26(6), 30(5), 31(7), 32(9), 43, Sch. 9)

C79

Pt. 1 applied (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), arts. 1, 11(6), 15(10), 16(5), 20(4), 25(4), 26(7), 27(7), 36(3), 37(4) (with arts. 15(9), 20(5), 25(5), 26(8)(11)(13), 27(8), Sch. 10)

C80

Pt. 1 applied (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 12(6), 17(5), 18(10), 23(4), 27(4), 28(6), 29(7), 34(3), 35(5) (with arts. 18(9), 23(5), 27(5), 28(7), 29(8), 37, 38, Sch. 10)

C81

Pt. 1 applied (14.8.2025) by The Byers Gill Solar Order 2025 (S.I. 2025/934), arts. 1, 13(6), 19(10), 20(5), 24(4), 29(4), 30(7), 31(7), 38(3), 39(4) (with arts. 19(9), 24(5), 29(5), 30(8)(10)(12), 31(8), 43, Sch. 11)

C82

Pt. 1 applied (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), arts. 1, 14(5), 16(4), 19(11), 20(5), 25(5), 29(4), 30(6), 31(9), 36(4) (with arts. 5, 19(9), 25(6), 29(5), 30(8), 31(10), 34, Sch. 9)

C83

Pt. 1 applied (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 13(4), 14(7), 23(10), 24(5), 25(3), 31(4), 35(4), 36(6), 38(9) (with arts. 5, 9(6), 23(9), 31(5), 35(5), 36(8)(11), 38(10), 43, Sch. 9)

C84

Pt. 1 applied (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), arts. 1, 18(5), 19(6), 24(11), 25(5), 30(5), 38(4), 39(6), 40(9), 45(3), 46(10), 52(3), 57(5) (with arts. 4, 9, 24(9), 30(6), 39(8), 40(10), 51, Sch. 9)

C85

Pt. 1 applied (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 12(5), 13(7), 14(3), 19(10), 20(5), 24(4), 29(4), 30(7), 31(7), 39(3), 40(5) (with arts. 12(8), 19(9), 24(5), 29(5), 30(8)(11)(13), 31(8), 49, Sch. 15)

C86

Pt. 1 applied (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), arts. 1, 13, 17, 20, 26, 30, 32, 38, 43 (with art. 40, Sch. 13)

C87

Pt. 1 applied (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 15, 16, 22, 23, 24, 32, 36, 37, 38 (with Sch. 12)

C88

Pt. 1 applied (29.12.2025) by The Helios Renewable Energy Project Order 2025 (S.I. 2025/1372), arts. 1, 13, 18, 19, 23, 28, 29, 30, 37, 38 (with Sch. 9)

C89

Pt. 1 applied (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 13, 14, 19, 20, 25, 29, 30, 32, 36, 37 (with arts. 39, 40, Sch. 9)

C90

Pt. 1 applied (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 15(5), 16(3), 17(4), 22(11), 23(6), 24(3), 25(4), 30(5), 37, 38, 39 (with arts. 40, 45, Sch. 9) (which affecting provisions were superseded by S.I. 2026/537, arts. 1, 15(5), 16(3), 17(4), 22(11), 23(6), 24(3), 25(4), 30(5), 37, 38, 39 (with arts. 40, 45, Sch. 9))

C91

Pt. 1 applied (3.3.2026) by The Network Rail (Kettering to Wigston South Junction and Napsbury Lane) (Land Acquisition) Order 2026 (S.I. 2026/141), arts. 1, 8(5), 9(7), 11(4), 12(3)

C92

Pt. 1 applied (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), arts. 1(2), 10(7), 11(6), 17(6), 21, 25, 26, 27, 35(3), 36(5) (with arts. 42, 43, Sch. 18)

C93

Pt. 1 applied (11.3.2026) by The Fenwick Solar Farm Order 2026 (S.I. 2026/151), arts. 1, 12(5), 14(3), 19(10), 20(5), 24, 29, 30, 31, 39(3), 40(5) (with Sch. 14)

C94

Pt. 1 applied (30.4.2026) by The Springwell Solar Farm Order 2026 (S.I. 2026/419), arts. 1, 13(5), 14(7), 19(10), 20(5), 24(4), 29(4), 30(7), 31(7), 39(3), 40(4) (with art. 48)

C95

Pt. 1 applied (5.6.2026) by The North Falls Offshore Wind Farm Order 2026 (S.I. 2026/567), arts. 1, 11(4), 12(6), 18(10), 19(6), 24, 29, 30, 31, 38(4), 39(4) (with arts. 44, 45, Sch. 14)

C96

Pt. 1 applied (5.6.2026) by The Dogger Bank South East and West Offshore Wind Farms Order 2026 (S.I. 2026/577), arts. 1, 10(6), 11(4), 15(3), 17(10), 18(6), 23(4), 29, 30, 31, 38(3), 39(5) (with arts. 40, 41, Sch. 15)

C97

Pt. 1 applied (24.6.2026) by The Network Rail (Old Oak Common Great Western Mainline Track Access) Order 2026 (S.I. 2026/591), arts. 1, 7(5), 9(3) (with arts. 9(4), 10)

C98

Pt. 1 applied (23.7.2026) by The Peartree Hill Solar Farm Order 2026 (S.I. 2026/869), arts. 1, 14(6), 16(3), 19(10), 20(5), 25, 30, 31, 32, 40(3), 41(4) (with art. 37, Sch. 11)

C99

Pt. 1 applied (24.7.2026) by The Dean Moor Solar Farm Order 2026 (S.I. 2026/754), arts. 1, 14(6), 16(3), 19(10), 20(5), 25, 30, 31, 32, 38(3) (with Sch. 13)

C100

Pt. 1 applied (30.7.2026) by The One Earth Solar Farm Order 2026 (S.I. 2026/934), arts. 1, 12(5), 13(3), 18(10), 19(5), 23, 28(4), 29, 30(7), 38(3), 39(4) (with arts. 47, 48)

C101

Pt. 1 applied (14.9.2026) by The Beacon Fen Energy Park Order 2026 (S.I. 2026/1025), arts. 1, 15(3), 16(5), 21, 22(6), 28, 32(7), 42 (with art. 39, Sch. 11 para. 131)